Text

Dave Morey Southern Nuclear Vice President Operating Company, Inc.

Farley Project Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.5131 August 12, 2002 SOUTHERN COMPANY Docket Nos.: 50-348 Energy to Serve Your World 50-364 NEL-02-0165 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the July 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, Dave Morey RWC:mor

Enclosures:

1. July Monthly Operating Report for Plant Farley Unit 1
2. July Monthly Operating Report for Plant Farley Unit 2

Page 2 U. S. Nuclear Regulatory Commission cc: Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit I DATE: August 8, 2002 COMPLETED BY: W. L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: JULY 2002
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 833 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 5,056.1 177,302.0
5. Hours Generator On-line: 744.0 5,040.0 175,008.2
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 614,347.0 4,220,294.0 138,573,240.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-i

UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: August 8, 2002 CON4PLETED BY: W. L. Marlar REPORTING PERIOD: JULY 2002 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. Date S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(1) REASON: (2) METHOD:

A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

El-2

OPERATING DATA REPORT DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: August 8, 2002 COMPLETED BY: W.L. Marlar TELEPHONE: (334) 814-4554 OPERATING STATUS

1. Reporting Period: JULY 2002
2. Design Electrical Rating (Net MWe): 855
3. Maximum Dependable Capacity (Net MWe): 842 This Month Year to Date Cumulative
4. Number Of Hours Reactor Was Critical: 744.0 5,087.0 160,572.6
5. Hours Generator On-line: 744.0 5,087.0 158,632.8
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 620,323.0 4,312,552.0 126,894,631.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No. Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: August 8, 2002 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JULY 2002 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. Date S: Scheduled (Hours) (1) (2) Comments There were no unit shutdowns during the month.

(1) REASON: (2) METHOD:

A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/license Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

  • - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT At 0000 on 020720, a ramp down to approximately 92% power was commenced to perform governor valve testing. The testing was completed and the unit was returned to 100% power at 0700 on 020720.

E2-2