OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Perform a Stay Time Calculation and Choose Acceptable Pathway TRAINING MATERIAL NUMBER:
3AD-027 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
3AD-027 REVISION NUMBER:
0 TECHNICAL
REFERENCES:
1/2-ADM -1601, Radiation Protection Standards, Rev. 24 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
20 Minutes PREPARED BY:
A. Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 3AD-027 New Revision: 0 Description of Change(s):
- 1. New JPM.
Reason for Change (s):
- 1. New JPM.
Page 1 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:3AD-027 JPM REVISION: 0 Perform a Stay Time Calculation K/A
REFERENCE:
2.3.12 3.2/3.7 TASK ID:
0481-005-03-012 0481-005-03-043 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ ID:
Name/ID:
Name/ ID:
Name/ ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 5 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Determines the total dose received (17.25 mrem, acceptable range 17.2 to 17.3 mrem) and has selected the available path for performance of the job (path 2) without setting off the dose rate alarm.
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
Refer to Survey Map ECCS RM2022-TRG for the following activity.
- A plant event requires entry into a Locked High Radiation Area to vent the casing on pump HPI-1.
- You are to stage yourself in the Locked High Radiation Area (LHRA) where you can minimize your dose until directed to vent the pump. You are to remain in an area identified on the survey map with the lowest possible dose during the wait period.
- Your task will be to vent the HPI-1 Pump casing. The vent valve is located at the end of the pump, opposite the motor.
RWP limits:
o Dose Rate Alarm = 85 mrem/hr o
Dose Alarm = 50 mrem Timeline:
0800 - You enter the ECCS Room.
0830 - You are directed to start venting pump HPI-1.
0845 - Venting is complete. You immediately exit the room and report back to the Control Room.
INITIATING CUE:
Based upon the above timeline, the information from your RWP and the ECCS Room Survey Map:
- 1. Determine the total amount of dose that was received during the wait time and job performance. Use the highest potential dose rate in the immediate area of the work to determine your dose for the actual venting portion of the entry.
- 2. In accordance with your RWP and assuming there is no wait time, which path is the correct one to travel to the pump casing? (See labeled pathways 1, 2, 3).
REFERENCES:
1/2-ADM -1601, Radiation Protection Standards, Rev. 24 TOOLS:
Calculator HANDOUT:
1/2-ADM -1601, Radiation Protection Standards, Rev. 24 Survey Map ECCS RM 2022-TRG RWP FTO-001
Page 3 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:3AD-027 JPM REVISION: 0 JPM TITLE: Perform a Stay Time Calculation STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1. Review procedure and Survey Map ECCS Rm 2022-TRG.
1.1 Reviews procedure and map.
COMMENTS:
- 2. Determine the dose that was received while waiting in the lowest dose area in the Radiologically Controlled Area.
2.1 Calculates the dose received for the duration of the time in the low dose area.
2.2 Based on a 30 minute wait time in the area of the lowest dose of 2 mrem/hr:
Wait Area Dose: 2 mrem/hr
- 0.5 hr = 1 mrem.
COMMENTS:
EVALUATOR NOTE: Provide the candidate a copy of the procedure and the other handout materials.
Page 4 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:3AD-027 JPM REVISION: 0 JPM TITLE: Perform a Stay Time Calculation STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Determine the dose that was received while venting the pump.
3.1 Calculates the dose received for the duration of the time venting the pump. Per the Survey Map, location DR9 has the highest dose near the pump at 65 mrem/hr.
3.2.C Based on a 15 minute task duration at the pump with a dose rate of 65 mrem/hr:
Venting dose: 65 mrem/hr * (15/60) hr = 16.25 mrem.
(Acceptable Range is 16.2 to 16.3 mrem)
COMMENTS:
4.C Determine the total dose that was received while performing the task.
4.1 Calculates the total dose received while performing the task.
4.2.C Calculates the total dose received for the task.
Wait area dose: 1 mrem.
Venting dose: 16.25 mrem.
(Acceptable Range is 16.2 to 16.3 mrem)
Total dose: 1 mrem + 16.25 mrem = 17.25 mrem.
(Acceptable Range is 17.2 to 17.3 mrem)
COMMENTS:
Page 5 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER:3AD-027 JPM REVISION: 0 JPM TITLE: Perform a Stay Time Calculation STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 5.C Determine which pathway is acceptable to get to the job site.
5.1 Candidate reviews the map.
5.2C Candidate determines that Path 2 is the only way to get to the job site without setting off the dose rate (85 mrem/hr) alarm of their EPD.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: When the applicant has completed their This JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
Refer to Survey Map ECCS RM2022-TRG for the following activity.
- A plant event requires entry into a Locked High Radiation Area to vent the casing on pump HPI-1.
- You are to stage yourself in the Locked High Radiation Area (LHRA) where you can minimize your dose until directed to vent the pump. You are to remain in an area identified on the survey map with the lowest possible dose during the wait period.
- Your task will be to vent the HPI-1 Pump casing. The vent valve is located at the end of the pump, opposite the motor.
RWP limits:
o Dose Rate Alarm = 85 mrem/hr o
Dose Alarm = 50 mrem Timeline:
0800 - You enter the ECCS Room.
0830 - You are directed to start venting pump HPI-1.
0845 - Venting is complete. You immediately exit the room and report back to the Control Room.
INITIATING CUE:
Based upon the above timeline, the information from your RWP and the ECCS Room Survey Map:
- 1. Determine the total amount of dose that was received during the wait time and job performance. Use the highest potential dose rate in the immediate area of the work to determine your dose for the actual venting portion of the entry.
- 2. In accordance with your RWP and assuming there is no wait time, which path is the correct one to travel to the pump casing? (See labeled pathways 1, 2, 3).
Results:
- 1.
Total Dose Received: __________________________________ mrem.
- 2.
Chosen pathway:_____________________________________.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Complete Surveillance of RHS Pump TRAINING MATERIAL NUMBER:
2AD-028 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-028 REVISION NUMBER:
4 TECHNICAL
REFERENCES:
2OST-10.2, Residual Heat Removal Pump [2RHS*P21B] Performance Test, Rev. 21 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
10 Minutes PREPARED BY:
M. Klingensmith Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-028 New Revision: 4 Description of Change(s):
- 1. Updated for procedure revision.
- 2. Modified Task Number.
- 3. Modified numbers in step 1 and 2 and procedure Data Sheet to match updated procedure.
- 4. Modified step 3 and 5 to remove Pump Vertical vibrations.
- 5. Made Step 5 non-critical.
Reason for Change (s):
- 1. 2OST-10.2 was revised.
- 2. Task list has been updated.
- 3. Procedure criteria has been modified.
- 4. This reading is no longer a part of the data sheet.
- 5. This step is documentation only and not required per the Task Standard.
Page 1 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-028 JPM REVISION: 4 JPM TITLE: Complete Surveillance of RHS Pump K/A
REFERENCE:
2.2.37 3.6 / 4.6 TASK ID:
0101-202-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
10 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 4 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
2RHS*P21B P is calculated and a determination is made that the P does NOT meet the acceptance Criteria. A determination is made that the pump and motor vibrations do NOT meet the acceptance criteria.
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
Unit 2 is in Mode 5 with RCS core exit thermocouple temperatures at 110°F. Surveillance 2OST-10.2, Residual Heat Removal Pump
[2RHS*P21B] Performance Test is being performed. This is a GROUP A Pump Test.
Independent verifications of the calculations on Data Sheet 2 are required.
INITIATING CUE:
- Complete the required independent verifications of the calculations on Data Sheet 2 of 2OST-10.2
- Determine if the Pump meets ALL of the Acceptance Criteria specified in step III A.
- DOCUMENT the results of your Acceptance Criteria Determination in the comments section of the cover page.
REFERENCES:
2OST-10.2, Residual Heat Removal Pump [2RHS*P21B]
Performance Test, Rev. 21 TOOLS:
None HANDOUT:
2OST-10.2, Residual Heat Removal Pump [2RHS*P21B]
Performance Test (Rev. 21) completed with unacceptable P and vibrations.
Page 3 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-028 JPM REVISION: 4 JPM TITLE: Complete Surveillance of RHS Pump STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Calculates Pump Flowrate.
1.1 3425 gpm + 500 gpm + 100 gpm = 4025 gpm.
1.2 Determines 4025 gpm is within Acceptable range of 4000-4100 gpm.
COMMENTS:
- 2.
Calculates Pump P.
2.1 293 psig - 200 psig = 93 psid.
2.2 Determines 93 psid is LESS THAN Acceptable range of 95.3-109.4 psid.
COMMENTS:
3.C
[2RHS*P21B], Residual Heat Removal Pump: Operates within the limits of BVPS IST Program ( T.S.5.5.4) as follows: Motor AND Pump Vibration (Data Sheet 1).
3.1 Compares Actual Motor and Pump Vibrations on Data Sheet 1 to Acceptable and Alert range.
3.2C Determines Motor Inboard Axial vibrations are GREATER THAN Acceptable and Alert Range.
3.3C Determines Pump Inboard Horizontal vibration is GREATER THAN Acceptable and Alert Range.
COMMENTS:
Page 4 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-028 JPM REVISION: 4 JPM TITLE: Complete Surveillance of RHS Pump STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 4.C
[2RHS*P21B], Residual Heat Removal Pump: Operates within the limits of BVPS IST Program (T.S. 5.5.4) as follows: Delta-P (Data Sheet 2).
4.1 Compares calculated Delta P on Data Sheet 2 to Acceptable Range.
4.2C Determines calculated Delta P is LESS THAN Acceptable Range.
COMMENTS:
- 5.
Completes the front cover sheet.
5.1 Places a checkmark in the Problems encountered block of cover page.
5.2 Lists the following problems on OST problem sheet:
Motor Inboard (2) Axial vibration is GREATER THAN Acceptable and Alert Range Pump Inboard (3) Horizontal vibration is GREATER THAN Acceptable and Alert Range.
Calculated Delta P is LESS THAN Acceptable Range.
COMMENTS:
STOP TIME: ___________________
EXAMINER CUE: That completes this JPM.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
Unit 2 is in Mode 5 with RCS core exit thermocouple temperatures at 110°F. Surveillance 2OST-10.2, Residual Heat Removal Pump
[2RHS*P21B] Performance Test is being performed. This is a GROUP A Pump Test.
Independent verifications of the calculations on Data Sheet 2 are required.
INITIATING CUE:
- Complete the required independent verifications of the calculations on Data Sheet 2 of 2OST-10.2
- Determine if the Pump meets ALL of the Acceptance Criteria specified in step III A.
- DOCUMENT the results of your Acceptance Criteria Determination in the comments section of the cover page.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Plot and Evaluate 1/M Data TRAINING MATERIAL NUMBER:
2AD-016 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-016 REVISION NUMBER:
7 TECHNICAL
REFERENCES:
2OM-50.4.D2, Reactor Startup From Mode 3 to Mode 2, Rev 7 2OM-50.4.F, Performing An Estimated Critical Position Calculation, Rev 12 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
20 Minutes PREPARED BY:
A. Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-016 New Revision: 7 Description of Change(s):
- 1. Updated procedure revisions.
- 2. Updated Task ID.
- 3. Updated initial conditions.
Reason for Change (s):
- 1. Validating JPM.
- 2. Procedure change.
Page 1 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-016 JPM REVISION: 6 JPM TITLE: Plot and Evaluate 1/M Data K/A
REFERENCE:
2.1.43 4.1 / 4.3 TASK ID:
0021-022-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 4 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Determines that 1/M data predicts >1000 pcm below ECP value for critical rod height. Notify SM/US that appropriate actions of 2OM-50.4.D2 must be taken. (Insert all control rods)
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
The unit is in Mode 2.
A reactor startup is in progress, following a reactor trip from full power.
Control Bank C is at 79 steps.
Control Bank D is at 0 steps.
RCS Boron concentration is 1088 ppm.
INITIATING CUE:
Your Supervisor directs you to complete the 1/M plot per 2OM-50.4.F, using the SR count rate data provided on Data Sheet 3. Compare the 1/M data with the predicted ECP data and make a recommendation for further rod withdrawal. Document your recommendation in the box below. (Located on candidate direction sheet )
REFERENCES:
2OM-50.4.F, Performing An Estimated Critical Position Calculation, Rev. 12 2OM-50.4.D2, Reactor Startup From Mode 3 to Mode 2, Rev. 7 TOOLS:
Calculator; Ruler/straight edge.
HANDOUT:
2OM-50.4.F, Performing An Estimated Critical Position Calculation, Rev. 12 with Data sheet 1 completed and Data Sheet 3 partially completed.
2OM-50.4.D2, Reactor Startup From Mode 3 to Mode 2, Rev. 7
Page 3 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-016 JPM REVISION: 6 JPM TITLE: Plot and Evaluate 1/M Data STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Refer to Data sheet 3.
1.1 Refers to data sheet 3 for count rate data.
COMMENTS:
2.C Plots Data Sheet 3 Data on Figure 1.
2.1.
Evaluates count rate data from Data Sheet 3 and plots this data on Figure 1 (1/M Plot) for 230 total steps.
(~70 Steps CB D) 2.2.
Evaluates count rate data from Data Sheet 3 and plots this data on Figure 1 (1/M Plot) for 300 total steps. (~
22 Steps CB D) 2.3.C Evaluates count rate data from Data Sheet 3 and plots this data on Figure 1 (1/M Plot) for 335 total steps.
(~115 Steps CB C)
COMMENTS:
EVALUATOR NOTE: See Attached Answer Key for 1/M plot values. It is not necessary to plot both SR curves since the data is identical.
Page 4 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-016 JPM REVISION: 6 JPM TITLE: Plot and Evaluate 1/M Data STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Evaluate 1/M plot data 3.1.C Determines that the 1/M plot predicts criticality >1000 pcm below ECP.
3.2 Minimum rod height is Bank D at 0 steps versus ECP of Bank D 100 steps.
COMMENTS:
4.C Determines action for continued startup IAW 2OM-50.4.D2 Precaution and Limitation #9 or Attachment 3 Action 6.
4.1.C Informs SM/US that 1/M data indicates that criticality will occur >1000 pcm below the ECP.
4.2.C Recommends inserting all control banks to ZERO steps.
COMMENTS:
STOP TIME: ___________________
TERMINATING CUE: When the candidate makes a recommendation on continued startup, the evaluation for this JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The unit is in Mode 2.
A reactor startup is in progress, following a reactor trip from full power.
Control Bank C is at 79 steps.
Control Bank D is at 0 steps.
RCS Boron concentration is 1088 ppm.
INITIATING CUE:
Your Supervisor directs you to complete the 1/M plot per 2OM-50.4.F, using the SR count rate data provided on Data Sheet 3. Compare the 1/M data with the predicted ECP data and make a recommendation for further rod withdrawal. Document your recommendation in the box below.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
NAME :
RECOMMENDED ACTIONS:
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Calculating a Shutdown Margin with Temperature Defect TRAINING MATERIAL NUMBER:
2AD-060 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-060 REVISION NUMBER:
0 TECHNICAL
REFERENCES:
2OST-49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 22), Rev. 28 Unit 2 Plant Curve Book (Updated for Cycle 22)
INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
20 Minutes PREPARED BY:
Andrew Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-060 New Revision: 0 Description of Change(s):
Reason for Change (s):
Page 1 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod K/A
REFERENCE:
2.1.25 3.9/4.2 TASK ID:
0011-205-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID#:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 9 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
The Shutdown Margin calculation is determined to be 2.9718 %
(+/- 0.100) K/K and determines that acceptance criteria are met.
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
- The plant is in Mode 1, 100% power.
- All rods are at 226 steps on group demand counters.
- Computer Point T0496A (Tref) indicates 573 °F.
- Computer Point T0499A (Median Tavg) indicates 574 °F.
- Core Burn-up is 16000 MWD/MTU.
INITIATING CUE:
Your supervisor has directed you to perform a Shutdown Margin calculation for the present plant conditions using 2OST-49.1, Shutdown Margin Calculation (Plant Critical), beginning at step VII.A, and other provided references. Report your results in the COMMENT section of the OST cover sheet.
REFERENCES:
2OST-49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 22), Rev. 28 Unit 2 Plant Curve Book (Updated for Cycle 22)
Unit 2 LRM TOOLS:
Calculator Ruler/straight edge HANDOUT:
2OST-49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 22), Rev. 28 place kept up to step VII.A.
Unit 2 Plant Curve Book (Updated for Cycle 22)
Unit 2 LRM
Page 3 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
If the plant is in Mode 1:
Calculate the Temperature defect as follows (Otherwise N/A):
- a.
Determine Tavg/Tref deviation T by subtracting computer point T0496A (Tref) from T0499A (Median Tavg).
T = (T0499A) - (T0496A) = ____ °F
- b. Verify T is less than +3.0 °F.
- c. Using Unit 2 Curve Book Figure 2CB-4C Determine the MTC value for the current core burnup.
- d. Determine Temperature Defect as follows (mark unused step N/A):
1). If -3.0 °F < T + 0.5 °F, the Temperature Defect is 0.0% k/k.
- 2) If T > +0.5 °F, multiply Tavg /
Tref Deviation by the absolute value of MTC and divide by 1000.
Temperature Defect = T (step A.1.a)
- lMTCl (step A.1.c) / 1000
= _____ °F
- ____ pcm/°F / 1000 pcm/
%k/k
= ______ % k/k
- e. Record the Temperature Defect on Data Sheet 1.
(Step VII.A.1) 1.1 Performs Step VII.A.1.a, Plant in Mode 1, T is less than +3°F using data from the Initial Conditions.
T = (T0499A) - (T0496A) = _ _ °F T = 574 °F - 573°F = _1_ °F 1.2C Performs Step VII.A.1.b T is less than +3.0°F 1.3C Performs Step VII.A.1.c by determining MTC value in 2CB-4C is -30 pcm/°F 1.4C Determines that the Temperature Defect is 0.03 %
k/k since the T > +0.5 °F (MTC at 16000 MWD/MTU per 2CB-4C is -30 pcm/°F.)
1.5C Records 0.03 % k/k on Data Sheet 1.
COMMENTS:
EVALUATOR NOTE: Provide the Candidate with a copy of 2OST-49.1, Current Cycle Curve Book, Unit 2 LRM, calculator, and a ruler/straight edge.
EVALUATOR NOTE: Some judgment may be required to determine satisfactory performance on this JPM. Reasonable rounding or truncating of numbers is acceptable and may lead to a slight difference in final SDM calculation.
Page 4 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 2.
If the plant is in Mode 2, Verify that Tavg is less than 8F above Program Tavg as follows: (Otherwise N/A).
(Step VII.A.2) 2.1 Places N/A in Step VII.A.2, (Plant not in Mode 2).
COMMENTS:
- 3.
Request Chemistry to determine current RCS Boron concentration in ppm.
(Step VII.A.3) 3.1 Determines current boron concentration is 290 ppm from initial conditions.
COMMENTS:
- 4.
Record the number of steps withdrawn for Control Bank D from the group demand counters, (BB-B) on Data Sheet 1.
(Step VII.A.4) 4.1 Records Control Bank D as 226 steps withdrawn on Data Sheet 1 from initial conditions.
COMMENTS:
- 5.
Record the current reactor power level in percent of full power from 2NME-NR45, Reactor Excore Recorder, (VB-B) OR PCS computer point U1150, PWR RNG NUCLEAR FLUX 1M AVG, on Data Sheet 1.
(Step VII.A.5) 5.1 Records reactor power as 100% on Data Sheet 1.
COMMENTS:
Page 5 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 6.C Record the number of immovable or untrippable control rods on Data Sheet 1.
(Step VII.A.6) 6.1C Determines all rods are operable/trippable and records on Data Sheet 1.
COMMENTS:
- 7.
If the number of inoperable (untrippable) OR dropped control Rods is greater than 1, Use Attachment 1 to determine the required boron concentration with greater than one inoperable rod and Record below. (Otherwise N/A)
(Step VII.A.7) 7.1 Places N/A in Step VII.A.7.
COMMENTS:
- 8.
Determine control bank reactivity worth per the following:
Using the ARO Total Bank Worth table on Data Sheet 1, Enter the total bank worth for the current core burnup range, in the space provided on Data Sheet 1.
(Step VII.B.1.a) 8.1 Recognizes initial plant core burnup is 16000 MWD/MTU, based on initial plant conditions.
8.2 Refers to ARO Total Bank Worth table on Data Sheet 1 AND determines ARO Total Bank Worth to be 7.622.
8.3C Records 7.622 on Data Sheet 1 (Block B.1.a).
COMMENTS:
Page 6 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 9.
Using Curve Book Figures CB24A, 24B OR 24C, Determine integral rod worth for the current bank position AND Enter this value on Data Sheet 1.
Divide value from curve (in pcm) by 1000 to convert to
%k/k AND Record on Data Sheet 1.
