August 2003 Monthly Operating Report for Joseph M Farley
ML032580399
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/10/2003
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-1907
Download: ML032580399 (5)


Text

J. Bernie Beasley, Jr., RE Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.711 0 Fax 205.992.0341 September 10, 2003 SOUTHERN COMPANY Energy to Serve Your World' NL-03-1907 Docket Nos.:

50-348 50-364 U. S. Nuclear Regulatory Commission ATITN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the August 2003 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, JBB/LPH/sdl

Enclosures:

E l - FNP Unit 1 Monthly Operating Report E2 - FNP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. D. E. Grissette, General Manager - Plant Farley Document Services RTYPE: CFA04.054 & G9.03 - Xref: A.2.1; LC# 13840 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Farley Mr. T. P. Johnson, Senior Resident Inspector - Farley

5e to-A

OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-348 J. M. Farley - Unit I September 5, 2003 W. L. Marlar (334) 8144554 OPERATING STATUS

1. Reporting Period:

A

2.

Design Electrical Rating (Net MWe):

3.

Maximum Dependable Capacity (Net MWe):

LUGUST 2003 854 830 This Month Year to Date Cumulative

4.

Number Of Hours Reactor Was Critical:

5. Hours Generator On-line:
6.

Unit Reserve Shutdown Hours:

7. Net Electrical Energy Generated (MWH):

744.0 744.0 5,045.8 4,980.9 0.0 185,970.7 183,591.2 0.0 0.0

-620,052.0 4,109,849.0 145,684,587.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAJETY VALVES Date I Tag No.

I Event Description I

I There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I I

El-l

UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

REPORTING PERIOD: AUGUST 2003 TELEPHONE:

50-348 J. M. Farley - Unit 1 September 5, 2003 W. L. Marlar (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(I) REASON:

(2) METHOD:

A -Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 Manual Trip/Scram C - Refueling 3 -Automatic Trip/Scram D -Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 -Other (Explain)

F -Administrative G -Operational Error (Explain)

H -Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

E1-2

OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-364 J. M. Farley - Unit 2 September 5, 2003 W. L. Marlar (334) 8144554

\\

OPERATING STATUS

1. Reporting Period:
2.

Design Electrical Rating (Net MWe):

3.

Maximum Dependable Capacity (Net MWe):_

AUGUST 2003 855 839 This Month Year to Date Cumulative

4.

Number Of Hours Reactor Was Critical:

5. Hours Generator On-line:
6.

Unit Reserve Shutdown Hours:

7. Net Electrical Energy Generated (MWH):

744.0 5,831.0 744.0 5,798.8 0.0 0.0 621,096.0 4,916,563.0 169,019.3 167,027.4 0.0 133,962,085.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:

September 5, 2003 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 REPORTING PERIOD:

AUGUST 2003 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.

(YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(I) REASON:

(2) METHOD:

A -Equipment Failure (Explain)

I - Manual B -Maintenance or Test 2 - Manual Trip/Scram C -Refueling 3 - Automatic Trip/Scram D -Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 -Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT

.There were no significant power reductions this period.

E2-2