Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML21196A076, ML22045A053, ML22111A314, ML22193A254, ML22349A148, ML24255A332, RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1, RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3, RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4, RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3, RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a, RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L, RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a, RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6, RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a, RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b
|
MONTHYEARML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 Project stage: Request ML21158A1932021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses Project stage: Request RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 Project stage: Request ML21196A0762021-07-23023 July 2021 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review Project stage: Other ML21271A5862021-09-21021 September 2021, 22 September 2021, 28 September 2021 SLRA - RAI B2.1.27-1 Project stage: Request ML21270A2492021-09-27027 September 2021 Beyond Nuclear and Sierra Club Hearing Request Project stage: Request RA-21-0281, Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-12021-10-22022 October 2021 Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-1 Project stage: Response to RAI ML21295A7182021-10-22022 October 2021 Applicants Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club Project stage: Request ML21295A7172021-10-22022 October 2021 Notices of Appearance for Tracey M. Leroy, Paul M. Bessette, and Ryan K. Lighty on Behalf of Duke Energy Carolinas, LLC Project stage: Request RA-21-0249, Subsequent License Renewal Application Supplement 12021-10-28028 October 2021 Subsequent License Renewal Application Supplement 1 Project stage: Supplement ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 Project stage: Request ML21313A2322021-11-0404 November 2021 SLRA - Requests for Confirmation of Information - Set 1 Project stage: Request RA-21-0288, Subsequent License Renewal Application Supplement 22021-11-11011 November 2021 Subsequent License Renewal Application Supplement 2 Project stage: Supplement ML21327A2772021-11-23023 November 2021 SLRA - Requests for Additional Information (Set 1) + 2nd Round RAI B2.1.27-1a Project stage: Request ML21335A2692021-12-0101 December 2021 Petitioners Response to Duke Motion to Strike Portion of Petitioners Reply Project stage: Request RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 Project stage: Other RA-21-0316, Subsequent License Renewal Application Supplement 32021-12-15015 December 2021 Subsequent License Renewal Application Supplement 3 Project stage: Supplement RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 Project stage: Request RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a Project stage: Response to RAI ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information Project stage: Response to RAI ML22024A0422022-01-19019 January 2022 Breakout Questions - Trp 141 - Identification of TLAAs Project stage: Request ML22024A0182022-01-19019 January 2022 Breakout Questions - Trp 19 - Steam Generators Project stage: Request ML22024A0492022-01-19019 January 2022 Breakout Questions - Trp 143.9 - Cycle Projections Project stage: Request ML22024A0362022-01-19019 January 2022 Breakout Questions - Trp 60 - Fatigue Monitoring Project stage: Request ML22024A0462022-01-19019 January 2022 Breakout Questions - Trp 143.2 - Non-Class 1 Fatigue Analyses Project stage: Request ML22024A0022022-01-19019 January 2022, 20 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Duke Energy Project stage: Request ML22024A0052022-01-19019 January 2022 Breakout Questions - Scoping and Screening - Reactor Coolant System Project stage: Request ML22024A0122022-01-19019 January 2022 Breakout Questions - Trp 14 - Buried Piping Project stage: Request ML22024A0212022-01-19019 January 2022 Breakout Questions - Trp 26 - Fire Protection Project stage: Request ML22024A0482022-01-19019 January 2022 Breakout Questions - Trp 143.3 - EAF - Min Project stage: Request ML22024A0032022-01-19019 January 2022 Breakout Questions - Fire Protection Scoping and Screening Project stage: Request ML22024A0562022-01-19019 January 2022 Breakout Questions - Trps 142.1 and 149.13 - Fluence Project stage: Request ML22024A0202022-01-19019 January 2022 Breakout Questions - Trp 21 - Closed Treated Water System Project stage: Request ML22024A0402022-01-19019 January 2022 Breakout Questions - Trp 85 - No Aging Effects Project stage: Request ML22024A0162022-01-19019 January 2022 Breakout Questions - Trp 17 - Flow-Accelerated Corrosion Project stage: Request ML22024A0042022-01-19019 January 2022 Breakout Questions - Scoping - Letdown Cooler Project stage: Request ML22024A0322022-01-20020 January 2022 Breakout Questions - Trp 44 - Appendix J Project stage: Request ML22024A0342022-01-20020 January 2022 Breakout Questions - Trp 46 - Structures Monitoring Project stage: Request ML22024A0352022-01-20020 January 2022 Breakout Questions - Trp 47 - Water Control Structures Project stage: Request ML22024A0302022-01-20020 January 2022 Breakout Questions - Trp 42 - ASME XI, Subsection Iwl Project stage: Request ML22024A0082022-01-20020 January 2022 Breakout Questions - Trp 2 - Water Chemistry Project stage: Request ML22024A0412022-01-20020 January 2022 Breakout Questions - Trp 140 - Secondary Shield Wall Tendon Surveillance Project stage: Request ML22024A0432022-01-20020 January 2022 Breakout Questions - Trp 142.03 - PTS Project stage: Request ML22024A0392022-01-20020 January 2022 Breakout Questions - Trp 77 - Corrosion Structural Project stage: Request ML22024A0572022-01-20020 January 2022 Breakout Questions - Trps 149.5 and 23 - Crane and Inspection of Load Handling Project stage: Request ML22024A0332022-01-20020 January 2022 Breakout Questions - Trp 45 - Masonry Walls Project stage: Request ML22024A0552022-01-20020 January 2022 Breakout Questions - Trps 62 and 145 - Tendon Prestress Project stage: Request ML22024A0062022-01-20020 January 2022 Breakout Questions - Structural Scoping and Screening Project stage: Request ML22024A0172022-01-20020 January 2022 Breakout Questions - Trp 18 - Bolting Integrity Project stage: Request ML22024A0092022-01-20020 January 2022 Breakout Questions - Trp 3 - RPV Closure Head Studs Project stage: Request 2021-12-17
[Table View] |
Text
Oconee Nuclear Station (ONS) SLRA: Breakout Questions SLRA TLAA Section: Section 4.1, Identification of Time-Limited Aging Analyses TRP: 141 Question Number SLRA Section(s),
Table(s)
SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request A. Discussion Topics or Questions for SLRA TLAA Identification Methodology and Results -
Main Audit Portal Reference Document: ONS Calculation No. OSC-2077-03-SLR-0500, Revision 1 A.1 4.1.1, 4,1,2 Tables 4.1.4-1, 4.1.4-2, and 4.1.4-3 4
4-10 No questions at this time on those analyses identified as TLAAs in the SLRA versus those analyses that were identified either in the SLRA or the ONS calculation as not meeting one or more of the six criteria for TLAAs in 10 CFR 54.3(a).
