Category:License-Operator
MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23107A2502023-04-18018 April 2023 Requalification Program Inspection ML24016A0742023-01-10010 January 2023 Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4402022-04-0808 April 2022 Written Exam Checklist: 2.3-4 ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML22164A9552022-03-30030 March 2022 Administered Exam: Written Test with Answer Key ML22285A2612022-03-30030 March 2022 Administrative Files: Forms 2.3-3, 2.3-5, and 4.1-1 ML22164A9492022-03-30030 March 2022 Administered Exam: Operating Test (Admin, Sim, and in-plant Jpms; Scenarios) ML22285A2462022-01-21021 January 2022 Proposed Exam: Walkthrough (Admin, Sim, and in-plant Jpms) ML22285A2482022-01-21021 January 2022 Proposed Exam: Written Test ML22285A2472022-01-21021 January 2022 Proposed Exam: Scenarios ML22285A2422021-10-29029 October 2021 Outline Submittal - Forms 3.2-1, 3.2-2, and 4.1 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21105A3712021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C3342019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines 2023-05-10
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML24016A0742023-01-10010 January 2023 Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4402022-04-0808 April 2022 Written Exam Checklist: 2.3-4 ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML22164A9492022-03-30030 March 2022 Administered Exam: Operating Test (Admin, Sim, and in-plant Jpms; Scenarios) ML22164A9552022-03-30030 March 2022 Administered Exam: Written Test with Answer Key ML22285A2612022-03-30030 March 2022 Administrative Files: Forms 2.3-3, 2.3-5, and 4.1-1 ML22285A2472022-01-21021 January 2022 Proposed Exam: Scenarios ML22285A2462022-01-21021 January 2022 Proposed Exam: Walkthrough (Admin, Sim, and in-plant Jpms) ML22285A2482022-01-21021 January 2022 Proposed Exam: Written Test ML22285A2422021-10-29029 October 2021 Outline Submittal - Forms 3.2-1, 3.2-2, and 4.1 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A9822017-08-28028 August 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17072A0122017-03-0909 March 2017 Senior Reactor and Reactor Operator Initial License Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17003A2782016-11-28028 November 2016 Final Qa/Related Forms - Forms ES-401 (Folder 1) 2023-05-10
[Table view] |
Text
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 1 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 1 Date of Exam: 10/2/2023 - 10/13/2022 Operating Test No: BV1LOT23 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 (Spare)
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
M A
S T
E R
RX 5
5 1
4 1
1 0
NOR 1
1 3
3 1,2 2
1,4 1
1 1
1 I/C 3,4,5, 7,8,9 4,7,9 3,8 1,2, 4,5, 8,9 2,4,5,9 1,8 3,4, 5,7, 8,9 4,5,8 3,7,9 3,5, 7,8, 9,10 5,8,10 3,7,9 4
4 2
MAJ 6
6 6
6,7 6,7 6,7 6
6 6
6 6
6 2
2 1
MC 9
3,8 5,9 1
8 3,7 8,10 3,7,9 1
1 0
TS 2,4,5 2,4 4,5 2,3 0
2 2
SRO-U1 RX 5
1 1
1 0
NOR 1
3 2
1 1
1 I/C 3,4,5, 7,8,9 1,8 8
4 4
2 MAJ 6
6,7 3
2 2
1 MC 1
1 1
1 0
TS 2,4,5 3
0 2
2 SRO-U2 RX 0
1 1
0 NOR 1
1 1
1 1
I/C 3,4,5, 7,8,9 6
4 4
2 MAJ 6
1 2
2 1
MC 0
1 1
0 TS 2,4,5 3
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 2 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 1 Date of Exam: 10/2/2023 to 10/13/2023 Operating Test No: BV1LOT23 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
SRO-I1 RX 5
1 1
1 0
NOR 3
1 1
1 1
I/C 4,7,9 1,2,4, 5,8,9 9
4 4
2 MAJ 6
6,7 3
2 2
1 MC 9
1 1
1 0
TS 2,4 2
0 2
2 SRO-I2 RX 5
1 1
1 0
NOR 3
1 1
1 1
I/C 4,7,9 1,2,4, 5,8,9 9
4 4
2 MAJ 6
6,7 3
2 2
1 MC 9
1 1
1 0
TS 2,4 2
0 2
2 SRO-I3 RX 5
1 1
1 0
NOR 3
2 2
1 1
1 I/C 4,7,9 1,2,4, 5,8,9 3,7,9 12 4
4 2
MAJ 6
6,7 6
4 2
2 1
MC 9
3,7 3
1 1
0 TS 2,4 2
0 2
2 SRO-I4 RX 5
1 1
1 0
NOR 3
1,2 3
1 1
1 I/C 1,8 3,4,5, 7,8,9 8
4 4
2 MAJ 6,7 6
3 2
2 1
MC 1
1 1
1 0
TS 4,5 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 3 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 1 Date of Exam: 10/2/2023 to 10/13/2023 Operating Test No: BV1LOT23 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
SRO-I5 RX 5
1 1
1 0
NOR 1
3 2
1 1
1 I/C 3,4,5, 7,8,9 1,8 8
4 4
2 MAJ 6
6,7 3
2 2
1 MC 1
1 1
1 0
TS 2,4,5 3
0 2
2 SRO-I6 RX 5
1 1
1 0
NOR 3
1 1
1 1
I/C 4,7,9 1,2,4, 5,8,9 9
4 4
2 MAJ 6
6,7 3
2 2
1 MC 9
1 1
1 0
TS 2,4 2
0 2
2 SRO-I7 RX 5
1 1
1 0
NOR 1
3 2
1 1
1 I/C 3,4,5, 7,8,9 1,8 8
4 4
2 MAJ 6
6,7 3
2 2
1 MC 1
1 1
1 0
TS 2,4,5 3
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 4 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 1 Date of Exam: 10/2/2023 to 10/13/2023 Operating Test No: BV1LOT23 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
RO-R1 RX 0
1 1
0 NOR 1
1 1
1 1
I/C 3,8 2,4,5, 9
6 4
4 2
MAJ 6
6,7 3
2 2
1 MC 3,8 5,9 4
1 1
0 TS 0
0 2
2 RO-R2 RX 1
1 1
1 0
NOR 1
1 1
1 1
I/C 3,8 2,4,5, 9
4,5,8 9
4 4
2 MAJ 6
6,7 6
4 2
2 1
MC 3,8 5,9 8
5 1
1 0
TS 0
0 2
2 RO-R3 RX 0
1 1
0 NOR 1
1 1
1 1
I/C 3,8 2,4,5, 9
6 4
4 2
MAJ 6
6,7 3
2 2
1 MC 3,8 5,9 4
1 1
0 TS 0
0 2
2 RO-R4 RX 0
1 1
0 NOR 1
1 1
1 1
I/C 3,8 2,4,5, 9
6 4
4 2
MAJ 6
6,7 3
2 2
1 MC 3,8 5,9 4
1 1
0 TS 0
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 5 of 5 BVPS Facsimile Rev. AG Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY:
RX = Reactivity Manipulation NOR = Normal Evolution I/C = Instrument/Component Failure MAJ = Major Transient MC = Manual Control of Automatic Function TS = Technical Specification Evaluation RO = Reactor Operator SRO-I or I = Instant Senior Reactor Operator SRO-U or U = Upgrade Senior Reactor Operator SRO = Senior Reactor Operator ATC = At the Controls BOP = Balance of Plant