NL-03-0761, March 2003 Monthly Operating Report for Farley Nuclear Plant

From kanterella
Jump to navigation Jump to search
March 2003 Monthly Operating Report for Farley Nuclear Plant
ML031060271
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/14/2003
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-0761
Download: ML031060271 (5)


Text

J. Barnie Beasley, Jr., P.E. Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7110 Fax 205 992 0341 SOUTHERN A 4 COMPANY April 14, 2003 Energy to Serve YourWorld' Docket Nos.: 50-348 NL-03-0761 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the March 2003 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, JBB/LPH/sdl

Enclosures:

El - FNP Unit 1 Monthly Operating Report E2 - FNP Unit 2 Monthly Operating Report cc: Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. D. E. Grissette, General Manager - Plant Farley Document Services RTYPE: CFA04.054 & G9.03 - Xref: A.2. 1; LC# 13762 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Farley Mr. T. P. Johnson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: April 5, 2003 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: MARCH 2003
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 830 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 673.1 2,089.1 183,014.0
5. Hours Generator On-line: 672.1 2,088.1 180,698.4
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 557,563.0 1,761,168.0 143,335,906.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit I DATE: April 5, 2003 COMPLETED BY: W. L. Marlar REPORTING PERIOD: MARCH 2003 TELEPHONE: (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD) S: Scheduled (Hours) (1) (2) Comments 1 030329 S 71.9 C 1 At 0005 on March 29, the unit was taken off line for the eighteenth refueling outage.

(1) REASON (2) METHOD A - Equipment Failure (Explain) 1 -Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 0032 on March 23, Unit 1 started derating from 100% power due to power coastdown prior to a normal refueling outage. At 1800 on March 28, with the unit at approximately 92% power, the unit was ramped down and taken off line at 0005 on March 29 for the eighteenth refueling outage. At 0107 on March 29, the reactor was shut down. Normal refueling outage activities continued through the end of March.

E1-2

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: J. M Farley - Unit 2 DATE: April 5, 2003 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: MARCH 2003
2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 839 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 2,160.0 165,348.3
5. Hours Generator On-line: 744.0 2,160.0 163,388.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 639,038.0 1,864,304.0 130,909,826.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I 1 E2-1

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: April 5,2003 COMPLETED BY: W. L. Marlar REPORTING PERIOD: MARCH 2003 TELEPHONE: (334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD) S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(I) REASON (2) METHOD A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.