Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML21196A076, ML22045A053, ML22111A314, ML22193A254, ML22349A148, ML24255A332, RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1, RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3, RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4, RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3, RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a, RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L, RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a, RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6, RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a, RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b
|
MONTHYEARML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 Project stage: Request ML21158A1932021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses Project stage: Request RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 Project stage: Request ML21196A0762021-07-23023 July 2021 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review Project stage: Other ML21271A5862021-09-21021 September 2021, 22 September 2021, 28 September 2021 SLRA - RAI B2.1.27-1 Project stage: Request ML21270A2492021-09-27027 September 2021 Beyond Nuclear and Sierra Club Hearing Request Project stage: Request RA-21-0281, Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-12021-10-22022 October 2021 Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-1 Project stage: Response to RAI ML21295A7182021-10-22022 October 2021 Applicants Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club Project stage: Request ML21295A7172021-10-22022 October 2021 Notices of Appearance for Tracey M. Leroy, Paul M. Bessette, and Ryan K. Lighty on Behalf of Duke Energy Carolinas, LLC Project stage: Request RA-21-0249, Subsequent License Renewal Application Supplement 12021-10-28028 October 2021 Subsequent License Renewal Application Supplement 1 Project stage: Supplement ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 Project stage: Request ML21313A2322021-11-0404 November 2021 SLRA - Requests for Confirmation of Information - Set 1 Project stage: Request RA-21-0288, Subsequent License Renewal Application Supplement 22021-11-11011 November 2021 Subsequent License Renewal Application Supplement 2 Project stage: Supplement ML21327A2772021-11-23023 November 2021 SLRA - Requests for Additional Information (Set 1) + 2nd Round RAI B2.1.27-1a Project stage: Request ML21335A2692021-12-0101 December 2021 Petitioners Response to Duke Motion to Strike Portion of Petitioners Reply Project stage: Request RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 Project stage: Other RA-21-0316, Subsequent License Renewal Application Supplement 32021-12-15015 December 2021 Subsequent License Renewal Application Supplement 3 Project stage: Supplement RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 Project stage: Request RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a Project stage: Response to RAI ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information Project stage: Response to RAI ML22024A0422022-01-19019 January 2022 Breakout Questions - Trp 141 - Identification of TLAAs Project stage: Request ML22024A0182022-01-19019 January 2022 Breakout Questions - Trp 19 - Steam Generators Project stage: Request ML22024A0492022-01-19019 January 2022 Breakout Questions - Trp 143.9 - Cycle Projections Project stage: Request ML22024A0362022-01-19019 January 2022 Breakout Questions - Trp 60 - Fatigue Monitoring Project stage: Request ML22024A0462022-01-19019 January 2022 Breakout Questions - Trp 143.2 - Non-Class 1 Fatigue Analyses Project stage: Request ML22024A0022022-01-19019 January 2022, 20 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Duke Energy Project stage: Request ML22024A0052022-01-19019 January 2022 Breakout Questions - Scoping and Screening - Reactor Coolant System Project stage: Request ML22024A0122022-01-19019 January 2022 Breakout Questions - Trp 14 - Buried Piping Project stage: Request ML22024A0212022-01-19019 January 2022 Breakout Questions - Trp 26 - Fire Protection Project stage: Request ML22024A0482022-01-19019 January 2022 Breakout Questions - Trp 143.3 - EAF - Min Project stage: Request ML22024A0032022-01-19019 January 2022 Breakout Questions - Fire Protection Scoping and Screening Project stage: Request ML22024A0562022-01-19019 January 2022 Breakout Questions - Trps 142.1 and 149.13 - Fluence Project stage: Request ML22024A0202022-01-19019 January 2022 Breakout Questions - Trp 21 - Closed Treated Water System Project stage: Request ML22024A0402022-01-19019 January 2022 Breakout Questions - Trp 85 - No Aging Effects Project stage: Request ML22024A0162022-01-19019 January 2022 Breakout Questions - Trp 17 - Flow-Accelerated Corrosion Project stage: Request ML22024A0042022-01-19019 January 2022 Breakout Questions - Scoping - Letdown Cooler Project stage: Request ML22024A0322022-01-20020 January 2022 Breakout Questions - Trp 44 - Appendix J Project stage: Request ML22024A0342022-01-20020 January 2022 Breakout Questions - Trp 46 - Structures Monitoring Project stage: Request ML22024A0352022-01-20020 January 2022 Breakout Questions - Trp 47 - Water Control Structures Project stage: Request ML22024A0302022-01-20020 January 2022 Breakout Questions - Trp 42 - ASME XI, Subsection Iwl Project stage: Request ML22024A0082022-01-20020 January 2022 Breakout Questions - Trp 2 - Water Chemistry Project stage: Request ML22024A0412022-01-20020 January 2022 Breakout Questions - Trp 140 - Secondary Shield Wall Tendon Surveillance Project stage: Request ML22024A0432022-01-20020 January 2022 Breakout Questions - Trp 142.03 - PTS Project stage: Request ML22024A0392022-01-20020 January 2022 Breakout Questions - Trp 77 - Corrosion Structural Project stage: Request ML22024A0572022-01-20020 January 2022 Breakout Questions - Trps 149.5 and 23 - Crane and Inspection of Load Handling Project stage: Request ML22024A0332022-01-20020 January 2022 Breakout Questions - Trp 45 - Masonry Walls Project stage: Request ML22024A0552022-01-20020 January 2022 Breakout Questions - Trps 62 and 145 - Tendon Prestress Project stage: Request ML22024A0062022-01-20020 January 2022 Breakout Questions - Structural Scoping and Screening Project stage: Request ML22024A0172022-01-20020 January 2022 Breakout Questions - Trp 18 - Bolting Integrity Project stage: Request ML22024A0092022-01-20020 January 2022 Breakout Questions - Trp 3 - RPV Closure Head Studs Project stage: Request 2021-12-17
[Table View] |
Text
Oconee SLRA: Breakout Questions SLRA Section B2.1.34, Inspection of Water-Control Structures Associated with Nuclear Power Plants AMP TRP: 047 Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request 1
Table 3.5.1 3-1340 Item 3.5.1-060 claims to be consistent with NUREG-2191, and manages Loss of material (spalling, scaling) and cracking due to freeze-thaw. However, the staff could not find the Table 2 items associated with this Table 1 item.
