| Site | Start date | Title | Description |
---|
IR 05000250/2024002 | Turkey Point | 1 August 2024 | Integrated Inspection Report 05000250/2024002 and 05000251/2024002 | |
IR 05000250/2023002 | Turkey Point | 14 August 2023 | Integrated Inspection Report 05000250/2023002 and 05000251/2023002 | |
IR 05000382/2021004 | Waterford | 8 February 2022 | Integrated Inspection Report 05000382/2021004 and Exercise of Enforcement Discretion | |
ML21356B721 | Palo Verde | 22 December 2021 | Special Report 3-SR-2021-001-00 | |
IR 05000382/2021003 | Waterford | 11 November 2021 | Electrical Station, Unit 3 - Integrated Inspection Report 05000382/2021003 | |
IR 05000382/2021002 | Waterford | 5 August 2021 | Integrated Inspection Report 05000382/2021002 | |
W3F1-2021-0001, Special Report SR-21-001-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3) Re Reactor Vessel Level Monitoring System (Rvlms) Channel Inoperable for Greater than 30 Days | Waterford | 8 January 2021 | Special Report SR-21-001-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3) Re Reactor Vessel Level Monitoring System (Rvlms) Channel Inoperable for Greater than 30 Days | |
ML20135H301 | Palo Verde | 14 May 2020 | Final ASP Analysis - Palo Verde 2 (LER 529-93-001) | |
ML20170A457 | Fort Calhoun 07100256 | 30 April 2020 | Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-Figures, Section-07 | |
L-2019-111, Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts | Saint Lucie | 30 September 2019 | Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts | |