MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23107A2502023-04-18018 April 2023 Requalification Program Inspection ML24016A0742023-01-10010 January 2023 Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4402022-04-0808 April 2022 Written Exam Checklist: 2.3-4 ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML22164A9552022-03-30030 March 2022 Administered Exam: Written Test with Answer Key ML22285A2612022-03-30030 March 2022 Administrative Files: Forms 2.3-3, 2.3-5, and 4.1-1 ML22164A9492022-03-30030 March 2022 Administered Exam: Operating Test (Admin, Sim, and in-plant Jpms; Scenarios) ML22285A2462022-01-21021 January 2022 Proposed Exam: Walkthrough (Admin, Sim, and in-plant Jpms) ML22285A2482022-01-21021 January 2022 Proposed Exam: Written Test ML22285A2472022-01-21021 January 2022 Proposed Exam: Scenarios ML22285A2422021-10-29029 October 2021 Outline Submittal - Forms 3.2-1, 3.2-2, and 4.1 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21105A3712021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C3342019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines 2023-05-10
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML24016A0742023-01-10010 January 2023 Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4402022-04-0808 April 2022 Written Exam Checklist: 2.3-4 ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML22164A9492022-03-30030 March 2022 Administered Exam: Operating Test (Admin, Sim, and in-plant Jpms; Scenarios) ML22164A9552022-03-30030 March 2022 Administered Exam: Written Test with Answer Key ML22285A2612022-03-30030 March 2022 Administrative Files: Forms 2.3-3, 2.3-5, and 4.1-1 ML22285A2472022-01-21021 January 2022 Proposed Exam: Scenarios ML22285A2462022-01-21021 January 2022 Proposed Exam: Walkthrough (Admin, Sim, and in-plant Jpms) ML22285A2482022-01-21021 January 2022 Proposed Exam: Written Test ML22285A2422021-10-29029 October 2021 Outline Submittal - Forms 3.2-1, 3.2-2, and 4.1 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A9822017-08-28028 August 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17072A0122017-03-0909 March 2017 Senior Reactor and Reactor Operator Initial License Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17003A2782016-11-28028 November 2016 Final Qa/Related Forms - Forms ES-401 (Folder 1) 2023-05-10
[Table view] |
Text
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 1 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 2 Date of Exam: 4/18/2022 to 4/29/2022 Operating Test No: BV2LOT22 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 (Spare) 3 4
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
M A
S T
E R
RX 4
2 3
1 1
0 NOR 4
1,2 1
3 3
1 1
1 I/C 1,2,3, 4,6,7, 9
1,6,9 2,3,4, 7
1,3,5, 7,8,9 1,7 3,5,8, 9
3,5,6, 8,9, 10,11 6,8,9, 10 3,5,8, 11 1,2,5, 6,7,8 2,5,8 1,6,7 4
4 2
MAJ 5,8 5,8 5,8 6,10 6,10 6,10 7
7 7
4 4
4 2
2 1
MC 1
2 1
3 8,9, 10 3,8, 11 2
6 1
1 0
TS 1,3 1,2 4,5 1,2 0
2 2
RO-1 RX 0
1 1
0 NOR 1
3 2
1 1
1 I/C 1,6,9 3,5,8, 11 1,6,7 10 4
4 2
MAJ 5,8 7
4 4
2 2
1 MC 1
3,8, 11 6
5 1
1 0
TS 0
0 2
2 RO-2 RX 0
1 1
0 NOR 1
3 2
1 1
1 I/C 1,6,9 3,5,8, 11 1,6,7 10 4
4 2
MAJ 5,8 7
4 4
2 2
1 MC 1
3,8, 11 6
5 1
1 0
TS 0
0 2
2 RO-3 RX 2
1 1
1 0
NOR 3
1 1
1 1
I/C 1,6,9 6,8,9, 10 1,6,7 10 4
4 2
MAJ 5,8 7
4 4
2 2
1 MC 1
8,9, 10 6
5 1
1 0
TS 0
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 2 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 2 Date of Exam: 4/18/2022 to 4/29/2022 Operating Test No: BV2LOT22 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I1 RX 3
1 1
1 0
NOR 1,2 2
1 1
1 I/C 3,5,6, 8,9, 10,11 2,5,8 10 4
4 2
MAJ 7
4 2
2 2
1 MC 2
1 1
1 0
TS 4,5 2
0 2
2 SRO-I2 RX 2
1 1
1 0
NOR 3
1 1
1 1
I/C 2,3,4, 7
6,8,9, 10 1,2,5, 6,7,8 14 4
4 2
MAJ 5,8 7
4 4
2 2
1 MC 2
8,9, 10 4
1 1
0 TS 1,2 2
0 2
2 SRO-I3 RX 3
1 1
1 0
NOR 1,2 2
1 1
1 I/C 3,5,6, 8,9, 10,11 2,5,8 10 4
4 2
MAJ 7
4 2
2 2
1 MC 2
1 1
1 0
TS 4,5 2
0 2
2 SRO-I4 RX 2
1 1
1 0
NOR 3
1 1
1 1
I/C 2,3,4, 7
6,8,9, 10 1,2,5, 6,7,8 14 4
4 2
MAJ 5,8 7
4 4
2 2
1 MC 2
8,9, 10 4
1 1
0 TS 1,2 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 3 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 2 Date of Exam: 4/18/2022 to 4/29/2022 Operating Test No: BV2LOT22 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I5 RX 3
1 1
1 0
NOR 1,2 2
1 1
1 I/C 2,3,4, 7
3,5,6, 8,9, 10,11 2,5,8 14 4
4 2
MAJ 5,8 7
4 4
2 2
1 MC 2
2 2
1 1
0 TS 4,5 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 4 of 5 BVPS Facsimile Rev. AG Facility Beaver Valley Unit 2 Date of Exam: 4/18/2022 to 4/29/2022 Operating Test No: BV2LOT22 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-U1 RX 0
1 1
0 NOR 1
3 2
1 1
1 I/C 3,5,8, 11 1,2,5, 6,7,8 10 4
4 2
MAJ 7
4 2
2 2
1 MC 3,8, 11 3
1 1
0 TS 1,2 2
0 2
2 SRO-U2 RX 0
1 1
0 NOR 0
1 1
1 I/C 1,2,3, 4,6,7, 9
7 4
4 2
MAJ 5,8 2
2 2
1 MC 0
1 1
0 TS 1,3 2
0 2
2 SRO-U3 RX 0
1 1
0 NOR 0
1 1
1 I/C 1,2,3, 4,6,7, 9
7 4
4 2
MAJ 5,8 2
2 2
1 MC 0
1 1
0 TS 1,3 2
0 2
2 SRO-U4 RX 0
1 1
0 NOR 0
1 1
1 I/C 1,2,3, 4,6,7, 9
7 4
4 2
MAJ 5,8 2
2 2
1 MC 0
1 1
0 TS 1,3 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist NUREG-1021, Revision 12 Page 5 of 5 BVPS Facsimile Rev. AG Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY:
RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; MC = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan