NL-05-0039, December 2004 Monthly Operating Report Joseph M Farley Nuclear Plant
| ML050180254 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/12/2005 |
| From: | Stinson L Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-05-0039 | |
| Download: ML050180254 (3) | |
Text
L. M. Stinson (Mike)
Vice President Southern Nuclear Operating Company. Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 4
SOUTHERN £>
COMPANY Ener ytServe1rurlerld NL-05 039 January 12, 2005 Docket Nos.:
50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the December 2004 Monthly Operating Reports as required by section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Sincerely, L. M. Stinson LMS/LPII/sdl
Enclosures:
- 1. FNP Unit I Monthly Operating Report
- 2. FNP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, General Manager - Plant Farley RTYPE: CFA04.054; LC# 14202 U. S. Nuclear Renulatory Commission Dr. W. D. Travers, Regional Administrator Mr. S. E. Peters, NRR Project Manager - Farley Mr. C. A. Patterson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME rE DATE Jai COMPLETED BY Fil TELEPHONE A;
REPORTING PERIOD:
-348 arley 1 3nuary 07, 2005 il Marlar 34-814-4554 December 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net)
- 3. Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs) 854.00 851.00 This Month 744.00 744.00 0.00 642,529.00 Yr-to-Date 7,711.21 7,628.01 0.00 6,423,882.00 Cumulative 196,610.94 194,148.19 0.00 154,601,258.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- There were no significant power reductions this period. There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1
OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME FE DATE Jai COMPLETED BY Sil TELEPHONE M;
REPORTING PERIOD:
-364 irley 2 nuary 07, 2005 i Marlar 4-814-4554 December 2004
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net)
- 3. Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs) 855.00 849.00 This Month 744.00 744.00 0.00 644,877.00 Yr-to-Date 7,993.75 7,949.56 0.00 6,724,103.00 Cumulative 179,912.55 177,866.38 0.00 143,148,985.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- There were no significant power reductions this period. There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1