PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake
ML20141A048 | |
Person / Time | |
---|---|
Site: | Rancho Seco, 05000000, Vallecitos, Aerotest, Berkeley Research Reactor |
Issue date: | 03/31/1986 |
From: | Cillis M, Yuhas G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | |
References | |
PNO-V-86-014, PNO-V-86-14, NUDOCS 8604040374 | |
Download: ML20141A048 (1) | |
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-V-93-015, on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I1993-08-11011 August 1993
[Table view]PNO-V-93-015:on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant1989-09-12012 September 1989 PNO-V-89-056:on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant ML20247N0071989-09-11011 September 1989 PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom PNO-V-89-053, on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 8909071989-09-0505 September 1989 PNO-V-89-053:on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 PNO-V-89-050, on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement1989-08-23023 August 1989 PNO-V-89-050:on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage1989-08-0808 August 1989 PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage PNO-V-89-044, on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale1989-07-21021 July 1989 PNO-V-89-044:on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred1989-07-0505 July 1989 PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul1989-07-0303 July 1989 PNO-V-89-039:on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul PNO-V-89-036, on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn1989-06-21021 June 1989 PNO-V-89-036:on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn PNO-V-89-035, on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval1989-06-20020 June 1989 PNO-V-89-035:on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval PNO-V-89-034, on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 19891989-06-16016 June 1989 PNO-V-89-034:on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 1989 PNO-V-89-033C, on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress1989-06-12012 June 1989 PNO-V-89-033C:on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress PNO-V-89-033B, on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel1989-06-0808 June 1989 PNO-V-89-033B:on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel PNO-V-89-033A, on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration1989-06-0707 June 1989 PNO-V-89-033A:on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration PNO-V-89-033, on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented1989-06-0707 June 1989 PNO-V-89-033:on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented PNO-V-89-030, on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors1989-05-19019 May 1989 PNO-V-89-030:on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred1989-04-0303 April 1989 PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants1989-03-23023 March 1989 PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants ML20196B6881988-11-30030 November 1988 PNS-V-88-006:on 881126,licensee Received Telcon Alleging That Nonlicensed Equipment Operator Observed Using Illegal Drugs.Individual Submitted to Urinalysis Test & Showed Positive for Marijuana.Individual Terminated on 881130 PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process1988-11-0909 November 1988 PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process PNO-V-88-059, on 881024,licensee Determined That Reactor Coolant Unidentified Leakage Was 1.06 Gpm.Leakage Could Not Be Reduced.Reactor Was Shut Down.No Entry Inside Shield Permitted.Repair Method to Be Determined Upon Next Entry1988-10-25025 October 1988 PNO-V-88-059:on 881024,licensee Determined That Reactor Coolant Unidentified Leakage Was 1.06 Gpm.Leakage Could Not Be Reduced.Reactor Was Shut Down.No Entry Inside Shield Permitted.Repair Method to Be Determined Upon Next Entry PNO-V-88-058, on 881014,reactor Tripped from Phase Imbalance on 6.9 Kv Power to Four Operating Reactor Coolant Pumps.Grid Disturbance,Which Affected Startup & Auxiliary Transformer Power Sources on One Offsite Power Line,Possible Initiator1988-10-14014 October 1988 PNO-V-88-058:on 881014,reactor Tripped from Phase Imbalance on 6.9 Kv Power to Four Operating Reactor Coolant Pumps.Grid Disturbance,Which Affected Startup & Auxiliary Transformer Power Sources on One Offsite Power Line,Possible Initiator PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities1988-06-13013 June 1988 PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities PNO-V-88-036, on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed1988-06-0808 June 1988 PNO-V-88-036:on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends1988-05-0909 May 1988 PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends PNO-V-88-030, on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak1988-05-0404 May 1988 