(Step VII.B.1.b) 9.1 Using Curve Book Figure CB-24C, determines integral rod worth to be ZERO and records on Data Sheet 1 (Blocks B.1.b.1) and (B.1.b).
COMMENTS:
- 10.
If applicable, use attachment 3 to determine the worth of any dropped rod and record on Data Sheet 1.
(Step VII.B.1.c) 10.1 Determines VII.B.1.c is N/A with no dropped rods.
COMMENTS:
11.C Determine the Total Current Bank Worth by subtracting the integral rod worth and dropped rod worth from the Total Bank Worth AND Enter the result on Data Sheet 1.
(Step VII.B.1.d) 11.1C Determines Total Current Bank Worth as follows; Total Current Bank Worth = TBW(B.1.a) - IRW (B.1.b.1) - DRW (B.1.c)
TCBW = 7.622 0 = _ 7.622 _ % k/k and records on Data Sheet 1 (Block B.1.d).
COMMENTS:
Page 7 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 12.C Multiply this result by 0.9 to apply a 10% uncertainty AND Enter the result on Data Sheet 1.
(Step VII.B.1.e) 12.1C Determines 90% of TBW to be 7.622 X 0.9 =
_6.8598 % k/k and records on Data Sheet 1 (Block B.1.e).
COMMENTS:
13.C IF no rods are inoperable (untrippable), THEN Record Worst Case Rod worth on Data Sheet 1. Value is determined from Column A on Attachment 2 for the appropriate Cycle Burnup.
(Step VII.B.2.b) 13.1C Determines that no rods are inoperable or untrippable and enters Worst Case Rod worth (0.958% k/k) on Data Sheet 1.
COMMENTS:
14.C Subtract Stuck Rod Worth from the 90% Total Bank Worth value AND Enter the result on Data Sheet 1.
(Step VII.B.3) 14.1C Calculates 6.8598% k/k - 0.958% k/k = 5.9018%
k/k COMMENTS:
15.C Determine Power Defect as follows:
Record RCS Boron Concentration results from Chemistry on Data Sheet 1.
(Step VII.B.4.a) 15.1C Record RCS Boron Concentration of 290 ppm on Data Sheet 1 (Block B.4.a).
COMMENTS:
Page 8 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 16.C Using Curve Book Figure 29, Determine the B-10 Correction Factor for the present Burnup (If between two Burnup values, Use the B-10 Correction Factor for the greater MWD/MTU Burnup entry) AND Record on Data Sheet 1.
(Step VII.B.4.b) 16.1C Determines B-10 Correction Factor to be 0.863 and records on Data Sheet 1 (Block B.4.b).
COMMENTS:
17.C Determine Corrected Boron Concentration by multiplying the RCS Boron Concentration and the B-10 Correction Factor AND Record on Data Sheet 1.
(Step VII.B.4.c) 17.1C Determines Corrected Boron Concentration to be 250.27 (250) ppm and records on Data Sheet 1 (Block B.4.c).
COMMENTS:
18.C Using Curve Book Figure 21, Determine the ABSOLUTE VALUE of the Power Defect for the current power level and the Corrected Boron Concentration AND Enter this value on Data Sheet 1.
(Step VII.B.4.d) 18.1C Determines ABSOLUTE VALUE of the Power Defect to be 2900 pcm and records on Data Sheet 1 (Block B.4.d).
COMMENTS:
19.C Divide value from curve (in pcm) by 1000 to convert to
%k/k AND Record on Data Sheet 1.
(Step VII.B.4.e) 19.1C Converts ABSOLUTE VALUE of the Power Defect of 2900 pcm to 2.9 %k/k and records on Data Sheet 1 (Block B.4.e).
COMMENTS:
Page 9 of 9 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-060 JPM REVISION: 0 JPM TITLE: Calculating a Shutdown Margin Following a Dropped Rod STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 20.C Add the Temperature Defect calculated in step A.1.d to the Power Defect recorded in Step recorded in Step VII.B.4.e AND Record on Data Sheet 1.
(Step VII.B.4.f) 20.1C Determines Power Defect plus Temperature Defect to be 2.93 % k/k and records on Data Sheet 1 (Block B.4.f).
COMMENTS:
21.C Determine SHUTDOWN MARGIN by subtracting Power Defect (Step VII.B.4.f) from the value determined in Step VII.B.3 AND Record on Data Sheet
- 1.
(Step VII.B.5) 21.1C Determines SDM to be 2.9718 % (+/-.01)k/k, and records on Data Sheet 1 (Block B.4.f) AND records on the OST cover sheet.
21.2C Compares calculated SDM to the limits specified in the COLR and determines that it does meet acceptance criteria.
21.3 Records data on cover sheet.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: When the candidate hands in the OST cover sheet, the evaluation for this JPM is complete.
EVALUATOR CUE: Grader discretion may be required.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
- The plant is in Mode 1, 100% power.
- All rods are at 226 steps on group demand counters.
- Computer Point T0496A (Tref) indicates 573 °F.
- Computer Point T0499A (Median Tavg) indicates 574 °F.
Core Burn-up is 16000 MWD/MTU.
INITIATING CUE:
Your supervisor has directed you to perform a Shutdown Margin calculation for the present plant conditions using 2OST-49.1, Shutdown Margin Calculation (Plant Critical), beginning at step VII.A, and other provided references. Report your results in the COMMENT section of the OST cover sheet.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE (JPM)
TRAINING MATERIAL TITLE:
Review/Approve Completed Surveillance of RHS Pump (SRO ONLY)
TRAINING MATERIAL NUMBER:
2AD-026 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-026 REVISION NUMBER:
2 TECHNICAL
REFERENCES:
2OST-10.2, Residual Heat Removal Pump [2RHS*P21B] Performance Test, Rev. 21 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
10 Minutes PREPARED BY:
A. Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
TRAINING MATERIAL CHANGE FORM JPM CHANGE
SUMMARY
Affected JPM: 2AD-026 New Revision: 2 Description of Change(s):
- 1. Revised to reflect most current procedure revision.
- 2. Removed pump inboard vertical bearing high vibration due to removal from Data Sheet 1.
Reason for Change (s):
- 1. Validation feedback.
Page 1 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-026 JPM REVISION: 2 JPM TITLE: Review/Approve Completed Surveillance of RHS Pump (SRO ONLY)
K/A
REFERENCE:
2.2.37 4.6 TASK ID:
1320-011-03-023 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING FAULTED JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom OJT/TPE Other:
Training Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
10 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ ID:
Name/ ID:
Name/ ID:
Name/ ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-026 JPM REVISION: 2 JPM TITLE: Review/Approve Completed Surveillance of RHS Pump (SRO ONLY)
EVALUATOR DIRECTION SHEET TASK STANDARD:
2RHS*P21B is declared inoperable based on unacceptable P and vibrations.
RECOMMENDED STARTING LOCATION:
Classroom DIRECTIONS:
You are to Review/Approve completed Surveillance of RHR Pump 2RHS*P21B to determine operability as defined by the acceptance criteria.
INITIAL CONDITIONS:
- Unit 2 is in Mode 5 for an extended shutdown.
- RCS core exit thermocouple temperatures are 110°F.
- Surveillance 2OST-10.2 Residual Heat Removal Pump
[2RHS*P21B] Performance Test has been completed by the RO and reviewed by the STA. (Comprehensive Test NOT performed)
INITIATING CUE:
- Review/Approve completed Surveillance of RHR Pump 2RHS*P21B to determine operability as defined by the acceptance criteria.
- Document in detail the results of your review in the comments section of the cover page.
REFERENCES:
2OST-10.2, Residual Heat Removal Pump [2RHS*P21B]
Performance Test, Rev. 21 TOOLS:
None HANDOUT:
2OST-10.2, Residual Heat Removal Pump [2RHS*P21B]
Performance Test, Rev. 21, completed With unacceptable P and vibrations data.
Page 3 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-026 JPM REVISION: 2 JPM TITLE: Review/Approve Completed Surveillance of RHS Pump (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Reviews 2OST-10.2, Residual Heat Removal Pump [2RHS*P21B]
Performance Test.
1.1 Consults the Acceptance Criteria for acceptable performance.
COMMENTS:
2.C
[2RHS*P21B], Residual Heat Removal Pump:
Operates within the limits of BVPS IST Program (T.S.5.5.4) as follows: Motor Vibration.
(Data Sheet 1) 2.1 Compares Actual Motor Vibrations on Data Sheet 1 to Acceptable and Alert Range.
2.2C Determines Motor Outboard (1) AND Motor Inboard (2) Axial, Horizontal, and Vertical are GREATER THAN Acceptable and Alert Range.
COMMENTS:
3.C
[2RHS*P21B], Residual Heat Removal Pump:
Operates within the limits of BVPS IST Program (T.S.5.5.4) as follows: Pump Vibration.
(Data Sheet 1) 3.1 Compares Actual Pump Vibrations on Data Sheet 1 to Acceptable and Alert Range.
3.2C Determines Pump Inboard (1) Horizontal is GREATER THAN Acceptable and Alert Range.
COMMENTS:
EVALUATOR CUE: Provide candidate with a marked up copy of 2OST-10.2 containing surveillance results.
Page 4 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-026 JPM REVISION: 2 JPM TITLE: Review/Approve Completed Surveillance of RHS Pump (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 4.C
[2RHS*P21B], Residual Heat Removal Pump:
Operates within the limits of BVPS IST Program (T.S.
5.5.4) as follows: Delta-P (Data Sheet 2) 4.1 Compares calculated Delta P on Data Sheet 2 to Acceptable Range.
4.2C Determines calculated Delta P is LESS THAN Acceptable Range.
COMMENTS:
- 5.
[2RHS*4], Residual Heat Removal Pump 21B Disch Check Vlv, operates within the requirements of BVPS IST Program (T.S. 5.5.4) for forward flow (full-stroke) at a flowrate of 4000 gpm.
(Step VII.B.9).
5.1 Reviews step VII.B.9 of OST to determine if 4000 gpm was achieved.
5.2 Determines step was completed satisfactorily.
COMMENTS:
- 6.
RHR heat exchanger outlet temperature indication conforms with the expected temperature based on current plant conditions.
(Data Sheet 4) 6.1 Compares the Data from Data Sheet 4 to initial conditions of core exit thermocouples of 110°F.
6.2 Determines that these are as expected.
COMMENTS:
EVALUATOR NOTE: Initial conditions stated Comprehensive Test will NOT be performed.
Page 5 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-026 JPM REVISION: 2 JPM TITLE: Review/Approve Completed Surveillance of RHS Pump (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 7.
RHR heat exchanger outlet temperatures and RCS cold leg temperature are within 25ºF of each other.
(Data Sheet 4) 7.1 Compares Data from Data Sheet 4; and, determines that RHR heat exchanger outlet temperatures and RCS cold leg temperature are within 25ºF of each other.
COMMENTS:
8.C Complete the front cover sheet.
8.1 Places a checkmark in the Problems encountered block of cover page.
8.2C Lists the following problems on OST problem sheet:
Motor Outboard (1) AND Inboard (2) Axial, Horizontal, and Vertical vibrations are GREATER THAN Acceptable and Alert Range.
Pump Inboard (1) Horizontal vibrations are GREATER THAN Acceptable and Alert Range.
Calculated Delta P is LESS THAN Acceptable Range.
C Declares 2RHS*P21B INOPERABLE due to any of the above criteria.
COMMENTS:
STOP TIME: ___________________
EXAMINER CUE: State This completes the JPM EVALUATOR CUE: If the SRO does NOT specifically state that 2RHS*P21B is inoperable, then ask the candidate: What is the status of 2RHS*P21B?
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
DIRECTIONS:
You are to Review/Approve completed Surveillance of RHR Pump 2RHS*P21B to determine operability as defined by the acceptance criteria.
INITIAL CONDITIONS:
- Unit 2 is in Mode 5 for an extended shutdown.
- RCS core exit thermocouple temperatures are 110°F.
- Surveillance 2OST-10.2 Residual Heat Removal Pump
[2RHS*P21B] Performance Test has been completed by the RO and reviewed by the STA. (Comprehensive Test NOT performed)
INITIATING CUE:
- Review/Approve completed Surveillance of RHR Pump 2RHS*P21B to determine operability as defined by the acceptance criteria.
- Document in detail the results of your review in the comments section of the cover page.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce " I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Evaluate 1/M Data and Determine Required Actions (SRO Only)
TRAINING MATERIAL NUMBER:
2AD-019 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-019 REVISION NUMBER:
5 TECHNICAL
REFERENCES:
2OM-50.4.D2, Reactor Startup From Mode 3 to Mode 2, Rev 5 2OM-50.4.F, Performing An Estimated Critical Position Calculation, Rev 11 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
30 Minutes PREPARED BY:
A. Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-019 New Revision: 5 Description of Change(s):
- 1. Updated procedures
- 2. Updated initial conditions based on procedure change.
Reason for Change (s):
- 1. Validation feedback.
Page 1 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-019 JPM REVISION: 4 JPM TITLE: Plot and Evaluate 1/M Data and Determine Required Actions (SRO Only)
K/A
REFERENCE:
2.1.43 4.3 TASK ID:
0021-022-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID#:
Time Critical:
Yes Allotted Time:
30 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 4 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Determine that 1/M data predicts >1000 pcm below ECP value for critical rod height. Determines the following actions must be taken:
- Insert all control rods to 0 Steps.
- Verify SDM
- DO NOT recommence S/U without Operations Manager approval.
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
The Unit is in Mode 2.
A reactor startup is in progress, following a reactor trip from full power.
Control Bank C is at 79 steps.
Control Bank D is at 0 steps.
RCS Boron concentration is 1088 ppm.
INITIATING CUE:
Your Supervisor directs you to complete the 1/M plot per 2OM-50.4.F, using the SR count rate data provided on Data Sheet 3.
- Compare the 1/M data with the predicted ECP data and make a recommendation for further rod withdrawal.
- Document your recommendation and any required actions, if applicable, in the box below. (Located on candidate direction sheet).
REFERENCES:
2OM-50.4.F, Performing An Estimated Critical Position Calculation, Rev. 12 2OM-50.4.D2, Reactor Startup From Mode 3 to Mode 2, Rev. 7 TOOLS:
Calculator; Ruler/straight edge.
HANDOUT:
2OM-50.4.F, Performing An Estimated Critical Position Calculation, Rev. 12 with Data sheet 1 completed and Data Sheet 3 partially completed.
2OM-50.4.D2, Reactor Startup From Mode 3 to Mode 2, Rev. 7
Page 3 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-019 JPM REVISION: 4 JPM TITLE: Plot and Evaluate 1/M Data and Determine Required Actions (SRO Only)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Refer to Data sheet 3.
1.1 Refers to data sheet 3 for count rate data.
COMMENTS:
2.C Plots Data Sheet 3 Data on Figure 1.
2.1.C Evaluates count rate data from Data Sheet 3 and plots this data on Figure 1 (1/M Plot) for 230 total steps.
(~70 Steps CB D) 2.2.C Evaluates count rate data from Data Sheet 3 and plots this data on Figure 1 (1/M Plot) for 300 total steps. (~
22 Steps CB D) 2.3.C Evaluates count rate data from Data Sheet 3 and plots this data on Figure 1 (1/M Plot) for 335 total steps.
(~115 Steps CB C)
COMMENTS:
3.C Evaluate 1/M plot data 3.1.C Determines that the 1/M plot predicts criticality >1000 pcm below ECP.
3.2 Minimum rod height is Bank D at 0 steps versus ECP of Bank D 100 steps.
COMMENTS:
EVALUATOR NOTE: See Attached Answer Key for 1/M plot values. It is not necessary to plot both SR curves since the data is identical.
Page 4 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-019 JPM REVISION: 4 JPM TITLE: Plot and Evaluate 1/M Data and Determine Required Actions (SRO Only)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 4.C Determines action for continued startup IAW 2OM-50.4.D2 Attachment 1 Precaution and Limitation #9 or Attachment 3 Action 6.
4.1.C Determines that 1/M data indicates that criticality will occur >1000 pcm below the ECP.
4.2.C Immediately insert ALL control banks to ZERO steps.
4.3.C Verify RCS boron concentration.
4.4.C Perform 2OST-49.2, Shutdown Margin Calculation (Plant Shutdown).
4.5.
Notify the Operations Manager or designee.
4.6.
Notify Reactor Engineering to evaluate the initial ECP and all applicable calculation data.
4.7 Recalculate the ECP.
4.8 Subsequent reactor startup is NOT permitted without Operations Manager permission.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: If necessary ask candidate to provide specific actions required.
EVALUATOR CUE: State This JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The unit is in Mode 2.
A reactor startup is in progress, following a reactor trip from full power.
Control Bank C is at 79 steps.
Control Bank D is at 0 steps.
RCS Boron concentration is 1088 ppm.
INITIATING CUE:
Your Supervisor directs you to complete the 1/M plot per 2OM-50.4.F, using the SR count rate data provided on Data Sheet 3.
- Compare the 1/M data with the predicted ECP data and make a recommendation for further rod withdrawal.
- Document your recommendation and any additional required actions, if applicable, in the box below. (Located on candidate direction sheet).
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
RECOMMENDED ACTIONS:
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Review Shutdown Margin Calculation (Temperature Correction)
(SRO ONLY)
TRAINING MATERIAL NUMBER:
2AD-061 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-061 REVISION NUMBER:
0 TECHNICAL
REFERENCES:
2OST-49.1, Shutdown Margin Calculation (Plant Critical), Rev. 28 Unit 2 Curve Book Cycle 23 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
25 Minutes PREPARED BY:
A. Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-061 New Revision: 0 Description of Change(s):
- 1.
Reason for Change (s):
- 1.
Page 1 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
K/A
REFERENCE:
2.1.25 4.2 TASK ID:
0061-201-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID :
Time Critical:
Yes Allotted Time:
25 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ ID:
Name/ID:
Name/ ID:
Name/ ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 8 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Incorrect values for Inoperable Temperature Defect, Total Bank Worth, Power Defect, and SDM are identified and corrected. (See Answer Key for specific values)
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
The Unit is in Mode 1, 100% power. All rods out.
- Current burnup is 16,000 MWD/MTU.
- Computer Point T0496A (Tref) indicates 573°F.
- Computer Point T0499A (Median Tavg) indicates 574°F.
The RO has completed 2OST-49.1, Shutdown Margin Calculation (Plant Critical), and has requested the Shift Manager to review the completed OST.
INITIATING CUE:
- As Shift Manager, review the completed Shutdown Margin Calculation, 2OST-49.1.
- During the review, apply any discrepancies that are identified.
- Document the results of your review in the appropriate section of the OST.
REFERENCES:
2OST-49.1, Shutdown Margin Calculation (Plant Critical), Rev. 28 Unit 2 Curve Book Cycle 23 TOOLS:
Calculator HANDOUT:
Unit 2 Curve Book Cycle 23 2OST-49.1, Shutdown Margin Calculation (Plant Critical) (Updated for Cycle 23), Rev. 28 Filled out with the following errors on Data Sheet 1:
0.03 %k/k for Temperature Defect instead of 0.0 %k/k 7.622 %k/k for ARO Total Bank Worth instead of 6.890 %k/k 2900 PCM for power defect instead of 2360 PCM 2.972 %k/k for SDM instead of 2.883 %k/k
Page 3 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
1.C If the plant is in Mode 1, Verify that Tavg is less than 3°F above Tref (Annunciator A4-3C, TAVG DEVIATION FROM TREF is OFF)
(Otherwise N/A).
(Step VII.A.1) 1.1 Verifies Step VII.A.1, (Plant in Mode 1, Tavg < 3°F above Tref from Initial Conditions.
1.2 Verifies Step VII.A.1.c by determining MTC value in 2CB-4C is -30 pcm/°F 1.3C Determines Temperature Defect is 0.03% k/k due to T > +0.5 °F (MTC at 16000 MWD/MTU per 2CB-4C is -30 pcm/°F.)
1.4C Corrects Data Sheet 1 Step A.1 COMMENTS:
- 2.
If the plant is in Mode 2, Verify that Tavg is less than 8°F above Program Tavg as follows: (Otherwise N/A)
(Step VII.A.2) 2.1 Verifies Step VII.A.2 is N/A, (Plant not in Mode 2).
COMMENTS:
EVALUATOR NOTE: Some judgment may be required to determine satisfactory performance on this JPM. Reasonable rounding or truncating of numbers is acceptable and may lead to a slight difference in final SDM calculation.
EVALUATOR CUE: If the candidate hands in the OST after ONLY finding the first error, provide the following cue:
Make any necessary corrections and complete the SDM calculation.
Page 4 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 3.
Request Chemistry to determine current RCS Boron concentration in ppm.
(Step VII.A.3) 3.1 Verifies current boron concentration is 290 ppm from initial conditions.
