Text

Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0079 10 CFR 26.71(d)

August 27, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DOCKETS 50-266 AND 50-301 FITNESS-FOR-DUTY (FFD) PROGRAM In accordance with 10 CFR 26.71(d), enclosed is Point Beach Nuclear Plant Fitness-for-Duty performance data for the six-month period ending June 30, 2003.

Site FAF/kmd Enclosure cc: Regional Administrator, Region IlIl, USNRC Project Manager, Point Beach Nuclear Plant, NRR, USNRC NRC Resident Inspector - Point Beach Nuclear Plant A02,1 U", -

6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

ENCLOSURE NUCLEAR MANAGEMENT COMPANY, LLC DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT August 27,2003 FITNESS FOR DUTY PROGRAM 6-MONTH REPORT FOR PERIOD ENDING JUNE 30, 2003 2 pages follow

Fitness for Dut& Program Performance Data Personnel Sublect to 10 CFR 26 Nuclear Management Company, LLC June 30, 2003 Company 6 Months Ending Point Beach Nuclear Plant, Units 1 and 2 Location Don Popp 920/755-7756 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) to Appendix A to 10 CFR 26 Marijuana / Amphetamines / l Cocaine Phencyclidine Opiates Alcohol (% BAC)

Testing Results Licensee Employees Contractor Personnel Average Number with 812 365 Unescorted Access Categories Tested Positive Tested Positive Pre-Access 70 0 93 1 For Post accident 2 0 0 0 Cause  : _

Observed 3 1 2 1 behavior Random 275 0 38 0 Follow-up 38 1 36 0 Other 0 0 0 0 Total 388 2 169 2

NRC 2003-0079 N' Page 2 of 2 ,

Breakdown of Confirmed Positive Tests for Specific Substances p Marijuana Cocaine Opiates

_____ ____ i Methamphetamines

___________ __ Phencyclidine Phencyclidine ~R Alcohol e fu sal toTest 1 j 22 331 l 4 55 Licensee 0 0 0 0 0 2 0 Employees _ _

Contractors 0 0 0 0 0 2 0 Total I 0 0 I 0 0 4 0 _ _ _

On January 23, 2003, one licensee employee tested positive for alcohol on a For-Cause drug/alcohol test. The licensee employee was denied access. The employee was provided the opportunity to appeal the denial through the We-energies appeal process. There was no appeal.

On January 29, 2003, one contractor employee tested positive for alcohol on a Pre-Access drug/alcohol test. The contractor employee was denied access. The employee was provided the opportunity to appeal the denial through the We-energies appeal process. There was no appeal.

On June 11, 2003, one contractor employee tested positive for alcohol on a For-Cause drug/alcohol test. The contractor employee was denied access. The employee was provided with the opportunity to appeal the denial through the We-energies appeal process. There was no appeal.

On June 23, 2003, one licensee employee tested positive for alcohol on a Follow-Up drug/alcohol test. The licensee employee was denied access. The employee was provided with the opportunity to appeal the denial through the We-energies appeal process. There was no appeal.

Reportable Events On June 11, 2003, at 1343 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.110115e-4 months <br /> CDT, a 24-hour reportable FFD event report (#EN39920) was made in accordance with 10 CFR 26.73.a(2)(i). An update to that report was made at 1929 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.339845e-4 months <br /> CDT when additional investigations determined the event to also be reportable in accordance with 10 CFR 26.73.a(2)(iv).