NL-03-0554, February 2003 Monthly Operating Report for Joseph M. Farley

From kanterella
Jump to navigation Jump to search
February 2003 Monthly Operating Report for Joseph M. Farley
ML030720168
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/10/2003
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-0554
Download: ML030720168 (5)


Text

J. Barnie Beasley, Jr., P.E.

Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7110 Fax 205 992 0341 SOUTHERNAM COMPANY Energy to Serve Your World '

NL-03-0554 March 10, 2003 Docket Nos.:

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the February 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, J. 1B. Beasle/y,nr.

JBB/LPH/sdl

Enclosures:

E l - FNP Unit 1 Monthly Operating Report E2 - FNP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. D. E. Grissette, General Manager - Plant Farley Document Services RTYPE: CFA04.054 & G9.03 - Xref: A.2.1 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Farley Mr. T. P. Johnson, Senior Resident Inspector - Farley

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley -Unit 1 DATE:

March 5, 2003 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS Reporting Period:

Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

FEBRUARY 2003 854 830 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:

Hours Generator On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWH):

672.0 672.0 0.0 570,080.0 1,416.0 182,340.9 1,416.0 180,026.3 0.0 0.0 1,203,605.0 142,778,343.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.

Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

1.
2.

3.

4.
5.
6.

7.

UNIT SHUTDOWNS REPORTING PERIOD: FEBRUARY 2003 DOCKET NO.:

50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:

March 5,2003 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.

(YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(1) REASON:

(2) METHOD A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 There were no significant power reductions this period.

OPERATING DATA REPORT DOCKET NO.:

50-364 UNIT NAME:

J. M. Farley - Unit 2 DATE:

March 5, 2003 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 OPERATING STATUS

1.

Reporting Period:

FEBRUARY 2003

2.

Design Electrical Rating (Net MWe):

855

3.

Maximum Dependable Capacity (Net MWe):

839 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:

Hours Generator On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (MWH):

672.0 672.0 0.0 580,197.0 1,416.0 164,604.3 1,416.0 162,644.6 0.0 0.0 1,225,266.0 130,270,788.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES E2-1

4.
5.
6.

7.

Date I Tag No.

IEvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

I

UNIT SHUTDOWNS REPORTING PERIOD: FEBRUARY 2003 DOCKET NO.:

50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:

March 5, 2003 COMPLETED BY:

W. L. Marlar TELEPHONE:

(334) 814-4554 Type Method of Date F: Forced Duration Reason Shutting Down Cause/Corrective Actions No. (YYMMDD)

S: Scheduled (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

(I) REASON.

(2) METHOD A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.