COMMENTS:
- 4.
Record the number of steps withdrawn for Control Bank D from the group demand counters, (BB-B) on Data Sheet 1.
(Step VII.A.4) 4.1 Verifies Control Bank D as 226 steps withdrawn on Data Sheet 1 (Block A.4) from initial conditions.
COMMENTS:
- 5.
Record the current reactor power level in percent of full power from [2NME-NR45],
Power Range Recorder, (VB-B) OR PCS computer point U1150, 1MIN AVG PWR RNG NUCLEAR FLUX, on Data Sheet 1.
(Step VII.A.5) 5.1 Verifies reactor power as 100% on Data Sheet 1.
COMMENTS:
- 6.
Record the number of inoperable (untrippable) OR dropped control rods on Data Sheet 1.
(Step VII.A.6) 6.1 Verifies number of immovable or untrippable rods as None on Data sheet 1.
COMMENTS:
- 7.
If the number of inoperable (untrippable) OR dropped control Rods is greater than 1, Use Attachment 1 to determine the required boron concentration with greater than one struck rod and Record below. (Otherwise N/A)
(Step VII.A.7) 7.1 Verifies Step VII.A.7 is N/A.
COMMENTS:
Page 5 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 9.C Determine control bank reactivity worth per the following:
Using the ARO Total Bank Worth table on Data Sheet 1, Enter the total bank worth for the current core burnup range, in the space provided on Data Sheet 1.
(Step VII.B.1.a) 9.1C Identifies ARO Total Bank Worth incorrectly documented as 6.890 %k/k and corrects to 7.622
%k/k on Data Sheet 1 (Block B.1.a).
COMMENTS:
- 10.
Using Curve Book Figures CB24A, 24B OR 24C, Determine integral rod worth for the current bank position AND Enter this value on Data Sheet 1.
Divide value from curve (in pcm) by 1000 to convert to
%k/k AND Record on Data Sheet 1.
(Step VII.B.1.b) 10.1 Verifies integral rod worth to be ZERO and recorded on Data Sheet 1 (Blocks B.1.b.1) and B.1.b).
COMMENTS:
- 11.
Subtract the integral rod worth from the Total Bank Worth AND Enter the result on Data Sheet 1.
(Step VII.B.1.c) 11.1 Verifies TBW-IRW is 7.622 %k/k and recorded on Data Sheet 1 (Block B.1.c).
COMMENTS:
- 12.
Multiply this result by 0.9 to apply a 10% uncertainty AND Enter the result on Data Sheet 1.
(Step VII.B.1.d) 12.1 Verifies 90% of TBW to be 6.8598 %k/k and recorded on Data Sheet 1 (Block B.1.d).
COMMENTS:
Page 6 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 13.C If ONE rod is inoperable (untrippable) OR dropped, Record Worst Case Rod with Inoperable Rod worth on Data Sheet 1. Value is determined from Column B on Attachment 2 for the appropriate Cycle Burnup.
(Step VII.B.2.b) 13.1C Verifies that no rods are inoperable or untrippable and verifies Worst Case Rod worth (0.958% k/k) on Data Sheet 1.
COMMENTS:
14.C Subtrack Stuck Rod(s) worth from 90% Total Bank Worth value AND Enter the result on Data Sheet 1 14.1C Subtracts 0.958 from 6.8598 and records 5.9018 on Data Sheet 1.
COMMENTS:
- 15.
Determine Power Defect as follows:
Record RCS Boron Concentration results from Chemistry on Data Sheet 1.
(Step VII.B.4.a) 15.1 Verifies RCS Boron Concentration of 290 ppm on Data Sheet 1 (Block B.4.a).
COMMENTS:
- 16.
Using Curve Book Figure 29, Determine the B-10 Correction Factor for the present Burnup (If between two Burnup values, Use the B-10 Correction Factor for the greater MWD/MTU Burnup entry) AND Record on Data Sheet 1.
(Step VII.B.4.b) 16.1 Verifies B-10 Correction Factor to be 0.863 and recorded on Data Sheet 1 (Block B.4.b).
COMMENTS:
Page 7 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 17.
Determine Corrected Boron Concentration by multiplying the RCS Boron Concentration and the B-10 Correction Factor AND Record on Data Sheet 1.
(Step VII.B.4.c) 17.1 Verifies recorded Corrected Boron Concentration on Data Sheet 1 is 250 ppm. (Block B.4.c).
[290 X 0.863 = 250]
COMMENTS:
18.C Using Curve Book Figure 21, Determine the ABSOLUTE VALUE of the Power Defect for the current power level and the Corrected Boron Concentration AND Enter this value on Data Sheet 1.
(Step VII.B.4.d) 18.1C Determines ABSOLUTE VALUE of the Power Defect to be 2900 pcm NOT 2360 pcm and records on Data Sheet 1 (Block B.4.d).
COMMENTS:
19.C Divide value from curve (in pcm) by 1000 to convert to
%k/k AND Record on Data Sheet 1.
(Step VII.B.4.e) 19.1C Converts ABSOLUTE VALUE of the Power Defect of 2900 pcm to 2.90 %k/k and records on Data Sheet 1 (Block B.4.e).
COMMENTS:
Page 8 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-061 JPM REVISION: 0 JPM TITLE: Review Shutdown Margin Calculation (At Power) (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 20.C Add 0.150% k/k for operating temperature band margin to the Power Defect recorded in Step VII.B.4.e AND record on Data Sheet 1.
(Step VII.B.4.f) 20.1C Determines Power Defect plus operating temperature band margin to be 2.93 % k/k NOT 2.36 % k/k and records on Data Sheet 1 (Block B.4.f).
[2.9 + 0.03 = 2.93]
COMMENTS:
21.C Determine SHUTDOWN MARGIN by subtracting Power Defect (Step (Step VII.B.4.f) from the value determined in Step B.3 AND Record on Data Sheet 1.
(Step VII.B.5) 21.1C Determines SDM to be 2.9718 % (+/- 0.100) k/k NOT 2.883 % k/k, and records on Data Sheet 1 (Block B.5)
[5.9018 - 2.93 = 2.9718]
21.2C Compares corrected calculated SDM to Tech Spec and Core Operating Limits Report requirement of 1.77% K/K and determines that it is acceptable.
21.3 Records errors on OST cover sheet and Data Sheet 1.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: When the candidate hands in the OST cover sheet, the evaluation for this JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The Unit is in Mode 1, 100% power. All rods out.
- Current burnup is 16,000 MWD/MTU.
- Computer Point T0496A (Tref) indicates 573°F.
- Computer Point T0499A (Median Tavg) indicates 574°F.
The RO has completed 2OST-49.1, Shutdown Margin Calculation (Plant Critical), and has requested the Shift Manager to review the completed OST.
INITIATING CUE:
- As Shift Manager, review the completed Shutdown Margin Calculation, 2OST-49.1.
- During the review, apply any discrepancies that are identified.
- Document the results of your review in the appropriate section of the OST.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Determine Compensatory Actions for 2GWS-P21 and 2GWS-OA-100A Being OOS. (SRO ONLY)
TRAINING MATERIAL NUMBER:
2AD-042 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-042 REVISION NUMBER:
4 TECHNICAL
REFERENCES:
LRM 3.3.12, Rev. 52 1/2 ODCM Section 3.0.3, Rev. 18 OM Fig. 19-3 (RM-0419-003 rev 4)
INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
20 Minutes PREPARED BY:
M. Klingensmith Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-042 New Revision: 4 Description of Change(s):
- 1. Updated to latest revision the ODCM.
Reason for Change (s):
- 1. 1/2 ODCM Section 3.0.3 was revised to revision 18.
Page 1 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-042 JPM REVISION: 4 JPM TITLE: Determine Compensatory Actions for 2GWS-P21 and 2GWS-OA-100A Being OOS. (SRO ONLY)
K/A
REFERENCE:
2.3.11 4.3 TASK ID:
1300-029-03-023 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ ID:
Name/ID:
Name/ ID:
Name/ ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 4 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
The compensatory actions required are determined to be:
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> take grab samples and analyze for Oxygen concentration AND, least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, verify that the GW storage tanks contain less or equal to 19,000 curies.
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
It is desired to fill the Gaseous Waste Storage Tanks in accordance with 2OM-19.4.G, Filling Unit 2 Gaseous Waste Storage Tanks from Unit 2 Surge Tank.
- The plant is operating at 100% power with all system in NSA.
- Gaseous Waste Storage Tanks (2GWS-TK25A-G) pressures are 8 psig and STABLE.
- Gaseous Waste Surge Tank (2GWS-TK21) pressure is 62 psig and slowly RISING.
- The Gaseous Waste Storage Tanks Recirculation Pump
[2GWS-P21] is out of service (OOS).
- Oxygen Analyzer (2GWS-OA100A) is also OOS.
- Oxygen Analyzer (2GWS-OA100B) is OPERABLE.
INITIATING CUE:
For these plant conditions, determine the REQUIRED LRM/ODCM compensatory actions for filling the Gaseous Waste Storage Tanks.
- Document any compensatory actions in the block below (provided on the candidate direction sheet).
REFERENCES:
LRM 3.3.12, Rev. 52 1/2 ODCM Section 3.0.3, Rev. 18 OM Fig. 19-3 (RM-0419-003) Rev. 4 TS 5.5.8, Amend 278/170 2OM-19.4.G Rev 4 TOOLS:
None HANDOUT:
2OM-19.5, Figure 19-1 & 3 (RM-041-001 rev 8, and 003 rev 4)
Unit 2 LRM 1/2-ODCM Section 3.0.3 Rev 18 2OM-19.4.G Rev 4
Page 3 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-042 JPM REVISION: 4 JPM TITLE: Determine Compensatory Actions for 2GWS-P21 and 2GWS-OA-100A Being OOS. (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Refer to Data sheet 3.
1.1 Refers to OM Fig. 19-3 and determines that Waste Gas Storage Tank Radiation Monitor (2GWS-RQ104) is out of service as a result of 2GWS-P21 being OOS.
COMMENTS:
2.C Determines 1/2 ODCM compensatory actions for Waste Gas Storage Tank Radiation Monitor (2GWS-RQ104) being out of service.
2.1.
Refers to 1/2 ODCM Section 3.0.3, Att. O item 4.11.2.5.1 on page 67.
2.2C Determines that it will be required to verify, least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, that the GW storage tanks contain less or equal to 19,000 curies. (when adding radioactive materials to the tank)
COMMENTS:
EVALUATOR CUE: Provide the Candidate with the Candidate Direction Sheet and a current copy of OM 19 Figs., LRM, AND 1/2 ODCM Section 3.0.3.
EVALUATOR NOTE: These steps may be performed in any order.
EVALUATOR NOTE: The candidate may already be familiar enough with the system to know the impact of 2GWS-P21 being OOS.
Page 4 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-042 JPM REVISION: 4 JPM TITLE: Determine Compensatory Actions for 2GWS-P21 and 2GWS-OA-100A Being OOS. (SRO ONLY)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Determines LRM compensatory actions for Oxygen Analyzer (2GWS-OA100A) being OOS.
3.1 Refers to LRM 3.3.12 Condition B.1 3.2C Determines at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> take grab samples and analyze for oxygen content.
3.3 Refers to LRM 3.3.12 Condition B.2 3.4 Restore the inoperable channel to OPERABLE status in 30 days.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: State This complete the JPM.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
It is desired to fill the Gaseous Waste Storage Tanks in accordance with 2OM-19.4.G, Filling Unit 2 Gaseous Waste Storage Tanks from Unit 2 Surge Tank.
- The plant is operating at 100% power with all system in NSA.
- Gaseous Waste Storage Tanks (2GWS-TK25A-G) pressures are 8 psig and STABLE.
- Gaseous Waste Surge Tank (2GWS-TK21) pressure is 62 psig and slowly RISING.
- The Gaseous Waste Storage Tanks Recirculation Pump
[2GWS-P21] is out of service (OOS).
- Oxygen Analyzer (2GWS-OA100A) is also OOS.
- Oxygen Analyzer (2GWS-OA100B) is OPERABLE.
INITIATING CUE:
For these plant conditions, determine the REQUIRED LRM/ODCM compensatory actions for filling the Gaseous Waste Storage Tanks.
- Document any compensatory actions in the block below (provided on the candidate direction sheet).
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
NAME:____________________
RECOMMENDED ACTIONS:
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Determine Protective Action Recommendations (Part 1) (SRO Only)
TRAINING MATERIAL NUMBER:
2AD-037 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2AD-037 REVISION NUMBER:
5 TECHNICAL
REFERENCES:
1/2-EPP-IP-4.1, Offsite Protective Actions, Rev. 35 1/2-EPP-IP-1.1.F01 FENOC NUCLEAR POWER PLANT INITIAL NOTIFICATION FORM, Rev. 12 11/2-EPP-I-5 General Emergency, Rev 48 INSTRUCTIONAL SETTING:
Classroom APPROXIMATE DURATION:
<15 Minutes PREPARED BY:
M. Klingensmith Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2AD-037 New Revision: 5 Description of Change(s):
- 1. Updated for procedure revisions.
- 2. Adjusted Offsite Does values per prior NRC exam feedback Reason for Change (s):
- 1. 1/2-EPP-IP-1.1. F01 was revised to rev 12.
- 2. 1/2-EPP-IP-5 was revised to rev 48.
- 3. 1/2-EPP-IP-4.1 was revised to rev 35.
- 4. Adjusted Offsite Doses to lower values.
Page 1 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-037 JPM REVISION: 5 JPM TITLE: Determine Protective Action Recommendations (Part 1)
(SRO Only)
K/A
REFERENCE:
2.4.44 4.4 TASK ID:
1350-007-03-023 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
15 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 5 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Determine Protective Action Recommendations in accordance with 1/2-EPP-IP-4.1.
RECOMMENDED STARTING LOCATION:
Classroom INITIAL CONDITIONS:
A General Emergency has been declared at Unit 2 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> following a small break LOCA and the loss of all 4KV emergency power on EAL SG1.1. A Core Cooling Red condition exists.
The General Emergency was declared due to a Prolonged Loss of all OFFSITE and ONSITE AC power to Emergency Busses (SG1.1).
Unit 1 remains operating at 100% power.
The following plant conditions exist:
- 35 wind direction is from 95° at 4 MPH.
- 150 wind direction is from 95° at 11 MPH.
- 500 wind direction is from 135° at 15 MPH.
- NO radioactive release has occurred or is imminent (within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />).
- The Containment Fission Product Barrier EAL is NOT challenged (no Loss or Potential Loss)
- There is NO Hostile Action event in progress.
- Offsite agencies have NOT identified any impediments to evacuation.
- Health Physics has provided the following dose projections:
At the EAB:
.001 REM TEDE;.0001 REM CDE At 2 miles:
.00013 REM TEDE;.0004 REM CDE At 5 miles:
.00004 REM TEDE;.00021 REM CDE INITIATING CUE:
You are the Emergency Director and the TSC/EOF has NOT yet been activated. You are to evaluate the above conditions and determine which, if any, offsite Protective Action Recommendations (PAR) are necessary. Complete 1/2-EPP-IP-1.1.F01 Nuclear Power Plant Initial Notification Form. The evaluator will peer check the form.
This JPM is TIME CRITICAL.
REFERENCES:
1/2-EPP-IP-4.1, Offsite Protective Actions, Rev. 35 1/2-EPP-IP-1.1.F01 Rev. 12 1/2-EPP-I-5 Rev 48 TOOLS:
None HANDOUT:
1/2-EPP-IP-4.1, Offsite Protective Actions, Rev. 35 1/2-EPP-IP-1.1.F01 Rev. 12 1/2-EPP-I-5 Rev 48 EAL Flow Chart
Page 3 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-037 JPM REVISION: 5 JPM TITLE:
Determine Protective Action Recommendations (Part 1)
(SRO Only)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Locate Offsite Protective Action Recommendation Flowchart.
1.1 Refers to 1/2-EPP-IP-4.1, Attachment A, Part 1 Offsite Protective Action Recommendation Flowchart.
COMMENTS:
- 2.
Determine offsite protective action.
2.1 Navigates PAR flowchart as follows:
- General Emergency already declared ()
- Containment FPB is NOT a Loss or Potential Loss. ()
- No Hostile Action or No impediment to evacuation. ()
- Projected Dose at 5 Miles is less than limits. ()
- Met data provided in Initial Conditions ()
COMMENTS:
Page 4 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-037 JPM REVISION: 5 JPM TITLE:
Determine Protective Action Recommendations (Part 1)
(SRO Only)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Determine Offsite Protective Action Recommendations.
3.1.C Determines and documents on 1/2-EPP-IP-1.1.F01, the following PARs:
- Evacuate 2 Mile Radius, and
- Evacuate 5 Miles downwind wedge
- All others monitor and prepare
- Advise the general public to administer KI per state plan COMMENTS:
4.C Determine downwind wedge per Attachment A.
4.1 Determines that the 150 elevation downwind sectors are LMNPQ.
4.2.C Documents the sectors of LMNPQ on the form.
COMMENTS:
EVALUATOR CUE: If necessary, direct the Candidate to perform the downwind wedge determination as part of the PAR.
Page 5 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2AD-037 JPM REVISION: 5 JPM TITLE:
Determine Protective Action Recommendations (Part 1)
(SRO Only)
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 5.C Completes the PAR within 15 minutes.
5.1.C The form is completed within 15 minutes of the start time.
5.2 Confirm the start and stop times are within 15 minutes.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: When the candidate completes the Protective Action Recommendation, the evaluation for this JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
A General Emergency has been declared at Unit 2 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> following a small break LOCA and the loss of all 4KV emergency power on EAL SG1.1. A Core Cooling Red condition exists.
The General Emergency was declared due to a Prolonged Loss of all OFFSITE and ONSITE AC power to Emergency Busses (SG1.1).
Unit 1 remains operating at 100% power.
The following plant conditions exist:
- 35 wind direction is from 95° at 4 MPH.
- 150 wind direction is from 95° at 11 MPH.
- 500 wind direction is from 135° at 15 MPH.
- NO radioactive release has occurred or is imminent (within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />).
- The Containment Fission Product Barrier EAL is NOT challenged (no Loss or Potential Loss)
- There is NO Hostile Action event in progress.
- Offsite agencies have NOT identified any impediments to evacuation.
- Health Physics has provided the following dose projections:
At the EAB:
.001 REM TEDE;.0001 REM CDE At 2 miles:
.00013 REM TEDE;.0004 REM CDE At 5 miles:
.00004 REM TEDE;.00021 REM CDE INITIATING CUE:
You are the Emergency Director and the TSC/EOF has NOT yet been activated. You are to evaluate the above conditions and determine which, if any, offsite Protective Action Recommendations (PAR) are necessary. Complete 1/2-EPP-IP-1.1.F01 Nuclear Power Plant Initial Notification Form. The evaluator will peer check the form.
This JPM is TIME CRITICAL.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
RCS Dilution TRAINING MATERIAL NUMBER:
2CR-589 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-589 REVISION NUMBER:
6 TECHNICAL
REFERENCES:
2OM-7.4.AR, Blender Operation in Mode 1, Revision 13 INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
15 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-589 New Revision: 6 Description of Change(s):
- 1. Updated for current JPM format and procedure revision.
- 2. Updated task ID.
- 3.
- 4.
Reason for Change (s):
- 2. Task ID changed.
- 3.
- 4.
Page 1 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution K/A
REFERENCE:
004 A4.07 3.9/3.7 004 A2.25 3.8/4.3 TASK ID:
0071-202-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID#:
Time Critical:
Yes Allotted Time:
15 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 8 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Initiate RCS Dilution and stop the dilution after the blender fails to automatically stop prior to exceeding 147 gallons indicated on 2CHS-FQIS168. (122 gal. + 25 gal.)
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
- The plant is 100% power, with all systems in NSA.
- The Control Rods are fully withdrawn.
- Tavg is 1°F below Tref.
- IAW the current reactivity placard, 122 gallons of dilution water will be needed to raise Tavg 1°F.
INITIATING CUE:
Your supervisor directs you to dilute the RCS 122 gallons in accordance with 2OM-7.4.AR, Blender Operation in Mode 1, at a rate of 75 gpm to raise Tavg 1°F. All procedure required initial conditions are satisfied. It is NOT desired to take manual control of VCT Level and Pressure.
REFERENCES:
2OM-7.4.AR, Blender Operation in Mode 1, Revision 13 Reactivity Plan for cycle 20 BOL (122 gals/°F)
TOOLS:
None HANDOUT:
2OM-7.4.AR, Blender Operation in Mode 1, Revision 13
Page 3 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
At the discretion of the RO and SM/US, take control of VCT Level and Pressure.
1.1 N/A - Initiating cue stated it is NOT desired to take manual control of VCT level and pressure.
COMMENTS:
- 2.