PNO-V-88-030:on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak PNO-V-88-029, on 880429,SMUD Released Info Re Potential Agreement W/Duke Power Co (DPC) Under Which DPC Employee Would Become Chief Executive Officer,Nuclear,Reporting to New Rancho Seco Mgt Committee.Meeting Planned on 8805091988-04-29029 April 1988 PNO-V-88-029:on 880429,SMUD Released Info Re Potential Agreement W/Duke Power Co (DPC) Under Which DPC Employee Would Become Chief Executive Officer,Nuclear,Reporting to New Rancho Seco Mgt Committee.Meeting Planned on 880509 PNO-V-88-024, util Received Final Authorization from NRR to Restart Facility on 880330.Enhanced Operational Readiness Insp Team & Resident Insp Staff Observing Reactor Startup Which Will Require 6-10 H to Complete1988-03-30030 March 1988 PNO-V-88-024:util Received Final Authorization from NRR to Restart Facility on 880330.Enhanced Operational Readiness Insp Team & Resident Insp Staff Observing Reactor Startup Which Will Require 6-10 H to Complete PNO-V-88-023, on 880323,undervoltage Attachment of CRD Breaker Failed to Operate.Interference of Undervoltage Attachment Trip Lever W/Exterior Label Plate,Noted. Investigation Continuing1988-03-24024 March 1988 PNO-V-88-023:on 880323,undervoltage Attachment of CRD Breaker Failed to Operate.Interference of Undervoltage Attachment Trip Lever W/Exterior Label Plate,Noted. Investigation Continuing PNO-V-88-021, on 880315,leak of About 100 Gpm Occurred from Downstream Pressure Relief Valve While Opening Upstream Isolation Valve.Approx 650 Gallons of Water Released.No Radioactivity Released.Investigation Underway1988-03-16016 March 1988 PNO-V-88-021:on 880315,leak of About 100 Gpm Occurred from Downstream Pressure Relief Valve While Opening Upstream Isolation Valve.Approx 650 Gallons of Water Released.No Radioactivity Released.Investigation Underway PNO-V-88-017, on 880301,util Certified That All Prerequisites for non-nuclear Heatup of Plant to Normal Operating Test Temp & Pressure Completed.Reactor Criticality Scheduled for 8803201988-03-0101 March 1988 PNO-V-88-017:on 880301,util Certified That All Prerequisites for non-nuclear Heatup of Plant to Normal Operating Test Temp & Pressure Completed.Reactor Criticality Scheduled for 880320 ML20147H0841988-03-0101 March 1988 PNS-V-88-001:on 880229,plant Notified of Bomb Threat. Licensee Conducted Routine Search,Found Three Suspicious Packages.Packages Examined & Found to Be Innocuous PNO-V-88-016, on 880224,RK Byrne Recommended Closure of Plant to Board of Directors at 880224 Meeting.Recommendation Will Be Considered by Board for Action on 880303.Licensee Continuing Loss of Offsite Power Testing1988-02-25025 February 1988 PNO-V-88-016:on 880224,RK Byrne Recommended Closure of Plant to Board of Directors at 880224 Meeting.Recommendation Will Be Considered by Board for Action on 880303.Licensee Continuing Loss of Offsite Power Testing PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom PNO-V-88-011, on 880208,fire Occurred in Annunciator Control Cabinet B During Cold Shutdown.Cause of Fire Not Yet Determined.Cabinets a & B Electronically Isolated.All Testing Temporarily Suspended.No Loss of DHR Occurred1988-02-0909 February 1988 PNO-V-88-011:on 880208,fire Occurred in Annunciator Control Cabinet B During Cold Shutdown.Cause of Fire Not Yet Determined.Cabinets a & B Electronically Isolated.All Testing Temporarily Suspended.No Loss of DHR Occurred PNO-V-88-010, on 880207,licensee Inadvertently Drained Approx 1,100 Gallons of Slightly Contaminated Borated Water from Borated Water Storage Tank During Testing.Testing Suspended Until Investigation & Further Corrective Action Completed1988-02-0808 February 1988 PNO-V-88-010:on 880207,licensee Inadvertently Drained Approx 1,100 Gallons of Slightly Contaminated Borated Water from Borated Water Storage Tank During Testing.Testing Suspended Until Investigation & Further Corrective Action Completed PNO-V-88-008, on 880203,unplanned Start of Bruce Gm Diesel Generator a Occurred.Caused by Failure to Position Generator Control Switch While Performing Loss of Offsite Power Test. Further Startup Testing Suspended1988-02-0404 February 1988 PNO-V-88-008:on 880203,unplanned Start of Bruce Gm Diesel Generator a Occurred.Caused by Failure to Position Generator Control Switch While Performing Loss of Offsite Power Test. Further Startup Testing Suspended PNO-V-88-009, on 880204,individual May Have Received 458 Rem Exposure to Back of Left Knee from 43 Uci Co-60.Caused by Individual Welding on Dhr.Licensee Investigating Matter & Will Inform Region V of Results1988-02-0404 February 1988 PNO-V-88-009:on 880204,individual May Have Received 458 Rem Exposure to Back of Left Knee from 43 Uci Co-60.Caused by Individual Welding on Dhr.Licensee Investigating Matter & Will Inform Region V of Results PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named1988-02-0202 February 1988 PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure1988-01-0404 