Text

ir- - -

J. Bernie Beasley, Jr., P.E. Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7110 Fax 205.992.0341 SOUTHERN A August 13, 2003 COMPANY Energy to Serve Your World' Docket Nos.: 50-348 NL-03-1659 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the July 2003 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, JBBALPH/sdl

Enclosures:

El - FNP Unit 1 Monthly Operating Report E2 - FNP Unit 2 Monthly Operating Report cc: Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. D. E. Grissette, General Manager - Plant Farley Document Services RTYPE: CFA04.054 & G9.03 -Xref: A.2.1; LC# 13826 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Farley Mr. T. P. Johnson, Senior Resident Inspector - Farley

,-, N e, 4 _q

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: . M. Farley - Unit I DATE: August 4,2003 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: JULY 2003
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 830 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 4,301.8 185,226.7 S. Hours Generator On-line: 744.0 4,236.9 182,847.2
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 619,989.0 3,489,797.0 145,064,535.0 CHALLENGES TO PRESSURIZER PORkV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-l

UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: August 4, 2003 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JULY 2003 TELEPHONE: (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMmDD) S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(1) REASON: (2) METHOD:

A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E -Operator Training/License Examination 5 - Other (Explain)

F -Administrative

  • - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 01 15 on July 19, 2003 the unit was ramped to approximately 89% power for governor valve testing.

The testing was completed and the unit was returned to 100% power at 0517 on July 19, 2003.

E1-2

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: August 4,2003 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: JULY 2003
2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 839 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 5,087.0 168,275.3
5. Hours Generator On-line: 711.8 5,054.8 166,283.4
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 585,548.0 4,295,467.0 133,340,989.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: August 4,2003 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JULY 2003 TELEPHONE: (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD) S: Scheduled (Hours) (1) (2) Comments 1 030725 S 32.2 B 5 The unit was removed from the grid for a planned repair of a main generator hydrogen leak.

The leak was repaired and the unit was reconnected to the grid.

(1)

ESSON: (2) METHOD:

A -Equipment Failure (Explain) I - Manual B -Maintenance or Test 2 - Manual Trip/Scram C Refueling 3 -Automatic Trip/Scram D -Regulatory Restriction 4 - Continuation E -Operator Training/License Examination 5 - Other (Explain)

F -Administrative

-Operational Error (Explain)

H -Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 2313 on July 25, 2003 the unit was ramped down to approximately 15% power for a planned repair of a leak on a main generator hydrogen piping flange. With the reactor remaining at approximately 15% power, the unit was removed from the grid at 0610 on July 26, 2003. The repair was completed'and the unit was connected to the grid at 1424 on July 27, 2003 and returned to 100% power at 0703 on July 28, 2003.

E2-2