ML22024A006

From kanterella
Jump to navigation Jump to search
Breakout Questions - Structural Scoping and Screening
ML22024A006
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/20/2022
From: Angela Wu
NRC/NRR/DNRL/NLRP
To:
Wu A, 301-415-2995
Shared Package
ML22024A002 List:
References
Download: ML22024A006 (1)


Text

ONS SLRA: Breakout Questions SLRA Section 2.4 - Structural Scoping and Screening

Question SLRA SLRA Background / Issue Discussion Question / Request Number Section Page (As applicable/needed) 1 2.4.4 2 -304 SLRA drawing KSLRD - 109A - 1.1, related Is the trash rack filter that is and SLRA to the Keowee Hydro Station Service listed in SLRA Tabl e 2.4.4-1 DWG Water System, contains a Note 7 which the component that is referred KSLRD - states, intake screen is evaluated as a to by Note 7 in the drawing?

109A -1.1 structural component.

Are traveling screens or trash SLRA Table 2.4.4-1 shows the structural racks used on the intake for scoping results for the Keowee Hydro any other systems ? If so are Station and does not list intake screens as they in the scope of SLR?

a structural component receiving an AMR.

The table does include an entry for trash rack filter.