If letdown flow to a degasifier will exceed 75 gpm, perform either of the following.
Reduce letdown flow OR Align degasifiers to receive maximum letdown.
2.1 N/A - Letdown flow to a degasifier will NOT exceed 75 gpm.
COMMENTS:
SIMULATOR SETUP:
Initialize to a 100% power IC.
Reduce Tavg ~°1 F below Tref.
Fail blender auto stop on totalizer timeout by:
OVERRIDE DI Point XA4I028L (2CHSFQIS168 -
Total M/U from Blender Flow Batch Limit) in OFF.
Adjust 2CHS*FCV114A pot setting to 568 units EVALUATOR CUE: Provide candidate with a copy of 2OM-7.4.AR, Blender Operation in Mode 1.
After candidate reviews procedure and is ready to begin JPM, PLACE the simulator in RUN. This JPM may be pre-briefed to expedite the procedure review.
EVALUATOR CUE: IF necessary, remind the candidate to refer to initiating cue.
Page 4 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Place the Boric Acid Makeup Blender Control Switch in Stop.
3.1C Places Boric Acid Blender Makeup Control Switch to STOP.
3.2 Verifies GREEN light - LIT, RED light - NOT LIT.
COMMENTS:
4.C Set 2CHS*FCV114A to desired flow rate.
4.1C Adjusts 2CHS*FCV114A pot setting to 468 units based on the following formula:
68
.4 16 75
=
gpm gpm COMMENTS:
5.C Set 2CHS-FQIS168 Total Makeup From Blender Flow Totalizer.
5.1C Adjusts 2CHS-FQIS168 to 122 (Green LED).
5.2C Depresses 2CHS-FQIS168 RESET PB.
5.3 Verifies 2CHS-FQIS168 is reading ZERO (Red LED).
COMMENTS:
EVALUATOR NOTE: Pot should be set at 468 units +/-2 units.
EVALUATOR NOTE: Evaluator discretion may be required for setting totalizer based on operator performing multiple batches.
Page 5 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 6.
Ensure 2CHS-FQIS113, Boric Acid Flow To Blender Flow Totalizer is set to zero.
6.1 Verifies that 2CHS-FQIS113, Boric Acid Flow To Blender is set to ZERO (Red and Green LED).
COMMENTS:
- 7.
Verify at least one reactor coolant pump is in operation to supply 3000 gpm flow through the core AND document in the Narrative Log. (LRS 3.1.10.1).
7.1 Verifies at least one Reactor Coolant Pump is in operation and ensures a log entry is made.
COMMENTS:
8.C Place the Mode Selector Switch in the DILUTE or ALTERNATE DILUTE position.
8.1C Places the Mode Selector switch in DILUTE.
COMMENTS:
EVALUATOR CUE: Role play US and acknowledge Narrative Log entry for coolant pump in operation supplying 3000 gpm flow through the core.
EVALUATOR CUE: If necessary, cue the candidate to DILUTE as opposed to ALTERNATE DILUTE.
Page 6 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 9.C Place the Boric Acid Makeup Blender Control Switch to START.
9.1C Places Boric Acid Blender Makeup Control Switch to START.
9.2 Verifies RED light - LIT, GREEN light - NOT LIT.
COMMENTS:
- 10.
Verify 2CHS*FCV114B Opens.
Verify correct flow rate on 2CHS-FR113.
10.1 Verifies 2CHS*FCV114B Opens.
10.2 Verifies RED light - LIT, GREEN light - NOT LIT.
10.3 Verifies 2CHS-FR113 is reading ~ 75 gpm.
COMMENTS:
Page 7 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 11.
IF large amount of PG water is necessary or dilutions wll be frequent THEN:
Operate pressurizer heaters to equalize boron concentration.
Verify at least one RCP in operation at least once per hour during dilution and document in narrative log.
11.1 As appropriate, places control switch for 2RCS*H2A or E to ON.
11.2 Verifies RED light - LIT, GREEN light - NOT LIT.
11.3 Checks at least one RCP in operation and notes this must be done at least once per hour.
11.4 Candidate indicates this check must be logged in the Narrative Log.
COMMENTS:
EVALUATOR NOTE: Candidate may energize additional backup heaters, unless current operating cycle has all heaters energized.
EVALUATOR CUE: If requested, another operator will make the appropriate log entry. Candidate may N/A the RCP in operation, and the log entry due to this being a single dilution.
FAULT STATEMENT Blender will not Auto-Stop. Candidate is expected to manually secure dilution within 25 gallons of directed volume.
Page 8 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-589 JPM REVISION: 6 JPM TITLE: RCS Dilution STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 12.C Verify dilution automatically stops when totalizer, 2CHS-FQIS168 reaches the preset value.
12.1 Candidate determines dilution automatic stop has failed after integrator reaches 122 +25.
12.2C Places Boric Acid Blender Makeup Control Switch to STOP prior to 2CHS-FQIS168 indicating > 147 (RED LED).
12.3 Verifies GREEN light - LIT, RED light - NOT LIT.
12.4 Verifies 2CHS-FR113 is reading ZERO gpm.
COMMENTS:
- 13.
Candidate reports blender problem.
13.1 Reports that the blender auto stop has failed resulting in more dilution than originally planned.
COMMENTS:
STOP TIME: ___________________
TERMINATING CUE: That completes this JPM.
EVALUATOR CUE: Role-play Unit Supervisor and acknowledge the report
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
- The plant is 100% power, with all systems in NSA.
- The Control Rods are fully withdrawn.
- Tavg is 1°F below Tref.
- IAW the current reactivity placard, 122 gallons of dilution water will be needed to raise Tavg 1°F.
INITIATING CUE:
Your supervisor directs you to dilute the RCS 122 gallons in accordance with 2OM-7.4.AR, Blender Operation in Mode 1, at a rate of 75 gpm to raise Tavg 1°F. All procedure required initial conditions are satisfied. It is NOT desired to take manual control of VCT Level and Pressure.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Response to Safety Injection in ECA-0.1 TRAINING MATERIAL NUMBER:
2CR-802 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-802 REVISION NUMBER:
0 TECHNICAL
REFERENCES:
2OM-53A.1.ECA-0.1 (ISS3) Rev. 0, Loss of All AC Power Recovery Without SI Required.
2OM-53A.1.ECA-0.2 (ISS3) Rev. 0, Loss of All AC Power Recovery With SI Required.
2OM-53A.1.A-0.12 Rev. 0, SI Checklist for Verification of Alignment - ECA-0.2.
INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
25 Minutes PREPARED BY:
Andrew Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-802 New Revision: 0 Description of Change(s):
Reason for Change (s):
Page 1 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 K/A
REFERENCE:
006 A.2.02 3.9/4.3 006 A.3.06 3.9/4.2 TASK ID:
0011-204-01-012 0531-201-05-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID #:
Time Critical:
Yes Allotted Time:
25 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 12 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Actuates or recognizes actuation of Safety Injection, transitions to ECA-0.2, and repositions misaligned SI components in accordance with A-0.12.
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
- The plant tripped due to a loss of offsite power, both EDGs failed to automatically start.
- While evaluating selection of the cross-tie path, both EDGs were able to be started locally, the crew progressed thru ECA-0.0 and transitioned to ECA-0.1, Loss of All AC Power Recovery Without SI Required.
INITIATING CUE:
Continue recovery efforts to stabilize the plant in accordance with ECA-0.1, Step 1.
REFERENCES:
2OM-53A.1.ECA-0.1 (ISS3) Rev. 0, Loss of All AC Power Recovery Without SI Required 2OM-53A.1.ECA-0.2 (ISS3) Rev. 0, Loss of All AC Power Recovery With SI Required.
2OM-53A.1.A-0.12 Rev. 0, SI Checklist for Verification of Alignment -
ECA-0.2 TOOLS:
HANDOUT:
2OM-53A.1.ECA-0.1 (ISS3) Rev. 0, Loss of All AC Power Recovery Without SI Required.
Hand out after candidate identifies procedure transition required:
2OM-53A.1.ECA-0.2 (ISS3) Rev. 0, Loss of All AC Power Recovery With SI Required.
2OM-53A.1.A-0.12, SI Checklist for Verification of Alignment - ECA-0.2
Page 3 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U Initial Conditions:
Initiate IC 165 - ECA-0.1 Scenario with both Diesels running and no plant loads in PTL.
Place Blender in a position other than automatic - DILUTE or BORATE Delete malfunction PPL07B on event 2 Delete malfunction VLV-CHS016 on event 9 Delete malfunction VLV-MSC020 on event 10 Delete malfunction VLV-MSC022 on event 10 Delete malfunction VLV-MSC026 on event 11 Delete malfunction VLV-MSC027 on event 11 Delete malfunction VLV-CSS006 on event 13 Delete malfunction VLV-CSS007 on event 14 SBLOCA 1500 GPM on A or B Charging Pump Start
- ENSURE SCHEDULE FILE IS RUN WHILE PERFORMING JPM**
START TIME: ___________________
- 1.
Reviews procedure.
1.1 Reviews ECA-0.1 COMMENTS:
EVALUATOR NOTE: Provide the Candidate with a copy of 2OM-53A.1.ECA-0.1.
Page 4 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 2.
Check RCP Seal Isolation Status
- a. CCP Pumps - All Stopped
- b. [2CCP*AOV107A, B, C]
RCP Thermal Barrier CCP Return Isolation Valves -
CLOSED.
- c. Charging Pumps - ALL STOPPED
- d. RCP Seal injection Throttle valves closed.
2.1 Checks A CCP Pump Running.
RED Light LIT, WHITE Light NOT LIT, Ammeter indicates normal amperage.
2.2 Checks no Charging Pumps running Both pumps; WHITE Lights LIT, RED Lights NOT LIT.
2.3 Directs a field operator to locally close 2CHS*178, 179 and 180.
COMMENTS:
- 3.
Reset CIA and CIB 3.1 Depresses Train A and Train B CIA RESET pushbuttons.
3.3 Depresses Train A and Train B CIB RESET pushbutton.
COMMENTS:
- 4.
Check Station Instrument Air Header Pressure - Greater than 90 PSIG 4.1 Determines Station Instrument Air Header Pressure
>90 PSIG by checking 2IAS-PI106.
COMMENTS:
EVALUATOR CUE: Report as SRO that a field operator was previously dispatched and confirmation has been received that 2CHS*178, 179 & 180 are closed.
Page 5 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 5.
Manually Load Following Equipment on AC Emergency Bus:
- a. Cross-connect station instrument air with CNMT instrument air by opening the following valves:
- [2IAC-MOV131]
- [2IAC-MOV130]
- b. Check CCP Pumps
- ALL STOPPED
- c. Check Charging Pumps - ALL STOPPED
- d. Check pump suction alignment
- 2CHS*LCV115C, E OPEN-VCT M/U system set for automatic control at >
5.1 Checks 2IAC-MOV130 OPEN.
Verifies RED light LIT GREEN light NOT LIT 5.2 Checks 2IAC-MOV131 OPEN.
Valves is DEENERGIZED, Verifies OPEN by checking switch in OPEN position.
5.3 Checks A CCP Pump running.
RED light LIT WHITE light NOT LIT Ammeter indicating normal amperage.
5.4 Checks all charging pumps STOPPED.
WHITE lights LIT RED lights NOT LIT 5.5 Checks 2CHS-LCV115C, E OPEN.
RED lights LIT GREEN lights NOT LIT 5.6 Determines Automatic makeup is unavailable due to Blender integrators being de-energized and the 1MU switch indicates GREEN light LIT.
COMMENTS:
EVALUATOR NOTE: The blender controls are dark due to loss of normal AC power, the candidate may attempt to place the 1MU switch to start, however it will not actuate, the candidate should perform RNO actions to ensure suction alignment by opening 2CHS*LCV115B, D and closing 2CHS*LCV115C, E.
Fault Statement 90 seconds after starting a charging pump a 1500 gpm LOCA will occur requiring a transition to ECA-0.2.
Page 6 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 5.
Manually Load Following Equipment on AC Emergency Bus: (continued)
- e. Check Charging pump discharge alignment.
- 2CHS*FCV122 CLOSED
- 2SIS*MOV867A,BC,D CLOSED.
- f. Check 2CHS-TI116 Volume Control Tank Temp
- Less than 235F
- g. Start one Charging Pump.
- h. Start CNMT Air Recirculation Fans, as necessary.
5.7 OPENS 2CHS*LCV115B and D by placing control switch in OPEN position.
RED light LIT GREEN light NOT LIT 5.8 CLOSES 2CHS*LCV115C and E by placing control switch in CLOSE position.
GREEN light LIT RED light NOT LIT 5.9 Closes 2CHS*FCV122 by depressing the Manual Pushbutton RED light LIT with AUTO light NOT LIT, and taking demand to 100%.
5.10 Checks 2SIS-MOV867A,B,CD ALL CLOSED by verifying GREEN lights LIT and RED lights NOT LIT.
5.11 Checks VCT Temperature <235F on 2CHS*TI116.
5.12 Starts either 2CHS*P21A OR 2CHS*P21B and verifies pump start with RED light LIT, GREEN light NOT LIT along with Ammeter reading normal amperage.
5.13 Starts a CNMT Recirculation Fan, if necessary.
COMMENTS:
EVALUATOR CUE: If candidate asks if CNMT Recirculation Fan is necessary, inform them it is not desired at this time.
EVALUATOR NOTE: Depending on candidates timing, plant conditions will degrade during the next step requiring SI to be actuated and transition to ECA-0.2. IAW Caution prior to step 4 or by direction in step 6.
Page 7 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 6.
Establish Normal Charging Flow
- a. Close [2CHS*FCV122]
- b. Open [2CHS*MOV310]
- c. Open [2CHS*MOV289]
- d. Adjust [2CHS*FCV122]
to maintain PRZR level.
6.1 Verifies 2CHS*FCV122 was previously closed by Manual Pushbutton RED light LIT with AUTO light NOT LIT, and demand at 100%.
6.2 Verifies 2CHS*MOV310 OPEN Verifies RED light LIT GREEN light NOT LIT.
6.3 Verifies 2CHS*MOV289 OPEN Verifies RED light LIT GREEN light NOT LIT.
6.4 Adjusts 2CHS*FCV122 as necessary to maintain PRZR Level.
COMMENTS:
7.C Verify SI Flow Not Required.
- b. PRZR level - Greater than 17% [38% Adverse CNMT]
7.1 Evaluates RCS Subcooling.
7.2C Determines that SI has automatically actuated or must be actuated due to lowering pressurizer pressure and/or level and transitions to ECA-0.2 COMMENTS:
Page 8 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 8C.
Check SI Signal Status -
RESET 8.1 Checks SI not reset by verifying Annunciator A12-1D is LIT.
8.2C Candidate Resets Train A SI by depressing Train A Safety Injection Reset pushbutton.
8.3C Candidate Resets Train B SI by depressing Train B Safety Injection Reset pushbutton.
8.4 Verifies SI reset by checking Annunciator A12-1C is LIT and Annunciator A12-1D is NOT LIT COMMENTS:
- 9.
Check RWST Level -
Greater Than 369 Inches 9.1 Checks RWST Level on 2QSS*LI100A/B or PCS greater than 369.
COMMENTS:
EVALUATOR NOTE: There is a 75 second Time Delay after SI Actuation before it can be reset.
Page 9 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 10.
Manually Align Components To SI Injection Alignment
- a. Refer to Att. A-0.12 10.1 Transitions to Attachment A-0.12, Step 1.
COMMENTS:
EVALUATOR NOTE: Candidate may have previously verified SI components when Safety Injection actuated.
Fault Statement The following components failed to actuate to Safety Injection positions on receipt of the Safety Injection signal:
- 2HCS*SOV136A
- 2HCS*SOV136B
- 2HCS*SOV133A
- 2HCS*SOV134A
- 2CHS*LCV115C
- 2QSS*MOV120A
- 2QSS*MOV120B EVALUATOR CUE: Once candidate has located procedure A-0.12, hand them a copy and inform them that another crew will monitor plant conditions.
Page 10 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 11.
Perform appropriate checklist for the SI Configuration:
- a. If BOTH trains of SI have actuatedTHEN complete the checklist in Part A of this attachment.
- b. If SI Train A Only has been actuated THEN complete the checklist in Part B of this attachment.
- c. If SI Train B Only has been actuated THEN complete the checklist in Part C of this attachment.
11.1 Completes Part A Checklist by documenting the as found position of the following:
Vertical Board A Expected Documentation 2HCS*SOV136A OPEN (Action Required) 2HCS*SOV136B OPEN (Action Required) 2HCS*SOV133A OPEN (Action Required) 2HCS*SOV134A OPEN (Action Required) 2HCS*SOV100A1 LIT 2HCS*SOV100B1 LIT 2HCS*SOV135A OPEN 2HCS*SOV135B OPEN 2HCS*SOV133B OPEN 2HCS*SOV134B OPEN COMMENTS:
EVALUATOR NOTE:
OFF - WHITE Light LIT or DEENERGIZED CLOSED - GREEN Light LIT & RED Light NOT LIT OPEN - RED Light LIT & GREEN Light NOT LIT ON - AMBER Light LIT
Page 11 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 11 (contd).
11.1 Completes Part A Checklist by documents the as found position of the following (contd):
Bench Board A 2CHS*MOV289 CLOSED 2SWS*MOV113A OPEN 2SWS*AOV118A CLOSED 2SIS*MOV865A OPEN 2SWS*MOV113D OPEN 2SWS*AOV118B CLOSED 2SIS*MOV865B OPEN 2SIS*MOV865C OPEN 2CHS*LCV115D OPEN 2SIS*MOV867B OPEN 2SIS*MOV867D OPEN 2CHS*LCV115E CLOSED 2SIS*MOV867A OPEN 2SIS*MOV867C OPEN 2CHS*LCV115B OPEN 2CHS*LCV115C CLOSED (Action Required) 2CHS*MOV310 CLOSED Bench Board B 2RCP*H2A OFF 2RCP*H2D OFF 2RCP*H2B OFF 2RCP*H2E OFF 2QSS*AOV120A CLOSED (Action Required) 2QSS*AOV120B CLOSED (Action Required)
COMMENTS:
EVALUATOR NOTE:
OFF-WHITE Light LIT CLOSED - GREEN Light LIT & RED Light NOT LIT OPEN - RED Light LIT & GREEN Light NOT LIT EVALUATOR NOTE: Candidate may continue checklist on BB-C but there are no components that failed to realign. If candidate has correctly positions all components listed in Step 12, the JPM is complete.
Page 12 of 12 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-802 JPM REVISION: 0 JPM TITLE: Response to Safety Injection in ECA-0.1 STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 12.C If Any Component is NOT in Its required position, THEN perform one of the following:
- Place the component in the required position using the control switch.
- Verify the redundant (opposite train) in its required position.
- Initiate action to locally position the component to the required position.
12.1C Aligns A H2 Analyzer in service by taking control switch for the following valves to OPEN and verifying RED light LIT, GREEN light NOT LIT:
- 2HCS*SOV136A
- 2HCS*SOV136B
- 2HCS*SOV133A
- 2HCS*SOV134A 12.3 Closes 2CHS*LCV115E by taking control switch to CLOSE and verifying RED light NOT LIT, GREEN light LIT.
12.4C Closes 2QSS*MOV120A and 2QSS*MOV120B by placing control switch to CLOSE and verifying RED light NOT LIT and GREEN light LIT.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: Once candidate has completed and corrected components through BB-B, state This JPM is complete.
EVALUATOR NOTE: Candidate may have previously repositioned valves when verifying SI.
EVALUATOR NOTE: Candidate should have previously repositioned valve per RNO for blender unavailable.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
- The plant tripped due to a loss of offsite power, both EDGs failed to automatically start.
- While evaluating selection of the Cross-tie path, both EDGs were able to be started locally, the crew progressed thru ECA-0.0 and transitioned to ECA-0.1, Loss of All AC Power Recovery Without SI Required.
INITIATING CUE:
Continue recovery efforts to stabilize the plant in accordance with ECA-0.1, Step 1.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Perform LHSI Pump Surveillance TRAINING MATERIAL NUMBER:
2CR-645 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-645 REVISION NUMBER:
5 TECHNICAL
REFERENCES:
2OST-11.2 Low Head Safety Injection Pump 2SIS*P21B Test, Rev. 34 INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
20 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-645 New Revision: 5 Description of Change(s):
- 1. Updated for procedure revision.
- 2..
Reason for Change (s):
- 1. Procedure was revised to rev. 34
- 2.
Page 1 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance K/A
REFERENCE:
006A4.01 4.3 TASK ID:
0111-202-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 11 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
2OST-11.2 completed AND FAILS due to low pump differential calculated on Data Sheet 3.
Note: Operator may declare 2SIS*P21B Inoperable/fail OST based on 2SIS*MOV8890B 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv failing to AUTO Open.
