NRC 2018-0026, Submittal of Technical Requirements Manual Change Summary

From kanterella
Jump to navigation Jump to search
Submittal of Technical Requirements Manual Change Summary
ML18122A115
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/02/2018
From: Schultz E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2018-0026
Download: ML18122A115 (2)


Text

May 2, 2018 NRC 2018-0026 10 CFR 50.71(e)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM).

The enclosure contains the TRM change summary for the period January 1, 2016, through March 31, 2018. NextEra previously submitted the TRM change summary for January 1, 2015, through December 31, 2015, on August 17, 2016 (ML16230A369).

This letter contains no new commitments and no revisions to existing commitments.

If you have any questions or require additional information, please contact me at (920) 755-7854.

Sincerely, NextEra Energy Point Beach, LLC J~v~ ~, D~.-~

r-fs.\-vMA~ p, ") cl.-\{'1-tv tfl...

Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE

SUMMARY

FOR JANUARY 1, 2016- MARCH 31, 2018 Affected Affected Section Date of Change Page(s) Summary 1.0 August 2017 1.0-2 Updated references.

3.4.4 July 2017 3.4.4-5 Added that this program is part of the lnservice Testing Program.

3.7.2 October 2016 All Rewrote to clarify alignment with TS 3.0.2 and TS 3.0.6.

3.7.6 February 2018 3.7.6-3, 7 Changed Functionality test of crossover steam dump valves from 31 days to 6 months.

4.1 March 2017 All Updated to reflect changes made to ODCM.

4.4 March 2017 All Updated to reflect changes made to ODCM.

4.8 January 2016 All Updated references and definition of Plugging Criteria.

4.12 September 2017 4.12-1, 2, Updated references.

3, 7 4.13 August 2017 4.13-2 Updated references.

4.15 July 2017 4.15-2 Added that this program is part of the lnservice Testing Program.

4.16 July 2017 4.16-1 Added that this program is part of the lnservice Testing Program.

4.17 January 2017 4.17-1 Updated the applicable code.

4.18 June 2016 4.18-1 Updated references.

Page 1 of 1

May 2, 2018 NRC 2018-0026 10 CFR 50.71(e)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM).

The enclosure contains the TRM change summary for the period January 1, 2016, through March 31, 2018. NextEra previously submitted the TRM change summary for January 1, 2015, through December 31, 2015, on August 17, 2016 (ML16230A369).

This letter contains no new commitments and no revisions to existing commitments.

If you have any questions or require additional information, please contact me at (920) 755-7854.

Sincerely, NextEra Energy Point Beach, LLC J~v~ ~, D~.-~

r-fs.\-vMA~ p, ") cl.-\{'1-tv tfl...

Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE

SUMMARY

FOR JANUARY 1, 2016- MARCH 31, 2018 Affected Affected Section Date of Change Page(s) Summary 1.0 August 2017 1.0-2 Updated references.

3.4.4 July 2017 3.4.4-5 Added that this program is part of the lnservice Testing Program.

3.7.2 October 2016 All Rewrote to clarify alignment with TS 3.0.2 and TS 3.0.6.

3.7.6 February 2018 3.7.6-3, 7 Changed Functionality test of crossover steam dump valves from 31 days to 6 months.

4.1 March 2017 All Updated to reflect changes made to ODCM.

4.4 March 2017 All Updated to reflect changes made to ODCM.

4.8 January 2016 All Updated references and definition of Plugging Criteria.

4.12 September 2017 4.12-1, 2, Updated references.

3, 7 4.13 August 2017 4.13-2 Updated references.

4.15 July 2017 4.15-2 Added that this program is part of the lnservice Testing Program.

4.16 July 2017 4.16-1 Added that this program is part of the lnservice Testing Program.

4.17 January 2017 4.17-1 Updated the applicable code.

4.18 June 2016 4.18-1 Updated references.

Page 1 of 1