For the SLRA, the staff confirmed the UFSAR bases for the HELB assessment do not involve time-dependent parameters defined by the current operating term (i.e., the ONS HELB basis in the CLB is different from that approved by the staff for many other NRC-licensed US PWRs)
No Questions at this time. Bases for all analyses evaluated in the ONS calculation as meeting or not meeting the definition of a TLAA in 10 CFR 54.3(a) are well explained, along with the criterion not met if the analysis is not a TLAA.
B. Discussion Topics or Questions for Regulatory Exemption Identification Methodology and Results -
Main Audit Portal Reference Document: ONS Calculation No. OSC-2077-03-SLR-0500, Revision 1 B.1 4.1.3 4-3 Topics and Regulatory Exemptions of Reference.
a) 10 CFR 50.60(b) Exemption Requested October 15, 1998 (ADAMS ML15112A279) and Approved on March 29, 1999 (ADAMS ML012050426) Under the Requirements of 10 CFR 50.12 - Exemption Request for use of ASME Code Cases N-514.
In SLRA Section 4.2.4 and in SLRA Tables 4.1.4-1 and 4.1.4-2, the applicant clearly identifies that the P-T limits calculated in accordance with the methods in 10 CFR Part 50, Appendix G are TLAAs for the ONS SLRA. In the staffs March 1999 safety evaluation approving the exemption, the staff granted the exemption in accordance with 10 CFR 50.12 and stated that the calculation of the LTOP system pressure lift setpoint is based on the specified P-T limit curve (it is in reference to the plant P-T limit cooldown curve) at
b) 10 CFR 50.60(b) Exemption Requested May 11, 1999 and Approved on July 29, 1999 (ADAMS ML012050097) Under the Requirements of 10 CFR 50.12 - Exemption Request for use of ASME Code Cases N-514, N-588, and Draft N-626 (currently N-640).
In the Table located on Page 11 of Appendix B of the referenced ONS calculations, the applicant evaluates whether the regulatory exemption of March 29, 1999 for using ASME Code Case N-514 (i.e., for LTOP system pressure lift and system arming temperature setpoints) is a 10 CFR 50.12-granted exemption that remains in effect and is based on a TLAA. The applicant clearly states in the table that the exemption allowing use of Code Case N-514 for calculation of the LTOP system setpoints is based on the results of the P-T limits that are established and calculated in accordance with the methodologies for P-T limit calculations in 10 CFR part 50, Appendix G. The applicant then states that the granted regulatory exemption for Code Case N-514 is not based on the results of a TLAA.
In the Table located on Page 12 of Appendix B of the referenced ONS calculations, the applicant evaluates whether the regulatory exemption of July 29, 1999 for using ASME Code Cases N-514 (a second request for using the code case), N-588, or Draft N-626 (now N-640) are based on TLAAs and remains in effect. On page 12 of the ONS calculation, the applicant quotes the following statement in the safety evaluation regarding a level less than or equal to 110 percent of the pressure limit set in the P-T curve (i.e., for the temperature associated with the arming temperature for the LTOP system in the P-T limit cooldown curve).
In regard to the Exemption of July 29, 1999 (for the request of May 11, 1999), which granted approval for the use of Code Cases N-588 and Draft N-626 (N-640), the staff agrees that the exemptions are not based on a TLAA. The staff also confirmed that, in the safety evaluation for the exemption request of May 11, 1999, the staff indicated that the exemption for use of Code Case N-514 was not necessary because the definition of the enable temperature as RTNDT = 90 ºF is found only in an NRC Branch Technical Position.
Thus, the staff has noted that two entirely different bases in regard to whether an exemption for use of Code Case N-514 exists in the CLBs for ONS Units 1, 2, and 3. The applicant should be prepared to discuss whether the Regulatory Exemption for use of ASME Code Case N-514 is still part of the CLB record (i.e., remains in effect), and if so, whether the exemption is based on a TLAA.
the need for an exemption of Code Case N514: Since the prior definition of the enable temperature as RTNDT = 90 ºF is found only in an NRC Branch Technical Position, an exemption is not required.