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
2OST-11.2, Low Head Safety Injection Pump, 2SIS*P21B, Test preparations have been completed through section VII.A.
INITIATING CUE:
Your Supervisor directs you to complete the remaining portions of 2OST-11.2 and return the completed OST to him for review.
Operators are positioned in the field to support this test.
REFERENCES:
2OST-11.2, Low Head Safety Injection Pump 2SIS*P21B Test, Rev.
- 34.
TOOLS:
Stopwatch Calculator HANDOUT:
2OST-11.2 Low Head Safety Injection Pump 2SIS*P21B Test, Rev 34 completed through step VII.A AND VII.B steps 1g and 1h N/A'ed.
2OST-11.2 Completed Data Sheets 1 & 2 attached at the back of this JPM.
Page 3 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1. Verify Open 2SIS*MOV8809B 21B Low Head SI Pump Suct Isol.
1.1 Verifies 2SIS*MOV8809B, 21B Low Head SI Pump Suct Isol. Vlv OPEN; 1.2 Verifies RED light - LIT, GREEN light - NOT LIT.
COMMENTS:
- 2.
Verify Open 2SIS*MOV8809A 21A Low Head SI Pump Suct Isol.
2.1 Verifies 2SIS*MOV8809A, 21A Low Head SI Pump Suct Isol. OPEN; 2.1 Verifies RED light - LIT, GREEN light - NOT LIT.
COMMENTS:
- 3.
Verify or place 2SIS*MOV8890B LHSI Pp 21B Mini Flow Recirc Isol control switch in AUTO.
3.1.
Verifies 2SIS*MOV8890B, 21B Low Head SI Pump Min Flow Recirc Isol Vlv control switch in AUTO.
COMMENTS:
SIMULATOR SETUP:
Initialize any IC, use SCHEDULE FILE JPM 2CR645 schedule.sch Establish computer log for this OST.
NEED to fail 2SIS*MOV8890B from AUTO open but allow manual opening and insert MALF for 2SIS*6, check valve leakage.
Page 4 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 4. If the Reactor Coolant System pressure is >250 psig Perform the following: (otherwise N/A).
- 1) Verify Open 2SIS-MOV8887B, 21B, Low Head SI Pump Disch To Hot Legs.
- 2) Verify Open 2SIS-MOV8887A, 21A, Low Head SI Pump Disch To Hot Legs.
4.1 Verifies 2SIS-MOV8887B, 21B, Low Head SI Pump Disch To Hot Legs OPEN; 4.2 RED light - LIT, GREEN light - NOT LIT.
4.3 Verifies 2SIS-MOV8887A, 21A, Low Head SI Pump Disch To Hot Legs OPEN; 4.4 Verifies RED light - LIT, GREEN light - NOT LIT.
COMMENTS:
- 5. Verify Closed 2SIS*MOV8811B, Recirc Spray Pump 21D Disch Crossover to LHSI Pp 21B.
5.1 Verifies 2SIS*MOV8811B, Recirc Spray Pump 21D Disch Crossover to LHSI Pp 21B CLOSED 5.2 Verifies GREEN light - LIT, RED light - NOT LIT.
COMMENTS:
- 6. Verify Closed 2SIS*MOV863B, LHSI Pp 21B Disch to HHSI Pumps Isol.
6.1 Verifies 2SIS*MOV863B, 21B, Low Head SI Pump Disch to High Head Pumps CLOSED.
6.2 Verifies GREEN light - LIT, RED light - NOT LIT.
COMMENTS:
Page 5 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 7. Establish a log for the following Computer Points with a 10 min (maximum) collection frequency:
T2678A, LHSI PP 21B INBD BRG SIS-TE100B1 T2679A, LHSI PP 21B OUTBD BRG SIS-TE100B2 T0920A, LHSI PP 21B MTR INBD SIS-TE101B1 T0921A, LHSI PP 21B OUTBD SISTE101B2 7.1 N/A COMMENTS:
- 8. Record 2SIS-PI939, LHSI Pump 21B Inlet Pressure.
Local Inlet Pressure =________ psig 8.1 Contacts local operator and requests 2SIS-PI939, LHSI Pump 21B Inlet Pressure.
8.2 Records 2SIS-PI939, LHSI Pump 21B Inlet Pressure of 33.8 psig in the space provided in the OST.
COMMENTS:
- 9.
Verify 2SIS*P21B, LHSI Pump, bearing oil level is normal. (local constant level oilers) 9.1 Contacts local operator, requests operator to verify 2SIS*P21B, LHSI Pump, bearing oil level is normal.
COMMENTS:
EVALUATOR CUE: Logs being established &
monitored by additional Operating Personnel.
EVALUATOR CUE: Role-play local operator and report 2SIS-PI939 LHSI Pump 21B Inlet Pressure is 33.8 psig EVALUATOR CUE: Role-play local operator and report 2SIS*P21B, LHSI Pump, bearing oil level is NORMAL.
Page 6 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 10.
Establish communication between the Control Room and 2SIS*P21B, LHSI Pump, Safeguards Elev. 718'.
10.1 Previously established.
COMMENTS:
11.C Start (and record Pump Start Time) 2SIS*P21B, Low Head SI Pump. BB Section A Pump Start Time =________ sec.
11.1C Places CS for 2SIS*P21B, Low Head SI Pump to START AND 11.2 Informs Local Operator to Start the stopwatch.
11.3 Verifies 2SIS*P21B, Low Head SI Pump starts; 11.4 Verifies RED light - LIT, WHITE light - NOT LIT.
11.5 Verifies 2SIS-II21B, 21B Low Head SI Pump Amps stabilizes.
11.6 Records stopwatch time in the OST.
COMMENTS:
EVALUATOR NOTE: Pump Start Time is the time the control switch is placed in the start position until stable pump discharge pressure is achieved, and is required for 2BVT 1.1.2 "Safeguards Time Response Test".
EVALUATOR CUE: As Local Operator, report that the Pump Start time is 3.8 seconds.
Page 7 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 12.C Verify the following:
- 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv, open. BB Section A
- 2SIS-II21B, LHSI Pump 21B Current, steady state current <41 amps. VB-A
- 2SIS*P21B, LHSI Pump, operation is normal, i.e.,
noise, vibration, leakage, etc. is not excessive. (If pump operation is questionable stop the pump.)
12.1 Verifies 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv is NOT OPEN.
12.2 Verifies GREEN light - LIT, RED light - NOT LIT.
AND 12.3C Places CS for 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv, to OPEN.
12.4 Verifies 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv OPEN.
12.5 Verifies RED light - LIT, GREEN light - NOT LIT.
12.6 Verifies 2SIS-II21B, 21B Low Head SI Pump Amps are 41 amps.
12.7 Contacts local operator and requests operator to verify 2SIS*P21B, LHSI Pump, operation is normal, i.e., noise, vibration, leakage, etc. is not excessive.
COMMENTS:
BOOTH INSTRUCTOR NOTE: If the candidate initially shutdown the pump due to failure of the recirc valve to auto open, consider re-running the schedule file to ensure 2SIS*MOV8890B will open upon demand from CS.
FAULT STATEMENT The next step is FAULTED. 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv, WILL NOT AUTO OPEN and must be MANUALLY OPENED.
EVALUATOR CUE: Role-play local operator and report 2SIS*P21B LHSI Pump operation is NORMAL.
EVALUATOR CUE: As SM, have Operator restart pump (if necessary) continue with OST while Engineering and Maintenance evaluate 2SIS-MOV8890B AUTO Open issue.
Page 8 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 13.
Verify 2SIS*6, LHSI Pump 21A Discharge Check is closed, by verifying; 2SIS*P21A, LHSI Pump 21A shaft is NOT rotating backwards.
- 13.
Contacts local operator and requests operator verify 2SIS*P21A, LHSI Pump 21A shaft is NOT rotating backwards.
COMMENTS:
- 14.
Ensure the pump has operated for a minimum of 2 minutes.
14.1 Verifies pump runs for 2 minutes by observing clock or stopwatch.
COMMENTS:
- 15.
Record 2SIS*P21B, LHSI Pump Motor Vibration on Data Sheet 1 and Pump Vibration on Data Sheet 2.
15.1 Contacts local operator and requests the operator record 2SIS*P21B, LHSI Pump Motor Vibration on Data Sheet 1 and Pump Vibration on Data Sheet 2.
COMMENTS:
EVALUATOR CUE: Role-play local operator and report 2SIS*P21A, LHSI Pump 21A shaft is not rotating backwards.
EVALUATOR CUE: Role-play local operator and Inform the Candidate that LHSI Pump Motor Vibration on Data Sheet 1 and Pump Vibration on Data Sheet 2 will be filled out locally and returned to the CR.
EVALUATOR NOTE: Completed Data Sheets 1 and 2 are attached to the back of this JPM, if candidate requests vibration data, then provide, otherwise vibration data is not needed for JPM.
Page 9 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 16.
Obtain inlet pressure, discharge pressure, and flowrate on Data Sheet 3.
16.1 Obtains inlet pressure from information provided by local operator in step 8.
16.2 Obtains discharge pressure 2SIS-PI944.
16.3 Obtains flowrate 2SIS-FIS970B.
16.4 Records the data on appropriate spaces of Data Sheet 3.
COMMENTS:
17.C Calculate 2SIS*P21B, LHSI Pump, Differential Pressure (P), as required on Data Sheet 3.
17.1 Performs Calculations as required on Data Sheet 3.
17.2C Determines pump P is outside the acceptable range.
COMMENTS:
EVALUATOR CUE: As Local Operator, report 2SIS-PI939 as 33.8 psig, 2SIS-PI944 as 132 psig, and 2SIS-FIS970B as 1450 gpm.
FAULT STATEMENT 2SIS*6 is leaking. This will cause the pump to fail the P criteria calculation on Data Sheet 3.
EVALUATOR NOTE: Pump P = 98.2 psid
Page 10 of 11 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-645 JPM REVISION: 5 JPM TITLE: Perform LHSI Pump Surveillance STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 18.C After a minimum of 2 minutes satisfactory operation:
Stop 2SIS*P21B, Low Head SI Pump.
Verify 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv, closes.
18.1C Places CS for 2SIS*P21B, Low Head SI Pump to STOP.
AND 18.2 Verifies 2SIS*P21B, LHSI Pump SHUTDOWN; 18.3 Verifies WHITE light - LIT, RED light - NOT LIT.
18.4 Verifies 2SIS*MOV8890B, 21B Low Head SI Pump Minimum Flow Recirc Isol Vlv CLOSED; 18.5 Verifies GREEN light - LIT, RED light - NOT LIT.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE:
Role-play the Unit supervisor and inform the candidate that management has decided to tag out 2SIS*MOV8890B and investigate the AUTO open failure. No further actions are necessary for this OST.
That completes this JPM.
EVALUATOR NOTE:
It may be necessary to ask a follow-up question to verify that the candidate is aware that the pump P is outside the acceptable range. If necessary, ask the candidate if all OST acceptance criteria have been met.
This should be done after the JPM has been terminated in the next step.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
2OST-11.2, Low Head Safety Injection Pump, 2SIS*P21B, Test preparations have been completed through section VII.A.
INITIATING CUE:
Your Supervisor directs you to complete the remaining portions of 2OST-11.2 and return the completed OST to him for review.
Operators are positioned in the field to support this test.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
JPM SUPPORTING INFORMATION FOR TRAINING USE ONLY DATA SHEET 1 MOTOR DATA(17)
Note: Ensure the vibration meter magnetic probe is placed over the fixed metal lettered location tag (as shown on the right) when obtaining vibration measurements per Figure 1. IF a metal lettered location tag is missing, damaged or not flat, notify the PdM Group (via a memo) and obtain the vibration measurement at the location on Figure 1 with the vibration meter probe placed on the nearest flat area in the same plane for repeatable data collection.
Note:
- Motor bearing vibrations are for information only and are required to be taken each performance.
- BOP limits do not constitute acceptance criteria, System and Performance Engineering shall be contacted for recommended action if BOP limits are exceeded.
- See Figure 1 for bearing locations.
- Motor Speed - 1780 RPM.
Motor Vibration Readings Date _____/_TODAY_/_____
Time ___NOW____
Initials ____INO___
Bearing Location (#) Metal Location Tag (Letter)
Actual Vibration (in/sec)
Reference Vibratio n
(in/sec)
BOP Limit (in/sec)
Motor Outboard (1)
Axial (A) [M1A]
0.03221 0.0235 0.325 Motor Outboard (1)
Horizontal (H) [M1H]
0.03137 0.0306 0.325 Motor Outboard (1)
Vertical (V) [M1V]
0.04161 0.0362 0.325 Motor Inboard (2)
Axial (A) [M2A]
0.04393 0.0318 0.325 Motor Inboard (2)
Horizontal (H) [M2H]
0.03303 0.0310 0.325 Motor Inboard (2)
Vertical (V) [M2V]
0.04261 0.0357 0.325 Out of Spec readings do not affect ASME or EQ Acceptance Criteria.
JPM SUPPORTING INFORMATION FOR TRAINING USE ONLY DATA SHEET 2 ASME DATA - PUMP VIBRATION READINGS(17)
Note:
Pump vibration is required to be taken each performance.
Pump Speed =1780 RPM.
Note: Ensure the vibration meter magnetic probe is placed over the fixed metal lettered location tag (as shown on the right) when obtaining vibration measurements per Figure 1. IF a metal lettered location tag is missing, damaged or not flat, notify the IST Coordinator (via a memo) and obtain the vibration measurement at the location on Figure 1 with the vibration meter probe placed on the nearest flat area in the same plane for repeatable data collection.
Note:
Since the BVPS IST Program does not require vibration measurements during a Group B pump test, the following pump vibrations are for information only. The Limit reflected below does not constitute Acceptance Criteria, but only the PdM Group SHALL be contacted for recommended actions if the Limit is exceeded during the quarterly Group B test. If this test is being performed as a PMT, then pump vibrations obtained during this test are also the new reference pump vibrations as required for a Group A pump test.
Pump Vibration Readings Date _____/_TODAY_/_____
Time ___NOW____
Initials ____INO___
Bearing Location (#)
Metal Location Tag (Letter)
Actual Vibration (in/sec)
Reference Vibration (in/sec)
BOP Limit (in/sec)
Pump Inboard (1)
Axial (A) [P1A]
0.2270 0.3042 0.325 Pump Inboard (1)
Horizontal (H) [P1H]
0.1094 0.1212 0.325 Pump Inboard (1)
Vertical (V) [P1V]
0.1862 0.1073 0.325 Pump Outboard (2)
Axial (A) [P2A]
0.2661 0.2858 0.325 Pump Outboard (2)
Horizontal (H) [P2H]
0.1393 0.1841 0.325 Pump Outboard (2)
Vertical (V) [P2V]
0.1167 0.1186 0.325
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Start a Reactor Coolant Pump TRAINING MATERIAL NUMBER:
2CR-613 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-613 REVISION NUMBER:
3 TECHNICAL
REFERENCES:
2OM-6.4.A, Reactor Coolant Pump Startup, Revision 20 INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
20 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-613 New Revision: 3 Description of Change(s):
- 1. Updated Task ID.
- 2.
- 3.
- 4.
Reason for Change (s):
- 1. Task ID changed
- 2.
- 3.
- 4.
Page 1 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-613 JPM REVISION: 3 JPM TITLE: Start a Reactor Coolant Pump K/A
REFERENCE:
003A2.02 3.7/3.9 TASK ID:
0062-201-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID#:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 5 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
2RCS*P21B Reactor Coolant Pump is started and then manually tripped due to starting in less than 114 seconds (As per Caution prior to step)
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
- The plant is in Mode 3, preparing for entry into Mode 2.
- 2RCS*P21A and 2RCS*P21C, Reactor Coolant Pumps are in operation.
- 2OM-6.4.A, Reactor Coolant Pump Startup has been commenced and all steps through step IV.B.11 have been performed for 2RCS*P21B, Reactor Coolant Pump.
INITIATING CUE:
The Unit Supervisor directs you to start Reactor Coolant Pump 2RCS*P21B, in accordance with 2OM-6.4.A, Step IV.B.12.
REFERENCES:
2OM-6.4.A, Reactor Coolant Pump Startup, Revision 20 TOOLS:
None HANDOUT:
2OM-6.4.A, Rev. 20 Reactor Coolant Pump Startup place kept up through step IV.B.10.c.
Page 3 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-613 JPM REVISION: 3 JPM TITLE: Start a Reactor Coolant Pump STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Reviews procedure.
1.1 Reviews 2OM-6.4.A, Reactor Coolant Pump Startup.
COMMENTS:
- 2.
Check that RCS temperature is within the limits of Precautions and Limitations II.J of this procedure for the number of RCP(s) to be operating.
2.1 Verifies any available RCS temperature 137°F.
COMMENTS:
SIMULATOR SETUP:
Use a Mode 3 IC with the plant at NOT/NOP with A and C RCPS in service, Start with IC-11, S/D B RCP, isolate or reduce SG blowdown flow, wait until Tavg and SG levels stabilize then snap IC.
Set Trigger 1 as GP05AFOA< = 476 Set action caused by trg 1 as SET GP05AFOA = 80 (this will change start timer from 120 seconds to 25 seconds AFTER the start timer actuates)
EVALUATOR CUE: After candidate reviews the procedure, and is ready to begin the JPM, Place the simulator to RUN.
Page 4 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-613 JPM REVISION: 3 JPM TITLE: Start a Reactor Coolant Pump STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 3.
If starting the first RCP AND any unisolated Reactor Coolant System loop cold leg temperature is less than or equal to the enable temperature specified in the PTLR, Verify the following: (otherwise N/A)
(T.S. 3.4.6 and T.S. 3.4.7).
3.1 Marks step N/A due to RCPs already running.
COMMENTS:
4.C Place 2RCS*P21B, Reactor Coolant Pump control switch to START AND observe the following:
4.1C Places 2RCS*P21B control switch to Start and notes time.
COMMENTS:
- 5. 2RCS-P21B1, 21B Reactor Coolant Pump Bearing Lift Oil Pump starts.
5.1 Verifies 21B Reactor Coolant Pump Bearing Lift Oil Pump starts.
5.2 Verifies 2RCS-P21B1 RED light - LIT and GREEN light - NOT LIT.
COMMENTS:
FAULT STATEMENT:
The RCP will start ~25 seconds after control switch is placed in START. Per the CAUTION proceeding step IV.11.c, To prevent thrust bearing damage, the RCP shall be tripped if the RCP starts before the bearing lift oil pump has been running for at least 114 seconds.
EVALUATOR CUE: Candidate should use some means of timing the RCP start from the start of the lift oil pump.
Page 5 of 5 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-613 JPM REVISION: 3 JPM TITLE: Start a Reactor Coolant Pump STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 6.C After approximately 2 minutes, 2RCS*P21B, Reactor Coolant Pump starts 6.1C Determines that the RCP started in less than 114 seconds from the time the lift oil pump started and Places 2RCS*P21B control switch to STOP. (Green Target) 6.2 Verifies WHITE light - LIT, RED light - NOT LIT.
6.3 Verifies 2RCS-FI424(425)(426) flow dropping.
6.4 Verifies 2RCS-II21B amps dropping.
6.5 Notes time pump was tripped.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: State This JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
- The plant is in Mode 3, preparing for entry into Mode 2.
- 2RCS*P21A and 2RCS*P21C, Reactor Coolant Pumps are in operation.
- 2OM-6.4.A, Reactor Coolant Pump Startup has been commenced and all steps through step IV.B.11 have been performed for 2RCS*P21B, Reactor Coolant Pump.
INITIATING CUE:
The Unit Supervisor directs you to start Reactor Coolant Pump 2RCS*P21B, in accordance with 2OM-6.4.A, Step IV.B.12.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
2FWE*P22 Quarterly and Loss of DC Bus TRAINING MATERIAL NUMBER:
2CR-803 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-803 REVISION NUMBER:
0 TECHNICAL
REFERENCES:
2OST-24.4 Rev. 94, Steam Driven Auxiliary Feed Pump [2FWE*P22] Quarterly Test INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
20 Minutes PREPARED BY:
A. Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-803 New Revision: 0 Description of Change(s):
- 1. New JPM Reason for Change (s):
1 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus K/A
REFERENCE:
061 A2.03 3.1/3.4 TASK ID:
0241-202-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
20 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
2 of 8 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Candidate controls Pressurizer Level using 2CHS*FCV122 and RCS Temperature by tripping 2FWE*P22 or throttling 2SVS*HCV104.
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
The plant is in Mode 3 preparing for a plant startup.
2MSS*SOV105C was recently repaired and requires a stroke test IAW 2OST-24.4, Steam Driven Auxiliary Feed Pump [2FWE*P22]
Quarterly Test.
INITIATING CUE:
- Perform a partial 2OST-24.4 beginning on step VII.B.1.b, Page 27, to perform a Cold Fast Start of 2FWE*P22.