Explain why Table 2 items associated with this Table 1 item are not provided. If determined to be an error or omission, correct SLRA accordingly or provide corresponding Table 2 items.
2 B2.1.34 B-235 SLRA provides enhancements 1, 2, and 3 to include preventive actions to ensure the structural bolting integrity. However, it does not appear that SLRA includes an enhancement of preventative actions for coating material selection discussed in Section 2 of Research Council for Structural Connections.
Clarify whether enhancements for preventive actions need to include coating material selection.
3 B2.1.34 B-236 AMP enhancement 5 is related to sliding surfaces for Element 3. However, enhancement no. 5 also establishes acceptance criteria for sliding surface.
Clarify whether enhancement 5 should be related to both Elements 3 and 6.
4 B2.1.34 Table 3.5.2-23 B-238 3-1455 AMP enhancement 14 seems to include two separate components (piles and sheeting). The staff understands that sheet piles are located at the exterior of the condenser circulating water intake structure, and sheet piles are included as Table 2 AMR line item in Table 3.5.2-
- 1. Clarify where the sheeting is used and how their aging effects are managed.
- 2. Clarify which Tables 1 and 2 line items are associated with the sheeting.
- 23. It is not clear to the staff where the sheeting is used.
5 Table 2.4.4-1 Table 3.5.2-4.
2-303 3-1382 During the on-site audit, the staff observed that the Keowee powerhouse structure was covered with metal siding on the exterior, however, metal siding appears not to be part of the AMR review in Tables 2.4.4-1 and 3.5.2-4.
- 1. Clarify if metal siding is subject to aging management review and will be managed during SPEO for Keowee powerhouse, and if so, how and where is it addressed in the SLRA.
- 2. Confirm if metal siding was included in the corresponding Tables 1 and 2 for other structures.
6 B2.1.24 Table 2.5.2-4 B-234 3-1386 thru 3-1389 For the Penstock, Power Tunnels, Spillway, and Intake structures, the staff noticed that aging effects of bolting, concrete, and steel are managed by both the FERC Inspection programs for the Keowee Hydro Station and the Inspection of Water-Control Structures AMP. The staff needs additional clarification regarding the differences and limitations on scope of inspection of each particular program.
- 1. Explain the rationale and difference in aging management scope of these two AMPs for the Penstock, Power Tunnels, Spillway, and Intake structures, and how it is determined.
- 2. How do inspectors know which components are under their responsibilities to ensure that no inspection for these components will be missed?
7 2.4.2 2-300 SLRA states the breaker vault is supported by the powerhouse operating floor, and its walls and roof are constructed of thick concrete. However, the staff found during the onsite audit that inside of the breaker vault (e.g.
interior concrete, ceiling) and equipment Discuss what actions/procedures will be taken to ensure that aging effects for inside of the breaker vault and its equipment supports will be adequately
supports are not being inspected for aging management.
managed, and how it is or will be addressed in the SLRA.
8 N/A N/A During the onsite audit, the staff noticed water infiltration in the area of the draft tube, and calcium leaching on the powerhouse basement wall. It is not clear if these aging mechanisms/effects were identified in the previous inspections.
Clarify whether these aging mechanisms/effects are identified in the previous ARs (If yes, provide ARs on ePortal) and what corrective actions have been taken.
9 Table 3.5.2-19 3-1436 SLRA Table 3.5.2-19, indicates that a steel piping tunnel from the condenser circulating water discharge pipe system exposed to groundwater/soil environment will be managed for loss of material by the Inspection of Water-Control Structures AMP. The SLRA cited Note F to indicate that this material is not in the GALL-SLR.
Explain how the steel piping tunnel can be properly managed by the Inspection of Water-Control Structures AMP.
10 B.2.1.34 B-234 SLRA states that structural components and commodities monitored under this program include sluice gates.
However, the staff could not locate the associated AMR items, it is not clear whether sluice gates are within the scope of SLR and subject to AMR.
Clarify whether sluice gates are within the scope of SLR and subject to AMR. If yes, explain how their aging effects are adequately managed during the SPEO?