NL-05-0039, December 2004 Monthly Operating Report Joseph M Farley Nuclear Plant

From kanterella
Jump to navigation Jump to search
December 2004 Monthly Operating Report Joseph M Farley Nuclear Plant
ML050180254
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/12/2005
From: Stinson L
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-05-0039
Download: ML050180254 (3)


Text

L. M. Stinson (Mike)

Vice President Southern Nuclear Operating Company. Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 4

SOUTHERN £>

COMPANY Ener ytServe1rurlerld NL-05 039 January 12, 2005 Docket Nos.:

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the December 2004 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, L. M. Stinson LMS/LPII/sdl

Enclosures:

1. FNP Unit I Monthly Operating Report
2. FNP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, General Manager - Plant Farley RTYPE: CFA04.054; LC# 14202 U. S. Nuclear Renulatory Commission Dr. W. D. Travers, Regional Administrator Mr. S. E. Peters, NRR Project Manager - Farley Mr. C. A. Patterson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME rE DATE Jai COMPLETED BY Fil TELEPHONE A;

REPORTING PERIOD:

-348 arley 1 3nuary 07, 2005 il Marlar 34-814-4554 December 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net)

3. Number of Hours the Reactor was Critical
4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs) 854.00 851.00 This Month 744.00 744.00 0.00 642,529.00 Yr-to-Date 7,711.21 7,628.01 0.00 6,423,882.00 Cumulative 196,610.94 194,148.19 0.00 154,601,258.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period. There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1

OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME FE DATE Jai COMPLETED BY Sil TELEPHONE M;

REPORTING PERIOD:

-364 irley 2 nuary 07, 2005 i Marlar 4-814-4554 December 2004

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net)
3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs) 855.00 849.00 This Month 744.00 744.00 0.00 644,877.00 Yr-to-Date 7,993.75 7,949.56 0.00 6,724,103.00 Cumulative 179,912.55 177,866.38 0.00 143,148,985.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

There were no significant power reductions this period. There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1