RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX8 January 2024Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEXPacking leak
Offsite Dose Calculation Manual
Operating Basis Earthquake
Exemption Request
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency14 December 2023Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation4 December 2023Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency16 November 2023Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test FrequencySafe Shutdown
Mission time
Offsite Dose Calculation Manual
Coatings
Incorporated by reference
Aging Management
Local Leak Rate Testing
Moisture barrier
Recently irradiated fuel
Scaffolding
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 November 2023RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)14 November 2023Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)Boric Acid
Shutdown Margin
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes1 November 2023Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of ChangesExemption Request
Siren
RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)12 October 2023Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)Subsequent License Renewal
RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan29 September 2023Transmittal of Sixth 10-Year Inservice Testing Interval Program PlanSafe Shutdown
Boric Acid
Stroke time
Incorporated by reference
Missed surveillance
Local Leak Rate Testing
Large early release frequency
Operability Determination
Cold shutdown justification
Power Operated Valves
Scaffolding
Grace period
Exclusive Use
Subsequent actuation
Manual Operator Action
RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)28 September 2023Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes20 September 2023Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of ChangesMet Tower
Exemption Request
RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 17514 September 2023Registration for Use of General License Spent Fuel Cask Number 175
RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 17423 August 2023Registration for Use of General License Spent Fuel Cask Numbers 173 and 174
RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 123 August 2023On-Shift Staffing Analysis (Ossa), Revision 1Safe Shutdown
Severe Accident Management Guideline
Fire Protection Program
RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-0217 August 2023Reply to a Notice of Violation (NOV) 05000270/2023010-02Condition Adverse to Quality
Significance Determination Process
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)18 July 2023Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)Boric Acid
Shutdown Margin
RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 17210 July 2023Registration for Use of General License Spent Fuel Cask Numbers 171 and 172
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)20 June 2023Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)FLEX
License Renewal
Subsequent License Renewal
Environmental Justice
Power Uprate
Measurement Uncertainty Recapture
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory7 June 2023Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations30 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report18 May 2023Refuel 32 (O1R32) Steam Generator Tube Inspection Report
RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 14 May 2023Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1Weld Overlay
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
RA-23-0111, Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies27 April 2023Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report26 April 2023Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 202226 April 2023Duke Energy Annual Radiological Environmental Operating Report - 2022Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.4626 April 2023Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46
RA-23-0099, Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application25 April 2023Subsequent License Renewal Application Second Annual Amendment to the License Renewal ApplicationSubsequent License Renewal
RA-23-0046, Annual Radioactive Effluent Release Report - 202224 April 2023Annual Radioactive Effluent Release Report - 2022Annual Radioactive Effluent Release Report
RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies4 April 2023License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesSafe Shutdown
Mission time
Offsite Dose Calculation Manual
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Finite Element Analysis
FLEX
Aging Management
Seismically rugged
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Severe Accident Management Guideline
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Fuel cladding
Recently irradiated fuel
Scaffolding
RA-23-0036, Biennial Decommissioning Financial Assurance Reports30 March 2023Biennial Decommissioning Financial Assurance Reports
RA-23-0040, Onsite Property Insurance Coverage30 March 2023Onsite Property Insurance Coverage
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums30 March 202310 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)30 March 2023Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
Authorized possession limits
RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities9 March 2023Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement ActivitiesIncorporated by reference
Commercial Grade
RA-23-0052, Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval22 February 2023Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI IntervalWeld Overlay
Moisture barrier
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 2023Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Weld Overlay
Hydrostatic
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2 February 2023Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)23 January 2023Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab5 December 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab
RA-22-0334, Refuel 31 (O3R31) Steam Generator Tube Inspection Report21 November 2022Refuel 31 (O3R31) Steam Generator Tube Inspection Report
RA-22-0329, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 1 Cycle 33 (Revision 0 and Revision 1)11 November 2022Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 1 Cycle 33 (Revision 0 and Revision 1)Boric Acid
Shutdown Margin
RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 27 November 2022Subsequent License Renewal - Appendix E Environmental Report Supplement 2Safe Shutdown
High winds
Offsite Dose Calculation Manual
FLEX
Fukushima Dai-Ichi
Tornado Missile Protection
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Spent Fuel Pool Instrumentation
License Renewal
Subsequent License Renewal
Biofouling
Fire Protection Program
Environmental Justice
Siren
Power Uprate
Measurement Uncertainty Recapture
RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations27 October 2022Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC RenovationsSafe Shutdown
Operator Manual Action
Severe Accident Management Guideline
Exemption Request
Earthquake
Grace period
RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations7 October 2022Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations
RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2 September 2022Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4aAging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
EVT-1
Affidavit