L M. Stinson (Mike) Southern Nuclear Vice President Operating Company. Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 SOGUTERNA May 11, 2004 COMPAN Energy to Serve Your World' Docket Nos.: 50-348 NL-04-0801 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the April 2004 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.

Last month's Monthly Operating Reports (MOR) referenced pending LER 2004-001-00 (Unit 2) on page El-2. The referenced LER was submitted to the NRC on April 29, 2004 for Unit 1,and should have been designated as Unit I in the MOR.

If you have'any questions, please advise.

Sincerely, L. M. Stinson LMS/LPH/sdl

Enclosures:

El - FNP Unit I Monthly Operating Report E2 - FNP Unit 2 Monthly Operating Report cc: Southem Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. D. E. Grissette, General Manager - Plant Farley RTYPE: CFA04.054 & G9.03 - Xref: A.2. 1; LC# 14032 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. S. E. Peters, NRR Project Manager- Farley Mr. C. A. Patterson, Senior Resident Inspector - Farley

Zoo -,( I--t

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit I DATE: May 5,2004 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: APRIL 2004
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 830 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 719.0 2,878.4 191,778.1
5. Hours Generator On-line: 719.0 2,861.7 189,381.9
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 611,607.0 2,436,661.0 150,614,037.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date I Tag No. I Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-l

UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: May 5, 2004 COMPLETED BY: W. L. Marlar REPORTING PERIOD: APRIL 2004 TELEPHONE: (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YMMDD) S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(1) REASON: (2) METHOD:

A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 0115 on April 24, 2004 the unit was ramped down to approximately 93% for governor Valve Testing.

Testing was completed and the unit was returned to 100% power at 0549 on April 24, 2004.

E1-2

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: May 5,2004 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 8144554 OPERATING STATUS

1. Reporting Period: APRIL 2004
2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 839 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 383.8 2,112.7 174,031.5
5. Hours Generator On-line: 340.5 2,068.6 171,985.4
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 251,091.0 1,712,839.0 138,137,721.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: May 5, 2004 COMPLETED BY: W. L. Marlar REPORTING PERIOD: APRIL 2004 TELEPHONE: (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD) S: Scheduled (Hours) (1) (2) Comments 1 040313 S 353.7 C 4 The sixteenth refueling outage was completed on April 15, 2004.

2 040416 F 24.8 A 5 Turbine trip only. Reactor remained critical.

(I) REASON: (2) METHOD:

A - Equipment Failure (Explain) I -Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

  • - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 1105 on April 11, 2004, during low power physics testing an automatic reactor trip occurred due to reactor protection system problems. After replacement of two reactor protection system circuit cards, while re-establishing conditions to continue low power physics testing, another automatic reactor trip occurred at 0347 on April 12, 2004. Additional testing identified a different reactor protection system circuit card failure as the actual cause of both trips. This card was replaced, low power physics testing was completed and the unit continued with startup (LER pending). At 1843 on April 15, 2004 the U2RFI6 outage was completed and the unit was synchronized to the grid. This refueling outage completion date includes an extension of approximately six days primarily due to additional work scope associated with Service Water piping repair. At 1808 on April 16, 2004, with the unit at approximately 31 % power, the main turbine was manually tripped due to turbine control problems. The reactor remained critical. Repairs were completed, the unit was connected to the grid at 1856 on April 17, 2004 and returned to 100% power at 0417 on April 20, 2004.

E2-2