- With 2FWE*P22 running, perform a stroke test of 2MSS*SOV105C by performing step VII.D.2.a, Page 47, through step VII.D.4.a.3, page 63.
REFERENCES:
2OST-24.4 Rev. 94, Steam Driven Auxiliary Feed Pump [2FWE*P22]
Quarterly Test 2OM-53C.4.2.39.1A Rev. 4, Loss of 125VDC Bus 2-1 TOOLS:
STOPWATCH HANDOUT:
2OST-24.4 Rev. 94, Steam Driven Auxiliary Feed Pump [2FWE*P22]
Quarterly Test, marked up.
2OM-53C.4.2.39.1A Rev. 4, Loss of 125VDC Bus 2-1
3 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Reviews procedure.
1.1 Reviews 2OST-24.4, Steam Driven Auxiliary Feed Pump [2FWE*P22] Quarterly Test.
COMMENTS:
SIMULATOR SETUP:
Initialize IC 165 (MODE 3)
Low Power Trend on VB-A Monitor Create Event 1 on 2MSS*SOV105C switch taken to the OPEN position Insert malfunction LOSS OF DC BUS 2-1 on Event 1.
RHR valve throttled open to maintain Tave BB-C Setup:
2MSS*SOV105A,B,C,D,E,F CLOSED.
EVALUATOR CUE: Inform candidate that for the duration of the exam, field operators are ready for quarterly test to start.
EVALUATOR CUE: After candidate reviews the procedure, and is ready to begin the JPM, Place the simulator to RUN.
4 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 2.
Start (and obtain pump start time and valve stroke time)
[2FWE*P22] by simultaneously placing control switches recorded in Step VII.B.1.a to OPEN AND starting the stopwatch..
- 1) Check RED indicating light ON for BOTH steam supply valves. (BB-C)
- 2) Check GREEN indicating light OFF for BOTH steam supply valves. (BB-C)
- 3) Check associated computer point indicates OPEN for BOTH steam supply valves.
(see data sheet 3 for computer point address)
- 4) Record Pump Start Time=___sec. (Maximum Expected Start Time: 44.9 seconds) 2.1 Starts 2FWE*P22 by simultaneously placing control switches for 2MSS*SOV105B and 2MSS*SOV105E to the OPEN position.
RED light - LIT GREEN light - NOT LIT 2.2 Checks computer points indicate OPEN for both steam supply valves.
2.3 Record Pump Start Time ~ 35 seconds.
COMMENTS:
- 3.
IF [2MSS*SOV105B and E] were used to start the TDAFW Pump, Step VII.B.1.a, THEN perform the following (otherwise N/A):
a) If a 3 stroke time test for PMT of [2MSS*SOV105A (B)(C)(D)(E)(F)] is required, perform Attachment 5 in conjunction with the following steps. (Otherwise N/A)
Valve requiring PMT:
[2MSS*SOV105___]
3.1 Records 2MSS*SOV105C as the valve requiring PMT.
COMMENTS:
EVALUATOR CUE: Once candidate has opened 2MSS*SOV105E and B, report from the field that 2FWE*P22 Pump start time was 35 seconds, pump is running SAT and a Narrative Log Entry has been made.
5 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 4.
Open [2MSS*SOV105F], Aux Feed Pump Stm Supply Isol Vlv, as follows:
- 1) Place control switch to OPEN
- 2) Check RED indicating light on.
- 3) Check and computer point
[Y5962D] indicating OPEN.
4.1 Opens [2MSS*SOV105F] by placing control switch in OPEN.
RED light LIT GREEN light NOT LIT 4.2 Checks computer point indicates OPEN.
COMMENTS:
4.C Time Open [2MSS*SOV105C],
Turb Driven AFW Pump Stm Hdr C Supply Isol, as follows:
- 1) Place control switch in OPEN AND start stopwatch.
- 2) Check RED indicating light on.
- 3) Check computer point
[Y5959D] indicating OPEN.
- 4) Record valve stroke time on Data Sheet 3.
4.1C OPENS [2MSS*SOV105C] by placing control switch in OPEN.
GREEN light - NOT LIT RED light - LIT 4.2 Checks computer point indicates OPEN on PCS.
4.3 Candidate responds to multiple alarms and enters procedure 2OM-53C.4.2.39.1A, Loss of 125VDC Bus 2-1.
COMMENTS:
EVALUATOR CUE: Inform candidate that another control room operator will operate the stopwatch.
FAULT STATEMENT:
When the candidate opens [2MSS*SOV105C] in the following step a loss of 125VDC Bus 1 will occur.
6 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 5.
Verify Reactor is Tripped a.Immediate actions of E-0, Reactor Trip or Safety Injection - COMPLETED OR
- b. Reactor Shutdown was verified by normal operating procedures.
- 5.
Verifies reactor is shutdown by checking Control Rods fully inserted and other diverse indications.
COMMENTS:
- 6.
Control RCS Pressure and Temperature Using the Following as Necessary:
- [2SVS*PCV101A(B)(C)],
Atm Stm Dump Control
- [2SVS*HCV104], Residual Heat Release Vlv.
- 6.
Checks RCS Temperature and Pressure for impact and controls RCS Pressure and Temperature by adjusting 2SVS*HCV104 as necessary.
COMMENTS:
- 7.
Reduce Charging Flow to Limit PRZR Level Rise.
- a. Manually adjust
[2CHS*FCV122], Charging Pumps Disch Flow Control Valve.
- b. Manually adjust
[2CHS*HCV186], Reactor Coolant Pump Seal Inj Flow Controller.
7.1C Places 2CHS*PK122 in MANUAL by depressing the MAN button.
MAN light - LIT AUTO light - NOT LIT 7.2C Throttles 2CHS*FCV122 by depressing the MAN pushbutton and raising demand in the CLOSED direction.
MAN light - LIT AUTO light - NOT LIT 7.3 Throttles 2CHS*HCV186 in the CLOSED direction by taking the hand control knob in the CLOSED direction.
COMMENTS:
EVALUATOR NOTE: Initial Conditions informed candidate that the unit is in MODE 3.
7 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 8.
Check Main Turbine Status
- a. Check the following:
Speed - ABOVE 300 RPM AND Annunciator A6-5G, CONDENSER VACUUM LOW/LOW-LOW - NOT LIT RNO If either of the following occurs:
Speed - Below 300 RPM OR Annunciator A6-5G - LIT THEN open [2ASS-MOV100],
21B Condenser Vacuum Breaker Vlv.
8.1 Checks Turbine Secured (RPM <300) and Opens 2ASS-MOV100, 21B Condenser Vacuum Breaker Valve.
RED light - LIT GREEN light - NOT LIT COMMENTS:
8 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 9.C Operate Plant with 125VDC Bus 2-1 De-energized while contiuing bus recovery attempts
- Refer to Attachment 1, Operation with 125VDC Bus 2-1 De-energized.
9.1 Refers to Attachment 1 of 2OM-53C.4.2.39.1A.
9.2C Manually adjusts 2CHS*FCV122 to reduce charging flow to minimum by raising demand to 100% on 2CHS*PK122 controller.
9.3 Manually adjusts 2CHS*HCV186 to reduce seal injection flow to ~6gpm by adjusting hand control knob in the closed direction.
9.4 Opens 2CHS*LCV115B by taking control switch to OPEN.
RED light - LIT GREEN light - NOT LIT 9.5 Opens 2CHS*LCV115D by taking control switch to OPEN.
RED light - LIT GREEN light - NOT LIT 9.6 Closes 2CHS*LCV115C by taking control switch to CLOSE.
GREEN light - LIT RED light - NOT LIT 9.7 Closes 2CHS*LCV115E by taking control switch to CLOSE.
GREEN light - LIT RED light - NOT LIT 9.8C Secures 2FWE*P22 by depressing 2FWE*P22 Trip Button on BB-C or dispatching an operator to locally trip.
COMMENTS:
EVALUATOR NOTE: The Critical to control RCS Temperature is accomplished by tripping 2FWE*P22 OR by throttling 2SVS*HCV104.
EVALUATOR CUE: If candidate is hesitant to perform Att. 1, inform them that another operator will continue in AOP while they perform Att. 1 EVALUATOR CUE: If dispatched to locally secure 2FWE*P22, report that it is secured.
9 of 8 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-803 JPM REVISION: 0 JPM TITLE: 2FWE*P22 Quarterly and Loss of DC Bus STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 10.
As needed, replace each load on Bus 2AE-2-8N with its corresponding load on Bus 2DF/2-9P as follows:
- a. Close the corresponding load on Bus 2DF/2-9P.
- b. Manually trip the load breaker on Bus 2AE/2-8N.
- c. If Applicable then place the control switch for the bus 2AE/2-8N load in Pull-To-Lock.
Align [2SWE-P21B], Standby Service Water Pump, to supply Train A SWS header.
- Refer to 2OM-30.4.G, Standby Service Water System Startup.
10.1 Replaces 2-8N loads with 2-9P corresponding loads by closing breaker on 2-9P, tripping breaker on 2-8N, and placing 2-8N loads in PTL as necessary.
COMMENTS:
11.C Control RCS pressure and temperature using either of the following as necessary:
- [2SVS*PCV101A(B)(C)],
Atmospheric Steam Dump Valve(s).
- [2SVS*HCV104],
Residual Heat Release Valve.
11.1 Checks closed 2SVS*PCV101A, (B), (C)
Atmospheric Steam Dump Valves by verifying GREEN lights - LIT RED lights - NOT LIT 11.2C Manually throttles 2SVS*HCV104 Residual Heat Release Valve by adjusting hand control knob until RCS trending to normal Tave.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: State This JPM is EVALUATOR CUE: Another operator is performing Step 4 of Attachment 1 of 2OM-53C.4.2.39.1A.
EVALUATOR NOTE: Critical step(s) to control RCS Temperature are accomplished by tripping 2FWE*P22 OR by throttling 2SVS*HCV104.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The plant is in Mode 3 preparing for a plant startup.
2MSS*SOV105C was recently repaired and requires a stroke test IAW 2OST-24.4, Steam Driven Auxiliary Feed Pump [2FWE*P22]
Quarterly Test.
INITIATING CUE:
- Perform a partial 2OST-24.4 beginning on step VII.B.1.b, Page 27, to perform a Cold Fast Start of 2FWE*P22.
- With 2FWE*P22 running, perform a stroke test of 2MSS*SOV105C by performing step VII.D.2.a, Page 47, through step VII.D.4.a.3, page 63.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Startup Containment Purge and Exhaust Through the SLCRS Unfiltered Flowpath TRAINING MATERIAL NUMBER:
2CR-154 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-154 REVISION NUMBER:
5 TECHNICAL
REFERENCES:
2OM-44C.4.A, Containment Air Purge And Exhaust System Startup, Rev. 26 INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
10 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-154 New Revision: 5 Description of Change(s):
- 1. Updated for current JPM format and procedure revision.
- 2. Updated Task ID.
- 3. Modified Initiating Cue - to specify a required flowrate.
Reason for Change (s):
- 1. Match current revision.
- 2. Task IDs changed.
- 3. Strengthens demonstration of ability to perform task.
Page 1 of 6 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-154 JPM REVISION: 5 JPM TITLE: Startup Containment Purge and Exhaust Through the SLCRS Unfiltered Flowpath K/A
REFERENCE:
103A4.01 3.2/3.2 029A4.01 2.5/2.5 TASK ID:
0443-009-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID#:
Time Critical:
Yes Allotted Time:
10 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 6 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Containment Purge flow through the Unfiltered flowpath is initiated at a flowrate that is less than the maximum allowed by the RWDA-G.
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
- The plant is in MODE 5.
- The Supplementary Leak Collection and Release System is in service.
- A RWDA-G has been issued and approved to Purge Containment through the Unfiltered flowpath.
- The RWDA-G Maximum allowable flow rate is 30,000 scfm
- 2OM-44C.4.A, Containment Air Purge And Exhaust System Startup Part A raising Containment pressure to Atmospheric Pressure has just been completed.
INITIATING CUE:
Startup Containment Air Purge and Exhaust System through the SLCRS Unfiltered Flowpath at a flowrate of 25,000 scfm, in accordance with 2OM-44.C.4.A, Part B.
REFERENCES:
2OM-44C.4.A, Containment Air Purge And Exhaust System Startup, Rev. 26 TOOLS:
None HANDOUT:
2OM-44C.4.A, Containment Air Purge And Exhaust System Startup, Rev. 26, place kept up to Part B.
Page 3 of 6 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-154 JPM REVISION: 5 JPM TITLE: Startup Containment Purge and Exhaust Through the SLCRS Unfiltered Flowpath STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Reviews 2OM-44C.4.A, Containment Air Purge And Exhaust System Startup procedure.
1.1 Reviews 2OM-44C.4.A.
COMMENTS:
- 2.
Check Containment pressure equalized to atmospheric.
2.1 Checks CNMT air pressure by looking at any of the following; 2CVS-PI101A1(B1) ~ 14.7 psia 2LMS-PI950/1/2/3 ~ ZERO Computer point UP1000 COMMENTS:
SIMULATOR SETUP:
Start with Mode 5 IC-19, (Can setup w/ other than M5)
Perform steps of 2OM-44C.4.C to S/D CNMT Purge.
Ensure SLCRS is in service.
Ensure CNMT Purge is Shutdown.
Perform 2OM-44C.4.A, Containment Air Purge and Exhaust System Startup Part A raising Containment pressure to Atmospheric Pressure.
NOTE: To CLOSE 2HVR*DMP206, select REMOTE LOA-MSC004. Also note that some manipulations may be required based on the starting Mode 5 IC snap.
Once setup, freeze simulator and snap IC.
EVALUATOR CUE: Provide candidate a place kept copy of 2OM-44C.4.A up to Section B (Pg 5). If asked about reviewing RWDA-G, inform the candidate that it is NOT necessary to review this paperwork for purposes of this JPM and direct the candidate to proceed with the stated task at hand.
Page 4 of 6 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-154 JPM REVISION: 5 JPM TITLE: Startup Containment Purge and Exhaust Through the SLCRS Unfiltered Flowpath STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Open 2HVR*MOD23A, CNMT Purge Discharge Isol Damper. (BSC Panel) 3.1C Place & Hold CS for 2HVR*MOD23A, Cnmt Purge Exhaust Discharge Isol Damper to OPEN.
3.2 Verifies RED light - LIT, GREEN light - NOT LIT.
COMMENTS:
4.C Place PURGE FILTERED/CLOSE/PURGE UNFILTERED control switch for 2HVR*MOD21, 22, Containment Purge Exhaust Motor Operated Dampers to the PURGE UNFILTERED position and observe 2HVR*MOD21 Opens.
4.1C Places CS for PUR FILT-CLOSE-PUR UNFILT to PUR UNFILT position.
4.2 Verifies 2HVR*MOD21, CNMT Purge Exhaust Dmprs to Normal Exhaust Fans OPEN; RED Light - LIT, GREEN Light - NOT LIT.
COMMENTS:
5.C Open 2HVR*MOD25A, CNMT Purge Supply Isol Damper.
5.1C Adjusts Places CS for 2HVR*MOD25A, CNMT Purge Supply Isol Damper to OPEN.
5.2 Verifies WHITE demand signal light LIT while damper is moving, then verifies; RED Light - LIT, GREEN Light - NOT LIT.
COMMENTS:
Page 5 of 6 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-154 JPM REVISION: 5 JPM TITLE: Startup Containment Purge and Exhaust Through the SLCRS Unfiltered Flowpath STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 6.C Place NORMAL/PURGE control switch for containment purge air supply to PURGE, and verify or perform the following:
- a. Stop 2HVP-ACU211B, Primary Auxiliary Building A/C Unit, if unit was in service.
- b. 2HVP-MOD23B, Outdoor Intake Damper, opens, or remains open.
- c. 2HVP-MOD28, Discharge Air Damper From 2HVP-ACU211B To Primary Auxiliary Building, closes.
- d. 2HVP-MOD29, Discharge Air Damper From 2HVP-ACU211B To Containment, Opens.
6.1C Places Norm/Purge CS to PURGE.
6.2 Places CS for 2HVP-ACU211B, PAB & CNMT Purge ACU to STOP or N/As step if not running.
6.3 Verifies WHITE Light - LIT, RED Light - NOT LIT.
6.4 Verifies 2HVP-MOD23B, PAB 211B ACU outside air intake Damper OPEN; RED Light - LIT, GREEN Light - NOT LIT.
6.5 Verifies 2HVP-MOD28, PAB & Solid waste ACU exhaust Damper CLOSES; GREEN Light - LIT, RED Light - NOT LIT.
6.6 Verifies 2HVP-MOD29, PAB ACU to CNMT Purge Supply Damper OPEN; RED Light - LIT, GREEN Light - NOT LIT.
COMMENTS:
7.C Start 2HVS-FN263B, Leak Collection Normal Exhaust Fan.
7.1C Places CS for 2HVS-FN263B, Leak Collection Normal Exhaust Fan to START.
7.2 Verifies RED Light - LIT, GREEN Light - NOT LIT.
COMMENTS:
Page 6 of 6 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-154 JPM REVISION: 5 JPM TITLE: Startup Containment Purge and Exhaust Through the SLCRS Unfiltered Flowpath STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 8.C Using the control switch on the BSC Panel, Throttle 2HVR*MOD23B OR (MOD25B), CNMT Purge Exhaust (Supply) Isol Damper to obtain the flow rate required by the RWDA permit, as indicated on 2HVR-FI22 Containment Purge Exhaust Flow, on local panel PNL-AFCP-RC.
8.1 Intermittently places CS for 2HVR*MOD23B OR (MOD25B), Damper to OPEN.
8.2 Contacts Outside operator to request 2HVR-FI22, Containment Purge Exhaust Flow indication.
8.3 Intermittently places CS for 2HVR*MOD23B OR (MOD25B), Damper to OPEN and requests reading.
8.4C Intermittently Places CS for 2HVR*MOD23B OR (MOD25B), Damper to CLOSE and requests reading.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE:
Role play outside operator and report 2HVR-FI22, flow is 25,000 SCFM and stable.
EVALUATOR CUE:
Role play outside operator and report 2HVR-FI22, Containment Purge Exhaust Flow is 15,000 SCFM EVALUATOR CUE:
Role play outside operator and report 2HVR-FI22, Containment Purge Exhaust Flow is 31,000 SCFM EVALUATOR CUE:
If asked, inform candidate that it is not desired to shift from induced purge air supply to forced air supply.
When completed inform candidate, This JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
- The plant is in MODE 5.
- The Supplementary Leak Collection and Release System is in service.
- A RWDA-G has been issued and approved to Purge Containment through the Unfiltered flowpath.
- The RWDA-G Maximum allowable flow rate is 30,000 scfm
- 2OM-44C.4.A, Containment Air Purge And Exhaust System Startup Part A raising Containment pressure to Atmospheric Pressure has just been completed.
INITIATING CUE:
Startup Containment Air Purge and Exhaust System through the SLCRS Unfiltered Flowpath at a flowrate of 25,000 scfm, in accordance with 2OM-44.C.4.A, Part B.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Perform a Hot Bus Transfer TRAINING MATERIAL NUMBER:
2CR-523 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-523 REVISION NUMBER:
4 TECHNICAL
REFERENCES:
2OM-36.4.C, Transferring 4KV System From US Serv Tfmr To SS Serv Tfmr, Rev 16 2OM-36.4.AAS, SYS STA Serv Tfmr 2A/2B Thermal Overload, Issue 1, Rev. 3 2OM-36.4.B, Transferring 4KV System From SS Serv Tfmr To US Serv Tfmr, Rev 10 INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
15 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-523 New Revision: 3 Description of Change(s):
- 1. Updated for procedure revision.
- 2. Updated Task IDs.
Reason for Change (s):
- 1. 2OM-36.4.C was revised to rev. 16
- 2. Task IDs changed.
Page 1 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer K/A
REFERENCE:
062K1.04 3.7/4.2 062A4.01 3.3/3.1 062A2.01 3.4/3.9 TASK ID:
0361-202-01-012 0361-203-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
15 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 10 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
4KV Bus 2B is transferred from USST 2C to SSST 2A. After receipt of SYS STA SERV TFMR 2A/2B Thermal Overload Fault, 4KV Bus 2B is transferred from SSST 2A to USST 2C.
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
The plant is in Mode 1 with all systems in NSA.
It is desired to place 4KV Bus 2B on offsite power to allow for a relay check on ACB-142C.
INITIATING CUE:
Your supervisor directs you to transfer the 4KV Bus 2B to SSST 2A in accordance with 2OM-36.4.C, Transferring 4KV System From US Serv Tfmr To SS Serv Tfmr. Do NOT set up for auto transfer back to USST 2C.