January 1988 PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure PNO-V-87-084, on 871216,licensee Induced Unexpected Load Transient on One safety-related Diesel Generator During Loss of Offsite Power Test.Dhr & Control Units Unaffected.Cause Being Investigated1987-12-16016 December 1987 PNO-V-87-084:on 871216,licensee Induced Unexpected Load Transient on One safety-related Diesel Generator During Loss of Offsite Power Test.Dhr & Control Units Unaffected.Cause Being Investigated PNO-V-87-080, on 871204,inspectors Identified Worker Lying Down on Scaffolding Erected at Grade Level in Reactor Bldg. Individual Waiting for Addl Staging of Equipment.Security Badge Suspended & Investigation Initiated1987-12-0808 December 1987 PNO-V-87-080:on 871204,inspectors Identified Worker Lying Down on Scaffolding Erected at Grade Level in Reactor Bldg. Individual Waiting for Addl Staging of Equipment.Security Badge Suspended & Investigation Initiated PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted1987-11-24024 November 1987 PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted PNO-V-87-075, on 871111,control Room/Technical Support Ctr Essential HVAC Sys Train B Failed to Start During Planned Testing.Licensee Believes Tampering Occurred to Cause Miswiring.Plans for Addressing Tampering Being Formulated1987-11-13013 November 1987 PNO-V-87-075:on 871111,control Room/Technical Support Ctr Essential HVAC Sys Train B Failed to Start During Planned Testing.Licensee Believes Tampering Occurred to Cause Miswiring.Plans for Addressing Tampering Being Formulated ML20236L0341987-11-0505 November 1987 PNS-V-87-004B:on 870616,Sacramento Narcotics Task Force Arrested Six Persons Involved in Possession,Sale & Use of Cocaine.Util Clerk Indicated Transactions Conducted in Site Parking Lot or Offsite,Not at Facility PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems1987-11-0303 November 1987 PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems 1993-08-11 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000228/19992011999-09-0202 September 1999
[Table view]Insp Rept 50-228/99-201 on 990816-19.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Was on-site Review of Selected Aspects of Licensee Class II non-power Reactor Operation IR 05000312/19990031999-08-31031 August 1999 Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls IR 05000070/19992011999-07-0101 July 1999 Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program IR 05000312/19990021999-03-19019 March 1999 Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint IR 05000070/19980011999-01-0707 January 1999 Insp Rept 50-070/98-01 on 991116-19.No Violations Noted. Major Areas Inspected:Review of Status of Three Shutdown Reactor Facilities,Getr,Vbwr & Evesr.Safstor Condition of Evesr,Getr & Vbwr Evaluated During Tour of Facilities ML20196F8801998-12-0202 December 1998 Notice of Violation from Insp on 981102-05.Violation Noted: Several Discrepancies Were Noted on Shipping Papers as Listed IR 05000228/19982011998-12-0202 December 1998 Insp Rept 50-228/98-201 on 981102-05.Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensees Class II non-power Reactor Operation Including Organization & Staffing & Review & Audit Functions IR 05000312/19980031998-08-0707 August 1998 Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs ML20248K6301998-06-0303 June 1998 Notice of Violation from Insp on 980519-21.Violation Noted:Inspector Determined That Licensee Failed to Review & Consider All Info Obtained During Background Investigation IR 05000312/19980021998-06-0303 June 1998 Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program ML20217C1491998-03-18018 March 1998 Insp Repts 50-070/98-201,50-073/98-201 & 50-183/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Review of Safeguards Programs,Security Program,Procedures,Radiation Protection & Matl Control ML20217C1281998-03-18018 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: Licensee Failed to Comply with Requirements of Section 12 of Physical Security Plan ML20202C4981998-02-0505 February 1998 Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics ML20202C4771998-02-0505 February 1998 Notice of Violation from Insp on 980105-08.Violation Noted: on 971222,shipment of Scrap Metal,In Form of Auxiliary Boiler,Was Released from Rancho Seco Site W/O Having Been Surveyed IR 05000018/19970011998-01-0909 January 1998 Insp Repts 50-018/97-01,50-070/97-01 & 50-183/97-01 on 971204.No Violations Noted.Major Areas Inspected:Review of Status of Getr,Vbwr & ESADA Vallecitos Experimental Superheat Reactor IR 05000312/19970041997-10-21021 October 1997 Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review ML20198K5451997-10-21021 October 1997 Notice of Violation from Insp on 970922-25.Violation Noted:On 970806,thermocouple for Spent Fuel Pool Temp Indicator Was Found to Be out-of-tolerance During Annual Calibration IR 05000228/19972011997-07-11011 July 1997 Insp Rept 50-228/97-201 on 970603-04.