MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18
[Table view] Category:Manual
MONTHYEARNRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2020-0009, Appendix 2 - Offsite Dose Calculation Manual, Revision 212019-01-30030 January 2019 Appendix 2 - Offsite Dose Calculation Manual, Revision 21 NRC 2018-0026, Submittal of Technical Requirements Manual Change Summary2018-05-0202 May 2018 Submittal of Technical Requirements Manual Change Summary NRC 2018-0016, Update of Final Safety Analysis Report, Appendix T, Technical Requirements Manual2018-05-0202 May 2018 Update of Final Safety Analysis Report, Appendix T, Technical Requirements Manual NRC 2012-0044, Technical Requirements Manual Change Summary2012-06-12012 June 2012 Technical Requirements Manual Change Summary NRC 2011-0106, License Renewal Commitment Reactor Vessel Lnternals Program Submittal2011-12-19019 December 2011 License Renewal Commitment Reactor Vessel Lnternals Program Submittal ML14342A1502009-12-0909 December 2009 Nextera Energy Point Beach, LLC Point Beach Nuclear Plant, Units 1 and 2, Revision 53 of Emergency Plan ML0918106912009-06-25025 June 2009 Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80 NRC 2008-0014, Pressure and Temperature Limits Report2008-02-27027 February 2008 Pressure and Temperature Limits Report ML0612902402005-09-28028 September 2005 EM Environmental Manual ML0612902322005-08-29029 August 2005 Enclosure 2, Offsite Dose Calculation Manual (ODCM) Revision 17 Issued August 2005 ML0626504102005-08-10010 August 2005 Np 1.7.5, Fitness for Duty Policy and Procedure ML0626504092005-08-10010 August 2005 Np 1.7.16 Collection Site Protocol ML0626802172004-12-22022 December 2004 Np 1.7.1, Security Expectations ML0515804872004-10-29029 October 2004 Offsite Dose Calculation Manual, Revision 16 ML0626802112004-10-13013 October 2004 Np 1.7.3, Site Specific Requirements for Access to and Termination from Point Beach Nuclear Plant ML0626802002004-06-23023 June 2004 Np 1.7.18, Unscheduled Work Period (Uwp) Call-In ML0626801742004-03-24024 March 2004 Np 1.7.19, For-Cause Testing (Reasonable Suspicion) ML0306304342003-02-0606 February 2003 Excerpt from Manual Chapter 0305 on Action Matrix Guidance for Old Design Issues ML0626503752002-11-22022 November 2002 Np 1.7.17 Fitness for Duty - Continual Behavior Observation Program ML0212802482002-04-30030 April 2002 Part 1 of 2, Point Beach Nuclear Plant, Units 1 & 2 - Annual Monitoring Report for 2001 ML0307307472002-03-0606 March 2002 Plant Procedure Np 7.2.3, Engineering Change Requests, Revision 6 2019-10-18
[Table view] |
Text
May 2, 2018 NRC 2018-0026 10 CFR 50.71(e)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM).
The enclosure contains the TRM change summary for the period January 1, 2016, through March 31, 2018. NextEra previously submitted the TRM change summary for January 1, 2015, through December 31, 2015, on August 17, 2016 (ML16230A369).
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact me at (920) 755-7854.
Sincerely, NextEra Energy Point Beach, LLC J~v~ ~, D~.-~
r-fs.\-vMA~ p, ") cl.-\{'1-tv tfl...
Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241
ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE
SUMMARY
FOR JANUARY 1, 2016- MARCH 31, 2018 Affected Affected Section Date of Change Page(s) Summary 1.0 August 2017 1.0-2 Updated references.
3.4.4 July 2017 3.4.4-5 Added that this program is part of the lnservice Testing Program.
3.7.2 October 2016 All Rewrote to clarify alignment with TS 3.0.2 and TS 3.0.6.
3.7.6 February 2018 3.7.6-3, 7 Changed Functionality test of crossover steam dump valves from 31 days to 6 months.
4.1 March 2017 All Updated to reflect changes made to ODCM.
4.4 March 2017 All Updated to reflect changes made to ODCM.
4.8 January 2016 All Updated references and definition of Plugging Criteria.
4.12 September 2017 4.12-1, 2, Updated references.
3, 7 4.13 August 2017 4.13-2 Updated references.
4.15 July 2017 4.15-2 Added that this program is part of the lnservice Testing Program.
4.16 July 2017 4.16-1 Added that this program is part of the lnservice Testing Program.
4.17 January 2017 4.17-1 Updated the applicable code.
4.18 June 2016 4.18-1 Updated references.
Page 1 of 1
May 2, 2018 NRC 2018-0026 10 CFR 50.71(e)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary In accordance with 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM).
The enclosure contains the TRM change summary for the period January 1, 2016, through March 31, 2018. NextEra previously submitted the TRM change summary for January 1, 2015, through December 31, 2015, on August 17, 2016 (ML16230A369).
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact me at (920) 755-7854.
Sincerely, NextEra Energy Point Beach, LLC J~v~ ~, D~.-~
r-fs.\-vMA~ p, ") cl.-\{'1-tv tfl...
Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241
ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE
SUMMARY
FOR JANUARY 1, 2016- MARCH 31, 2018 Affected Affected Section Date of Change Page(s) Summary 1.0 August 2017 1.0-2 Updated references.
3.4.4 July 2017 3.4.4-5 Added that this program is part of the lnservice Testing Program.
3.7.2 October 2016 All Rewrote to clarify alignment with TS 3.0.2 and TS 3.0.6.
3.7.6 February 2018 3.7.6-3, 7 Changed Functionality test of crossover steam dump valves from 31 days to 6 months.
4.1 March 2017 All Updated to reflect changes made to ODCM.
4.4 March 2017 All Updated to reflect changes made to ODCM.
4.8 January 2016 All Updated references and definition of Plugging Criteria.
4.12 September 2017 4.12-1, 2, Updated references.
3, 7 4.13 August 2017 4.13-2 Updated references.
4.15 July 2017 4.15-2 Added that this program is part of the lnservice Testing Program.
4.16 July 2017 4.16-1 Added that this program is part of the lnservice Testing Program.
4.17 January 2017 4.17-1 Updated the applicable code.
4.18 June 2016 4.18-1 Updated references.
Page 1 of 1