REFERENCES:
2OM-36.4.C, Transferring 4KV System From US Serv Tfmr To SS Serv Tfmr, Rev 16 2OM-36.4.AAS, SYS STA Serv Tfmr 2A/2B Thermal Overload, Issue 1, Rev. 3 2OM-36.4.B, Transferring 4KV System From SS Serv Tfmr To US Serv Tfmr, Rev 10 TOOLS:
None HANDOUT:
2OM-36.4.C, Transferring 4KV System From US Serv Tfmr To SS Serv Tfmr, Rev 16 Have spare copies available to replace the following procedures:
2OM-36.4.AAS, SYS STA Serv Tfmr 2A/2B Thermal Overload, Issue 1, Rev. 3 2OM-36.4.B, Transferring 4KV System From SS Serv Tfmr To US Serv Tfmr, Rev 10
Page 3 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1. Reviews the copy of 2OM-36.4.C, Transferring 4KV System From US Serv Tfmr To SS Serv Tfmr, provided.
1.1 Reviews 2OM-36.4.C.
COMMENTS:
SIMULATOR SETUP:
Initialize to an IC Set with all systems in NSA.
Set Trigger 1 to annunciate A7-8D SS SERV TFMR 2A/2B Thermal Overload when Live Bus Transfer Switch is taken to OFF after ACB 142A is closed.
Use Event Trigger 1:
Enter xc4o020r== 1 && xc4I014n== 0.
Enter command: IMF A7-8D-T2806D on Trigger 1 Note: xc4o020r is the red lamp for ACB142A and xc4I014n is the live bus transfer switch.
EVALUATOR NOTE: Provide the candidate a non place kept copy of 2OM-36.4.C. When candidate is ready to begin, ENSURE the simulator in RUN.
Following JPM performance, replace 2OM-36.4.AAS and 2OM-36.4.B procedures which will be used during this JPM.
Page 4 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 2.
Verify voltages on the 4KV Busses and SSSTs are approximately the same on all phases as follows:
- a. Places the 2A SS Serv Tfmr Voltmeter Phase selector switch to each of the phases of Bus 2A &
2B and compares the values on the 4KV Common Voltmeter to the same phase values on the 4KV Bus 2A & 2B Volt meters when 4KV Bus 2A
& 2B Voltmeter Phase Selector switches are selected to each phase.
- b. Perform Data Sheet 1 to check for an open primary circuit on SSST-2A.
2.1 Locates the 4KV Common Voltmeter, KV Bus 2B Voltmeter, and 2A SS Serv Tfmr Voltmeter Phase Selector Switch.
2.2 Checks all phases and verifies SSST 2A voltage is 0 to 2.0 volts higher than Bus 2B voltage, and the unloaded transformer secondary is between 122.5 volts and 126 volts. (as read on common voltmeter) 2.3 Records voltages on Data Sheet 1.
COMMENTS:
- 3.
Adjust SSST secondary voltage to 0 to 2 volts higher than respective 4KV bus volts for each bus being transferred.
12.1 If necessary, places Load Tap Changer X Winding Bus 2B SS Serv Tfrm 2A in MANUAL by pushing control switch IN and adjusts voltage as required.
COMMENTS:
EVALUATOR NOTE: Candidate needs to check only Bus 2B since the other Busses will NOT be transferred for this JPM.
EVALUATOR NOTE: The values specified in step 2.2 are identified in the note preceding the procedure step.
Page 5 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 4.C Place the Live Bus Transfer Switch to ON.
4.1C Places the Live Bus Transfer Switch to the ON position.
COMMENTS:
5.C Close ACB-142A, 2A SS Serv Tfmr to 4KV Bus 2B.
5.1C Places control switch for ACB-142A to the CLOSE position.
5.2 Verifies BOTH RED lights - LIT, WHITE light -
NOT LIT 5.3 Acknowledges A8-1H, 4160V NORM BUS SUPPLY ACBs PARALLELED, if received.
COMMENTS:
- 6. Check that amps increase on 4KV Bus 2B Tfmr 2A Amps.
6.1 Checks 4KV Bus 2B Tfmr 2A ammeter indicates greater than ZERO amps.
COMMENTS:
Page 6 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 7.C Open ACB-142C, 2C US Serv Tfmr to 4KV Bus 2B.
7.1C Places control switch for ACB-142C to the OPEN/TRIP position.
7.2 Verifies WHITE light - LIT, BOTH RED lights -
NOT LIT 7.3 Silences and resets Annunciator A8-1H, if cleared.
COMMENTS:
- 8.
Check load was picked up by observing 4KV Bus 2B Tfmr 2A Amps.
8.1 Checks load was picked up by observing 4KV Bus 2B Tfmr 2A amps increasing to a higher value.
COMMENTS:
- 9.
Place the Live Bus Transfer Switch to OFF.
9.1 Places the Live bus Transfer Switch to the OFF position.
COMMENTS:
FAULT STATEMENT Immediately after the Live Bus Transfer Switch is placed to OFF in the next step, a trigger will be inserted to annunciate SYS STA SERV TFMR 2A/2B Thermal Overload which requires the candidate to transfer 4KV Bus 2B from SSST 2A back to USST 2C.
Page 7 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 10.
Responds to receipt of A7-8D, SYS STA SERV TFMR 2A/2B Thermal Overload.
10.1 Acknowledges receipt of A7-8D, SS SERV TFMR 2A/2B Thermal Overload annunciator.
10.2 Observe control board indications and determines plant conditions are STABLE.
10.3 References 2OM-36.4.AAS (ARP for A7-8D) 10.4 Dispatches an NLO to verify 2A SSST winding temperature is high.
COMMENTS:
EVALUATOR CUE:
When dispatched, role play the NLO and report 2A SSST winding temperature is 110 ºC and slowly rising and that both banks of cooling are in service.
EVALUATOR CUE:
Role Play the US and if asked, direct the candidate to perform 2OM-36.4.B to transfer 4KV Bus 2B back to 2C USST as directed by the ARP.
Page 8 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 11.
Monitor the USST 2C Bus 2B voltages on the 4KV Common Voltmeter using the 2C US Serv Tfmr Voltmeter Phase Selector switch. Monitor the SSST 2B voltages on the 4KV Bus 2B voltmeter using the 4KV Bus 2B Voltmeter Phase Selector Switch.
11.1 Locates the 4KV Common Volts meter, 4KV Bus 2B Voltmeter Phase Selector, and 2C US Serv Tfmr Voltmeter Phase Selector Switch.
11.2 Checks all phases and verifies USST 2C voltage is within 0 to 2.0 volts of Bus 2B voltage and the unloaded bus is between 122 volts and 126.5 volts.
COMMENTS:
- 12.
If necessary, Place the Bus 2B 4160V Lower Raise & Auto SW, in Manual (Push In)
AND adjust Bus 2B voltage to match USST voltage.
12.2 Places Load Tap Changer X Winding Bus 2B SS Serv Tfrm 2A in MANUAL by pushing control switch IN.
12.2 Adjusts Bus 2B voltage to match 2C USST voltage by intermittently placing control switch handle to LOWER until 4KV Bus 2B volts matches 4KV Common Voltmeter Voltage.
COMMENTS:
13.C Verify the Live Bus Transfer Switch in the ON position.
13.1C Places the Live Bus Transfer Switch to the ON position.
COMMENTS:
EVALUATOR CUE:
If asked, DO NOT setup Bus 2B Auto Transfer, perform only up to step 8 of 2OM-36.4.B.
Page 9 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 14.C Close ACB-142C, 2C US Serv Tfmr to 4KV Bus 2B.
14.1C Places control switch for ACB-142C to the CLOSE position.
14.2 Verifies BOTH RED lights - LIT, WHITE light -
NOT LIT.
14.3 Acknowledges A8-1H, 4160V NORM BUS SUPPLY ACBs PARALLELED, if received.
COMMENTS:
- 15.
Verify amps increase on 4KV Bus 2B Tfmr 2C Amps.
15.1 Verifies 4KV BUS 2B TFMR 2C ammeter indicates greater than ZERO amps.
COMMENTS:
16.C Open ACB-142A, 2A SS Serv Tfmr to 4KV Bus 2B.
16.1C Places control switch for ACB-142A to the OPEN/TRIP position.
16.2 Verifies WHITE light - LIT, BOTH RED lights -
NOT LIT.
16.3 Silences & resets Annunciator A8-1H if cleared.
COMMENTS:
Page 10 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-523 JPM REVISION: 4 JPM TITLE: Perform a Hot Bus Transfer STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 17.
Verify load was picked up by observing 4KV Bus 2B Tfmr 2C Amps.
17.1 Verifies load was picked up by observing 4KV Bus 2B Tfmr 2C amps increasing to a higher value.
COMMENTS:
- 18.
Place the Live Bus Transfer Switch to OFF.
18.1 Places the Live Bus Transfer Switch to the OFF position.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: State This JPM is complete
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The plant is in Mode 1 with all systems in NSA.
It is desired to place 4KV Bus 2B on offsite power to allow for a relay check on ACB-142C.
INITIATING CUE:
Your supervisor directs you to transfer the 4KV Bus 2B to SSST 2A in accordance with 2OM-36.4.C, Transferring 4KV System From US Serv Tfmr To SS Serv Tfmr. Do NOT set up for auto transfer back to USST 2C.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Perform QPTR Alarm Test TRAINING MATERIAL NUMBER:
2CR-144 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2CR-144 REVISION NUMBER:
3 TECHNICAL
REFERENCES:
2OST-2.4, QPTR Alarm Check, Rev 11 INSTRUCTIONAL SETTING:
Simulator APPROXIMATE DURATION:
15 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2CR-144 New Revision: 3 Description of Change(s):
- 1. Updated TASK ID.
- 2.
Reason for Change (s):
- 1. TASK IDs changed.
Page 1 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test K/A
REFERENCE:
015A1.04 3.5/3.7 TASK ID:
0021-016-06-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID#:
Time Critical:
Yes Allotted Time:
15 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 10 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT" verified operable AND QPTR is calculated to be between 1.005 and 1.035.
RECOMMENDED STARTING LOCATION:
Simulator INITIAL CONDITIONS:
- The plant is at 100% equilibrium power.
- All systems are in normal system alignment.
- The PCS AFD Monitor is INOPERABLE.
INITIATING CUE:
Your supervisor directs you to perform a QPTR Alarm Check for N41 ONLY IAW 2OST-2.4, QPTR Alarm Check, step VII.B. All initial conditions and Test preparations have ALREADY been completed.
REFERENCES:
2OST-2.4, QPTR Alarm Check, Rev. 11 TOOLS:
None HANDOUT:
2OST-2.4, QPTR Alarm Check, Rev. 11 filled out up to step VII.B.
Include Normalization Factors on All Data Sheets.
Page 3 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1. Verify the following status lights are OFF: (Status Panel 308)
A-18, "RCS LOOP A OTT RUNBACK" B-18, "RCS LOOP B OTT RUNBACK" C-18, "RCS LOOP C OTT RUNBACK" A-20, "RCS LOOP A OTT RX TRIP" B-20, "RCS LOOP B OTT RX TRIP" C-20, "RCS LOOP C OTT RX TRIP" COMMENTS:
SIMULATOR SETUP:
100% Steady State Power.
Obtain Normalization factors from reactor Engineering book and record on applicable OST data sheets.
Page 4 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 2. Notify the SM/US to make an entry in the Narrative Log that the QPTR Alarm Check using Channel PRN41 is commencing AND Record the time of entry T.S. 3.3.1 2.1 Notifies the SM/US to make an entry in the Narrative Log that the QPTR Alarm Check using Channel PRN41 is commencing.
COMMENTS:
- 3. Remove the PRN-41 input from the PCS AFD Monitor Program by performing Attachment A, "Removing A Single Power Range Channel Input From The PCS AFD Monitor Program",
Part A, for PRN41. (N/A if PCS AFD Monitor is inoperable) 3.1 N/A COMMENTS:
4.C Place Power Range Channel N41 in the test configuration as follows:
Place the PRN41 Operation Selector Switch in DET A&B.
(N-41 Power Range B Drawer) 4.1C Rotates PRN41 Operation Selector Switch Clockwise to the DET A&B position.
COMMENTS:
- 5. Verify "CHANNEL ON TEST" Drawer Status Light is ON.
Verify Annunciator A4-6H, NIS CHANNEL ON TEST is ON.
5.1 Verifies "CHANNEL ON TEST" Drawer Status Light - LIT.
5.2 Verifies Annunciator A4-6H, NIS CHANNEL ON TEST - LIT.
COMMENTS:
EVALUATOR CUE:
Role-play the Shift manager and acknowledge the report.
EVALUATOR NOTE:
PCS AFD Monitor Program is INOPERABLE per initial conditions.
Page 5 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 6. Verify the following UPPER SECTION DEVIATION" AND "LOWER SECTION DEVIATION" Drawer Status Lights are OFF.
(Misc. Control And Indication Panel)
Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT", is OFF.
PCS Points Y0136D, "PR LOWER DET DEV/AUTO DEFEAT" AND Y0137D, "PR UPPER DET DEV/AUTO DEFEAT", indicate NORMAL.
6.1 Verifies
- UPPER SECTION DEVIATION" AND "LOWER SECTION DEVIATION" Drawer Status Lights -
NOT LIT.
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT" Lights -
NOT LIT.
- PCS Points Y0136D, "PR LOWER DET DEV/AUTO DEFEAT" AND Y0137D, "PR UPPER DET DEV/AUTO DEFEAT", indicates NORMAL.
(Selects Group Trends/Group List/OST 2.4)
COMMENTS:
7.C Record the upper and lower detector current meter indications for Power Range Channels PRN42, PRN43 and PRN44 on Data Sheet 1.
7.1C In the space provided on Data Sheet 1, records the upper and lower detector current meter indications for Power Range Channels PRN42, PRN43 and PRN44 COMMENTS:
8.C Perform the test using the Power Range Channel N41 Upper Detector as follows:
Turn PRN41 Detector A Test Signal Potentiometer clockwise until the "UPPER SECTION DEVIATION" Drawer Status Light is ON.
8.1C Slowly rotates PRN41 Detector A Test Signal Potentiometer clockwise until the "UPPER SECTION DEVIATION" Drawer Status Light is - LIT.
COMMENTS:
Page 6 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 9. Verify the following:
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT", is ON.
- PCS Point Y0137D, "PR UPPER DET DEV/AUTO DEFEAT", indicates ALARM.
9.1 Verifies
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT" Lights -
LIT.
- PCS Point Y0137D, "PR UPPER DET DEV/AUTO DEFEAT", indicates ALARM.
COMMENTS:
10.C Record the PRN41 Detector A current indication when the Status Light turns ON:
Detector A Current N41 Power Range B Drawer____________
microamperes 10.1C In the space provided in step 6 of the OST, records the PRN41 Detector A current indication when the Status Light turned ON.
COMMENTS:
11.C Turn the Test Signal Potentiometer fully counterclockwise.
11.1C Slowly rotates PRN41 Detector A Test Signal Potentiometer fully counterclockwise.
COMMENTS:
Page 7 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 12. Verify the following Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT", is OFF.
UPPER SECTION DEVIATION" Drawer Status Lights is OFF.
PCS Point Y0137D, " indicates NORMAL 12.1 Verifies:
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT" Lights -
NOT LIT.
- UPPER SECTION DEVIATION" Drawer Status Light - NOT LIT.
- PCS Point Y0137D, "PR UPPER DET DEV/AUTO DEFEAT", indicates NORMAL.
COMMENTS:
13.C Perform the test using the Power Range Channel N41 Lower Detector as follows:
Turn PRN41 Detector B Test Signal Potentiometer clockwise until the "LOWER SECTION DEVIATION" Drawer Status Light is ON.
13.1C Slowly rotates PRN41 Detector B Test Signal Potentiometer clockwise until the "LOWER SECTION DEVIATION" Drawer Status Light - LIT.
COMMENTS:
- 14. Verify the following:
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT", is ON.
- PCS Point Y0136D, "PR LOWER DET DEV/AUTO DEFEAT", indicates ALARM.
14.1 Verifies:
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT" Lights -
LIT.
- PCS Point Y0136D, "PR LOWER DET DEV/AUTO DEFEAT" indicates ALARM.
COMMENTS:
Page 8 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 15.C Record the PRN41 Detector B current indication when the Status Light turns ON:
Detector B Current N41 Power Range B Drawer____________
microamperes 15.1C In the space provided in step 7 of the OST, records the PRN41 Detector B current indication when the Status Light turned ON.
COMMENTS:
16.C Turn the Test Signal Potentiometer fully counterclockwise.
16.1C Slowly rotates PRN41 Detector B Test Signal Potentiometer fully counterclockwise.
COMMENTS:
- 17. Verify the following Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT", is OFF.
LOWER SECTION DEVIATION" Drawer Status Lights is OFF.
PCS Point Y0136D, " indicates NORMAL 17.1 Verifies:
- Annunciator A4-5H, "POWER RANGE HIGH/LOW SP FLUX DEVIATION/AUTO DEFEAT" Lights -
NOT LIT.
- LOWER SECTION DEVIATION" Drawer Status Light - NOT LIT.
- PCS Point Y0136D, "PR LOWER DET DEV/AUTO DEFEAT", indicates NORMAL.
COMMENTS:
Page 9 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 18.C Restore Power Range Channel N41 from the test configuration as follows:
Place the PRN41 Operation Selector Switch in NORMAL.
18.1C Rotates the PRN41 Operation Selector Switch counterclockwise to the NORMAL.
18.2 Requests second verification.
COMMENTS:
- 19. Verify "CHANNEL ON TEST" Drawer Status Light is OFF.
Verify Annunciator A4-6H, NIS CHANNEL ON TEST is OFF.
19.1 Verifies "CHANNEL ON TEST" Drawer Status Light - NOT LIT.
19.2 Verifies Annunciator A4-6H, NIS CHANNEL ON TEST - NOT LIT.
COMMENTS:
- 20. Restore the PRN41 input to the PCS AFD Monitor Program by performing Attachment A, "Removing A Single Power Range Channel Input From the PCS AFD Monitor Program",
Part B, for PRN41. (N/A if PCS AFD Monitor is inoperable) 20.1 N/A COMMENTS:
EVALUATOR CUE:
Role-play the Unit Supervisor and acknowledge the request. Report second verification completed SAT.
EVALUATOR NOTE:
PCS AFD Monitor Program is INOPERABLE per initial conditions.
Page 10 of 10 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2CR-144 JPM REVISION: 3 JPM TITLE: Perform QPTR Alarm Test STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 21.C Transfer the PRN41 recorded values AND Complete Data Sheet 1.
21.1 Transfers the PRN41 values recorded in steps 6 and 7 of the OST to Data Sheet 1.
21.2C Completes Data Sheet 1.
21.3 Requests second verification of calculations and Normalization factors.
COMMENTS:
STOP TIME: ___________________
TERMINATING CUE: Inform the candidate, This JPM is COMPLETE.
EVALUATOR CUE:
Role-play the Unit Supervisor and acknowledge the request.
EVALUATOR NOTE:
Evaluator discretion is required for the grading of the QPTR calculation. Refer to attached answer key for the calculations required in Data Sheet 1.
EVALUATOR CUE:
If subsequent JPMs are to be performed, escort the candidate to a secure location and complete calculational portion of this JPM.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
- The plant is at 100% equilibrium power.
- All systems are in normal system alignment.
- The PCS AFD Monitor is INOPERABLE.
INITIATING CUE:
Your supervisor directs you to perform a QPTR Alarm Check for N41 ONLY IAW 2OST-2.4, QPTR Alarm Check, step VII.B. All initial conditions and Test preparations have ALREADY been completed.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Control Aux Feedwater during Cable Vault & Rod Control Relay Room fire from Outside of the Control Room TRAINING MATERIAL NUMBER:
2PL-178 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2PL-178 REVISION NUMBER:
0 TECHNICAL
REFERENCES:
2OM-56B.4.CV6 rev. 0, Cable Vault & Rod Control Relay Room, Attachment 7 2OM-53A.1.A-1.11 Rev. 5, Manual Handpump Operation of Hydraulically Actuated Valves 2OM-24.4.Q Rev. 13, Response to Steam Binding or Depressurization in Auxiliary Feedwater System, pg. 39 INSTRUCTIONAL SETTING:
In-Plant APPROXIMATE DURATION:
15 Minutes PREPARED BY:
Andrew Jacques Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2PL-178 New Revision:
Description of Change(s):
Reason for Change (s):
Page 1 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-178 JPM REVISION: 0 JPM TITLE: Control Aux Feedwater during Cable Vault & Rod Control Relay Room fire from Outside of the Control Room.
K/A
REFERENCE:
061 A2.03 3.1/3.4 061 A2.04 3.4/3.8 TASK ID:
0241-014-01-043 0241-024-01-043 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
10 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 4 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
2FWE-P22 secured and 2FWE-HCV-100A closed.