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support,Implementation of Emergency Plan & Security & Safeguards ML20149K0641997-07-0707 July 1997 NRC Operator Licensing Initial Exam Rept 50-228/OL-97-01 on 970602 & 03.Exam Results:Written & Operating Exams Administered to One Candidate for Senior Operator License. Candidate Passed Exams IR 05000312/19970031997-06-17017 June 1997 Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System IR 05000312/19970021997-04-25025 April 1997 Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance IR 05000312/19970011997-03-21021 March 1997 Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities IR 05000312/19960031996-09-27027 September 1996 Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations IR 05000312/19930061993-09-0202 September 1993 Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program IR 05000312/19930041993-08-11011 August 1993 Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale PNO-V-93-015, on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I1993-08-11011 August 1993 PNO-V-93-015:on 930811,4.7 Magnitude Earthquake Occurred.No Damage Reported at Listed Facilities.Aerotest Reactor Was Operating & Earthquake Scram Not Triggered.Concludes That Since No Motion Detected,Mmi Probably Less than I IR 05000312/19920071992-12-10010 December 1992 Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items ML20127P1171992-11-23023 November 1992 Exam Rept 50-228/OL-92-01 on 921102-04.Exam Results:All Seven SRO Passed Written & Operating Portion of Exam.Several Operators Demonstrated Weaknesses,Per Standards Set by Facility Requalification Program IR 05000312/19900141990-11-14014 November 1990 Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations IR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant1989-09-12012 September 1989 PNO-V-89-056:on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20247N0071989-09-11011 September 1989 PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom PNO-V-89-053, on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 8909071989-09-0505 September 1989 PNO-V-89-053:on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 PNO-V-89-050, on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement1989-08-23023 August 1989 PNO-V-89-050:on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement ML20246Q1281989-08-15015 August 1989 Exam Rept 50-228/OL-89-01 on 890726-27.Exam Results:One Senior Reactor Operator Candidate Passed Both Written & Operating Exams & One Senior Reactor Operator Candidate Failed Written & Passed Operating Exam ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage1989-08-0808 August 1989 PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage PNO-V-89-044, on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale1989-07-21021 July 1989 PNO-V-89-044:on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred1989-07-0505 July 1989 PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul1989-07-0303 July 1989 PNO-V-89-039:on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul PNO-V-89-036, on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn1989-06-21021 June 1989 PNO-V-89-036:on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn 1999-09-02 |
- ,y D
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-V-86-14 Date: 03/31/86 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public intercst signfficance. The information presented is as initially received without verification cr cvaluation and is basically all that is known by Region V staff on this 11 ate.
FACILITY: Aerotest Operations, Inc. (DN 50-228) Emergency Classification UC Berkeley (DN 50-224) Notification of Unusual Event GE Vallecitos (NTR) (DN 50-70) Alert Rancho Seco (DN 50-312) Site Area Emergency General Emergency XX Not Applicable
SUBJECT:
SEISMIC EVENT An c:rthquake occurred at approximately 10 miles east of Fremont, California on March 31, 1986, at 3:56 a.m. (PST). The magnitude was reported as 5.3 on the Richter Scale. As of 9:55 c m (PST), 180 after shocks of a minor nature were reported.
Tha cbove identified three research reactor facilities were contacted by the Region V staff and rcp2rted that no damage was observed at their facilities. The research reactors are located within 10, 20 and 30 miles, respectively, of the epicenter. Region V contacted Rancho Seco, thn n arest power reactor facility, which is located approximately 70 miles northeast of the cpic nter, and determined they did not feel the effects of the earthquake.
This information is current as of 11:00 a.m. (PST) on March 31, 1986.
CONTACT: M. Cillis, 463-3747; G. Yuhas, 463-3748 DISTRIBUTION H St. MNBB Phillips E/W Willste Air Rights Mail:
Chairman Pa111dino EDO NRR IE .NMSS SP ADM:DMB V Comm..Zech PA OIA RES DOT:Trans Comm. Bernthal MPA AEOD Only Comm. Roberts ELD Comm. Asselstine Regions:
CA (Reactor Licensees) REGION V: FORM 211 PDR Resident Inspector _ (Revised 3/14/83) e60404o374 860331 PDR v- -014 4'