RECOMMENDED STARTING LOCATION:
In-Plant INITIAL CONDITIONS:
The plant is tripped following a major fire in the Cable Vault & Rod Control Relay Room.
2OM-56B.4.CV6, Cable Vault & Rod Control Relay Room, is in progress.
2FWE-P23A,B, Motor Driven Auxiliary Feedwater Pumps, are stopped.
2FWE*P22, Turbine Driven Auxiliary Feedwater Pump, could not be secured from the control room.
2FWE*P22, Turbine Driven Auxiliary Feedwater Pump, is aligned to the A Auxiliary Feedwater Header.
2FWE-HCV100A, A Steam Generator Train A Auxiliary Feedwater Throttle Valve, failed to close from the Control Room.
MCC*2-E13 Cub 4D, 2FWE*HCV100A Breaker, has been opened.
INITIATING CUE:
- 1. The US directs you to stop 2FWE*P22, Turbine Driven Auxiliary Feedwater Pump, locally due to high A Steam Generator Water Level.
- 2. Once this is complete, you are to close 2FWE-HCV100A IAW 2OM-53A.1.A-1.11.
REFERENCES:
2OM-24.4.Q Rev. 13 Response to Steam Binding or Depressurization in Auxiliary Feedwater System.
2OM-53A.1.A-1.11 rev. 5, Manual Handpmp Operation of Hydraulically Actuate Valves.
TOOLS:
None HANDOUT:
2OM-53A.1.A-1.11 Rev. 5, Manual Handpmp Operation of Hydraulically Actuate Valves.
Hand out only if asked for procedural direction to trip 2FWE*P22 2OM-24.4.Q Rev. 13, Response to Steam Binding or Depressurization in Auxiliary Feedwater System, Page 39
Page 3 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-178 JPM REVISION: 0 JPM TITLE: Control Aux Feedwater during Cable Vault & Rod Control Relay Room fire from Outside of the Control Room.
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
1.C Secure [2FWE*P22],
Turbine Driven Auxiliary Feed Pump, by performing the following:
- a. Press the Emergency Trip Manual Lever.
1.1C Presses the 2FWE*TTV22 Emergency Trip Manual Lever. (DOWN) 1.2 Verifies that the pump shaft has stopped rotating.
1.3 Informs Control room that 2FWE*P22 is secured.
COMMENTS:
- 2.
Close [2FWE*HCV100C],
21C SG AFW Throttle Vlv, in accordance with 2OM-53A.1.A-1.11, Manual Handpump Operation of Hydraulically Operated Valves (South Safeguards 741).
2.1 Refers to 2OM-53A.1.A-1.11 to close 2FWE*HCV100A for the 21A Steam Generator.
COMMENTS:
EVALUATOR NOTE:
Provide candidate a copy of 2OM-24.4.Q page 39 if asked for procedural direction to trip 2FWE*P22.
EVALUATOR CUE:
The pump shaft has stopped rotating.
Role Play:
If called report from the CR that MCC*2-E13 Cub 4D is OPEN.
Page 4 of 4 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-178 JPM REVISION: 0 JPM TITLE: Control Aux Feedwater during Cable Vault & Rod Control Relay Room fire from Outside of the Control Room.
STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Step 4.c. To throttle closed a valve with a fail-as-is actuator, perform the following:
- 1) Place the Three Position Pump Control Valve in the CLOSE position.
- 2) Insert the pump handle into the hand-pump socket.
- 3) Pump the hand pump UNTIL the valve reaches the desired position, THEN stop.
- 4) IF valve will be left in its current position, THEN place Three Position Pump Control Valve in NEUT.
3.1C Locates and switches the three-position valve on 2FWE*HCV100A to the CLOSE position.
3.2C Inserts and pumps handle verifying valve stem is moving CLOSED as handle is pumped until valve is CLOSED.
3.3 Switches the three-position valve to NEUTRAL.
COMMENTS:
STOP TIME: ___________________
EVALUATOR CUE: State This JPM is complete.
EVALUATOR CUE: Valve is in CLOSE.
EVALUATOR CUE:
Valve stem is moving in the CLOSED direction and stops.
EVALUATOR CUE:
Valve is in NEUTRAL.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The plant is tripped following a major fire in the Cable Vault & Rod Control Relay Room.
2OM-56B.4.CV6, Cable Vault & Rod Control Relay Room, is in progress.
2FWE-P23A,B, Motor Driven Auxiliary Feedwater Pumps, are stopped.
2FWE*P22, Turbine Driven Auxiliary Feedwater Pump, could not be secured from the control room.
2FWE*P22, Turbine Driven Auxiliary Feedwater Pump, is aligned to the A Auxiliary Feedwater Header.
2FWE-HCV100A, A Steam Generator Train A Auxiliary Feedwater Throttle Valve, failed to close from the Control Room.
MCC*2-E13 Cub 4D, 2FWE*HCV100A Breaker, has been opened.
INITIATING CUE:
- 1. The US directs you to stop 2FWE*P22, Turbine Driven Auxiliary Feedwater Pump, locally due to high A Steam Generator Water Level.
- 2. Once this is complete, you are to close 2FWE-HCV100A IAW 2OM-53A.1.A-1.11.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE TRAINING MATERIAL TITLE:
Locally Startup the Containment Hydrogen Analyzers TRAINING MATERIAL NUMBER:
2PL-047 PROGRAM TITLE:
Licensed Operator Training COMPUTER CODE:
2PL-047 REVISION NUMBER:
7 TECHNICAL
REFERENCES:
2OM-46.4.F Rev 7 INSTRUCTIONAL SETTING:
In Plant APPROXIMATE DURATION:
15 Minutes PREPARED BY:
P. Eisenmann Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
OPERATIONS JOB PERFORMANCE MEASURE JPM CHANGE
SUMMARY
Affected JPM: 2PL-047 New Revision: 7 Description of Change(s):
- 1. Updated K/A.
- 2.
Reason for Change (s):
- 1. K/A Catalog revised to Rev 3.
- 2.
Page 1 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-047 JPM REVISION: 7 JPM TITLE: Locally Startup the Containment Hydrogen Analyzers K/A
REFERENCE:
028A1.01 3.2 TASK ID:
0461-012-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID #:
Time Critical:
Yes Allotted Time:
15 Minutes Actual Time:
minutes No JPM RESULTS: SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 7 OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Hydrogen Analyzer is powered up and sample pump is in operation.
RECOMMENDED STARTING LOCATION:
In plant INITIAL CONDITIONS:
The plant is in Mode 1. A Containment Hydrogen Concentration level for containment atmosphere has been requested, in support of an upcoming containment entry.
INITIATING CUE:
Your supervisor directs you to locally startup the non-protected train Containment Hydrogen Analyzer in accordance with 2OM-46.4.F, Containment Hydrogen Analyzer - Startup, and report back when it is in operation.
REFERENCES:
2OM-46.4.F Revision 7 TOOLS:
None HANDOUT:
2OM-46.4.F
Page 3 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-047 JPM REVISION: 7 JPM TITLE: Locally Startup the Containment Hydrogen Analyzers STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Reviews procedure 2OM-46.4.F.
1.1 Candidate reviews 2OM-46.4.F.
COMMENTS:
2.C Open containment isolation valves.
2.1.
Candidate locates and OPENS each of the following pairs of valves (or contacts the Control Room to have valves opened.):
2.2.C Train A Outlets [2HCS*SOV133A & 134A].
2.3.C Train A Inlets [2HCS*SOV136A & 136B].
OR 2.4.C Train B Outlets [2HCS*SOV133B & 134B].
2.5.C Train B Inlets [2HCS*SOV135A & 135B].
COMMENTS:
EVALUATOR CUE: Provide candidate a copy of 2OM-46.4.F.
Inform candidate of the protected train and that he/she is to start the NON-protected train analyzer.
EVALUATOR NOTE: There is one common control switch for each pair of valves listed. It is permissible to cue the candidate to contact the Control Room to perform this action instead of entering the CR.
Evaluate the direction provided to the Control Room Operator.
EVALUATOR CUE: Cue that appropriate NON-protected train valves are open and have red lights lit.
Only the NON-protected train valves need to be opened, N/A the Protected train valve JPM steps.
Page 4 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-047 JPM REVISION: 7 JPM TITLE: Locally Startup the Containment Hydrogen Analyzers STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 3.C Start [2HCS*PNL100A]
locally.
OR 3.C Start [2HCS*PNL100B]
locally.
3.1 Candidate locates and opens 2HCS*PNL100A (AE SWGR).
3.2.C Candidate locates and turns ON the OFF/ON Power switch.
3.3.C Candidate locates and places the Pump STOP/RUN/START switch to START and allows it to spring return to RUN.
3.4 Candidate locates and verifies red lights SV1 and SV6 LIT.
OR 3.1 Candidate locates and opens [2HCS*PNL100B] (DF SWGR).
3.2.C On keypad Press < 6,82,ENTER,1, ESC >
3.3.
Candidate locates and verifies red lights SV1 and SV6 LIT.
COMMENTS:
EVALUATOR NOTE: The Hydrogen Analyzer on the Non-Protected Train is to be started. N/A the analyzer not to be started. The candidate should notify the control room that Annunciator A1-2B HYDROGEN LEVEL HIGH/HIGH-HIGH may alarm then clear. Simulate control room response as needed.
EVALUATOR CUE: Panel door open.
EVALUATOR CUE: Panel lights energize.
EVALUATOR CUE: Pump RED light is lit.
EVALUATOR CUE: Both RED lights are lit.
EVALUATOR CUE: Panel door open.
EVALUATOR CUE: Acknowledge correct entries.
Pump Red Light Lit.
EVALUATOR CUE: Both RED lights are lit.
Page 5 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-047 JPM REVISION: 7 JPM TITLE: Locally Startup the Containment Hydrogen Analyzers STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 4.C At Control Panel, enter Pre-LOCA heat trace values.
4.1 Candidate locates Control Panel and indicates correct EEPROM keystrokes per procedure step IV.A.5:
4.2.C Enter monitor mode: Press <6>
4.3.C Enter access code: Press<82,ENTER>
4.4.C Select change: Press <3>
4.5.C Select calibration Array 6, Element 18: Press
<1,6,18,ENTER>
4.6.C Set Pre-LOCA ON setpoint to 89.6: Press
<896,ENTER,NXT, ESC>
4.7.C Select change: Press<3>
4.8.C Select calibration Array 5, Element 18: Press
<1,5,18,ENTER>
4.9.C Set Pre-LOCA OFF setpoint to 89.5: Press
<895,ENTER,NXT,ESC,ESC>
COMMENTS:
- 5. Report back to supervisor.
5.1 Candidate reports to supervisor that the containment hydrogen analyzer has been placed in operation locally.
COMMENTS:
EVALUATOR NOTE: EEPROM ? Appears.
EVALUATOR CUE: It is not necessary to start
[2HCS*HR100] at this time.
EVALUATOR NOTE: EEPROM ? Appears.
Page 6 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-047 JPM REVISION: 7 JPM TITLE: Locally Startup the Containment Hydrogen Analyzers STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U STOP TIME: ___________________
EVALUATOR CUE: State This JPM is complete.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
The plant is in Mode 1. A Containment Hydrogen Concentration level for containment atmosphere has been requested, in support of an upcoming containment entry.
INITIATING CUE:
Your supervisor directs you to locally startup the non-protected train Containment Hydrogen Analyzer in accordance with 2OM-46.4.F, Containment Hydrogen Analyzer - Startup, and report back when it is in operation.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.
OPERATIONS JOB PERFORMANCE MEASURE (JPM)
TRAINING MATERIAL TITLE:
Place the Diesel-Driven Air Compressor [2IAS-C21] in Service TRAINING MATERIAL NUMBER:
2PL-031 PROGRAM TITLE:
Operator Training COMPUTER CODE:
2PL-031 REVISION NUMBER:
7 TECHNICAL
REFERENCES:
2OM-34.4.P, Diesel-Driven Air Compressor [2IAS-C21] Operation, Rev. 4 INSTRUCTIONAL SETTING:
In-plant APPROXIMATE DURATION:
15 Minutes PREPARED BY:
Date PEER REVIEW BY:
Date APPROVED FOR USE:
Training Supervisor or Designee Date
JPM CHANGE
SUMMARY
Affected JPM: 2PL-031 New Rev. # 6 Description of Change(s):
Updated JPM to reflect current JPM procedure Reason for Change (s):
New JPM procedure
Page 1 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service K/A
REFERENCE:
065 AA1.04 3.5/3.4 TASK ID: 0341-009-01-012 JPM APPLICATION:
REQUALIFICATION INITIAL EXAM TRAINING SRO ONLY ALTERNATE PATH JPM ADMINISTRATIVE JPM EVALUATION METHOD:
LOCATION:
TYPE:
ADMINISTERED BY:
Perform Plant Site Annual Requal Exam BVT Simulate Simulator Initial Exam NRC Classroom Training Other:
Other:
EVALUATION RESULTS Performer Name:
Performer ID:
Time Critical:
Yes Allotted Time:
15 minutes Actual Time:
minutes No JPM RESULTS:
SAT UNSAT (Comments required for UNSAT evaluation)
Comments:
OBSERVERS Name/ID:
Name/ID:
Name/ID:
Name/ID:
EVALUATOR Evaluator (Print):
Date:
Evaluator Signature:
Page 2 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service OPERATIONS JOB PERFORMANCE MEASURE EVALUATOR DIRECTION SHEET TASK STANDARD:
Diesel-Driven Air Compressor, 2IAS-C21, placed in service supplying the station air header.
RECOMMENDED STARTING LOCATION:
In plant INITIAL CONDITIONS:
A loss of the station air compressors has occurred.
INITIATING CUE:
The US has authorized an emergency start of the diesel-driven air compressor and directed you to:
- Place 2IAS-C21, Diesel Driven Air Compressor, in service and align its discharge to the instrument air header by performing 2OM-34.4.P, Diesel-Driven Air Compressor 2IAS-C21 Operation, Step IV.A.
- Report back when the compressor is running and aligned.
REFERENCES:
2OM-34.4.P, Diesel-Driven Air Compressor [2IAS-C21] Operation, Rev. 5 TOOLS:
None HANDOUT:
2OM-34.4. P, Diesel-Driven Air Compressor [2IAS-C21] Operation.
Page 3 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U START TIME: ___________________
- 1.
Review procedure 2OM-34.4.P.
1.1 Candidate reviews procedure.
COMMENTS:
2.C Place the Load/Unload switch in the UNLOAD (down) position.
2.1C Places the Load/Unload switch in the UNLOAD (down) position.
COMMENTS:
3.C Place the Manual/Off Reset/Auto switch in MANUAL, and Check (after a 16 second delay) that the starter operates to crank the engine until 15 seconds has elapsed OR until the engine starts (whichever occurs first).
3.1C Places the Manual/Off Reset/Auto switch in MANUAL.
3.2 After 16 second pre-lube delay, verifies that the engine starts.
COMMENTS:
EVALUATOR CUE: Load/Unload switch in the UNLOAD (down) position.
EVALUATOR CUE: Provide candidate a copy of 2OM-34.4.P EVALUATOR CUE: Manual/Off/Reset/
Automatic switch in Manual.
EVALUATOR CUE: After a 16 second delay, the engine is running.
Page 4 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U 4.C After the engine has started, Place the [2IAS-C21] Diesel-driven Air Compressor Load/Unload switch in the LOAD (up) position.
4.1C Places the [2IAS-C21] Diesel-driven Air Compressor Load/Unload switch in the LOAD (up) position.
COMMENTS:
- 5.
Verify 2HVT-FN229F, Power Roof Ventilator, is operating by verifying the fan louvers are open and the fan is rotating (located above the compressor).
5.1 Verifies 2HVT-FN229F, Power Roof Ventilator, is operating by verifying the fan louvers are open and the fan is rotating.
COMMENTS:
EVALUATOR CUE: Load/Unload switch in the LOAD (up) position.
EVALUATOR CUE: Louvers are open and fan is rotating.
EVALUATOR NOTE: Roof fan is located above the compressor.
Page 5 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 6.
When engine has started and warmed up (for approximately 45 seconds), Check that the compressor loads until pressure at the compressor discharge pressure is approximately 110 psig on 2IAS-PI131, Discharge Pressure.
(Compressor Instrument Panel) 6.1 Checks compressor discharge pressure 2IAS-PI131 slowly rises and then stabilizes at ~110 psig.
COMMENTS:
- 7.
Verify 2IAS-DRY23, Standby Instrument Air Train Dryer, is running (green Power On light is On).
7.1 Verifies 2IAS-DRY23, Standby Instrument Air Train Dryer, is running (GREEN Power On light is LIT).
COMMENTS:
- 8.
If the fire protection automatic shutdown function is not available, establish a Fire Watch at 2IAS-C21 while the compressor is operating.
8.1 Determines fire protection panel automatic shutdown is not functional.
8.2 Contacts the US and reports that a Fire Watch at 2IAS-C21 is required while the compressor is running.
COMMENTS:
EVALUATOR CUE: 2IAS-PI131 slowly rises and is now stable at 108 psig EVALUATOR CUE: Green Power On light LIT.
EVALUATOR CUE: When candidate locates fire protection panel, Inform Candidate that fire protection panel is not functional.
EVALUATOR CUE: Role-play the US and acknowledge the report and report back that another operator will perform the required fire watch.
Page 6 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service STEP
( "C" Denotes CRITICAL STEP )
STANDARD (Indicate "S" FOR SAT or "U" FOR UNSAT)
S/U
- 9.
If desired, Verify alignment of 2IAS-C21 to the Instrument Air Header as follows:
- a. Verify pressure is being maintained 100psig on 2IAS-PI129, located on the side of 2IAS-TK22.
- b. Verify Open 2IAS-1125, 2IAS-DRY23 Inlet Isolation, located on dryer skid.
- c. Verify Open 2IAS-1126, 2IAS-DRY23 Outlet Isolation, located on dryer skid.
- d. Verify Open [2IAS-1073],
Standby Instrument Air Train Receiver 2IAS-TK22 Inlet Isolation.
- e. Verify Open [2IAS-1074],
Standby Instrument Air Train Receiver 2IAS-TK22Outlet Isolation.
- f. Verify Open [2IAS-1106],
Standby Instrument Air Train Inlet Isolation, located in the Turbine Basement above
[2IAS-DRY22].
9.1 Verifies pressure is being maintained 100psig on 2IAS-PI129.
9.2 Verifies handle for 2IAS-1125 2IAS-DRY23 Inlet Isolation is parallel to the flowpath.
9.3 Verifies handle for 2IAS-1126 2IAS-DRY23 Outlet Isolation is parallel to the flowpath.
9.4 Verifies handle for 2IAS-1073, Standby Instrument Air Train Receiver is parallel to the flowpath.
9.5 Verifies handle for [2IAS-1074], Standby Instrument Air Train Receiver is parallel to the flowpath.
9.6 Verifies handle for 2IAS-1106, Standby Instrument Air Train Inlet Isolation is parallel to the flowpath (2IAS-1106 located in Turbine Basement).
COMMENTS:
EVALUATOR CUE: 2IAS-1074 handle is parallel to the flowpath.
EVALUATOR CUE: [2IAS-PI129] is indicating 108 psig and stable.
EVALUATOR CUE: 2IAS-1125 handle is parallel to the flowpath.
EVALUATOR CUE: 2IAS-1126 handle is parallel to the flowpath.
EVALUATOR CUE: 2IAS-1073 handle is parallel to the flowpath.
EVALUATOR CUE: 2IAS-1106 handle is parallel to the flowpath.
Page 7 of 7 OPERATIONS JOB PERFORMANCE MEASURE JPM NUMBER: 2PL-031 JPM REVISION: 6 JPM TITLE: Place the Diesel-Driven Air Compressor [2IAS-C21] in Service STOP TIME: ___________________
EVALUATOR CUE: That completes this JPM.
CANDIDATE DIRECTION SHEET
- THIS SHEET TO BE GIVEN TO CANDIDATE
- Read:
INITIAL CONDITIONS:
A loss of the station air compressors has occurred.
INITIATING CUE:
The US has authorized an emergency start of the diesel-driven air compressor and directed you to:
- Place 2IAS-C21, Diesel Driven Air Compressor, in service and align its discharge to the instrument air header by performing 2OM-34.4.P, Diesel-Driven Air Compressor 2IAS-C21 Operation, Step IV.A.
- Report back when the compressor is running and aligned.
At this time, ask the evaluator any questions you have on this JPM.
When satisfied that you understand the assigned task, announce "I am now beginning the JPM".
Simulate performance or perform as directed the required task.
Point to any indicator or component you verify or check and announce your observations.
After determining the Task has been met announce "I have completed the JPM".
Then hand this sheet to the evaluator.