Beaver Valley Unit 1 Exam Outline Comments Addition errors on Form ES-301-5 pages 3 and 4. SROI-1 had 17 I/C malfunctions instead of
- 18. SROU-2 had three TS calls instead of two. The licensee will correct the error.
Scenario 2 did not contain two malfunctions that had not been used in the previous two exams scenarios. (Scenario 2 had 11 malfunctions listed and only Event 5 had not be used in the previous two exams.) The licensee corrected this oversight by replacing Event 10 with a previously un-used malfunction.
ES-301 Operating Test Review Worksheet Form ES-301-7 Facility: Beaver Valley Unit 1 (RO JPMs - See Draft Op Test Outlines for Titles) Exam Date: 3/1/21 - 3/5/21 1
2 3
Attributes 4
Job Content 5
6 Admin JPMs ADMIN Topic and K/A LOD (1-5)
U/E/S Explanation I/C Cues Critical Scope Overlap Perf.
Key Minutia Job Link Focus Steps (N/B)
Std.
A1R (1 CO) 2.1.43 3
X E
Add reason in cue for clarity to meet TS.
A2R (1 CO) 2.1.23 3
X E
Correct rod reactivity defect for accuracy.
A3R (2 EC) 2.2.37 3
X E
Add note that some steps may not be needed for TS A4R (1 RC) 2.3.11 3
X E
Fix minor typos on RWDA-G handout.
1 Simulator/In-Plant Safety Function and K/A JPMs S1 SF 1 004 A2.14 3
S S2 SF 2 011 A2.07 3
X X
E Change KA. Clarify standard for flow to VCT.
S3 SF 3 009 EA1.13 3
X E
Add note for possible implementation variance.
S4 SF 4P 003 A2.02 3
S S5** SF 5 026 A3.01 3
S6 SF 6 064 A4.06 3
S S7 SF 4S E05 EA2.2 3
X E
Delete step 5.4 and re-number following steps.
S8 SF 7 016 K1.03 3
S P1 SF 6 064 K4.02 3
X E
Step 8 cue local actions. Clarify resetting DG alarm.
P2 SF 7 012 A4.04 2
X E
Add cue about B/S typo (procedure vs label).
P3 SF 4S 061 A2.04 3
X E
Enhance cue for step 5 for resetting TDAFWP.
ES-301 2
Form ES-301-7 Note:
- Indicates SROU JPM. ** Indicates RO-only.
Facility: Beaver Valley Unit 1 (SROI/SROU JPMs - See Draft Op Test Outlines for Titles) Exam Date: 3/1/21 - 3/5/21 1
2 3
Attributes 4
Job Content 5
6 Admin JPMs ADMIN Topic and K/A LOD (1-5)
U/E/S Explanation I/C Cues Critical Scope Overlap Perf.
Key Minutia Job Link Focus Steps (N/B)
Std.
A1S (CO) 2.1.34 3
X E
Enlarge answer box on direction sheet.
A2S (CO) 2.1.23 3
X E
Correct rod reactivity defect for accuracy.
A3S (EC) 2.2.17 3
S A4S (RC) 2.3.11 3
X E
Typo - filling not filing.
A5S (EP) 2.4.40 3
X E
For clarify, have an SAE without a rad release.
1 Simulator/In-Plant Safety Function and K/A JPMs S1* SF 1 004 A2.14 3
See comments on RO JPMs above S2 SF 2 011 A2.07 3
See comments on RO JPMs above.
S3* SF 3 009 EA1.13 3
See comments on RO JPMs above.
S4 SF 4P 003 A2.02 3
See comments on RO JPMs above.
S6 SF 6 064 A4.06 3
See comments on RO JPMs above.
S7 SF 4S E05 EA2.2 3
See comments on RO JPMs above.
S8* SF 7 016 K1.03 3
See comments on RO JPMs above P1* SF 6 064 K4.02 3
See comments on RO JPMs above.
P2 SF 7 012 A4.04 2
See comments on RO JPMs above.
P3* SF 4S 061 A2.04 3
See comments on RO JPMs above.
ES-301 3
Form ES-301-7 Instructions for Completing This Table:
Check or mark any item(s) requiring a comment and explain the issue in the space provided using the guide below.
- 1.
Check each JPM for appropriate administrative topic requirements (COO, EC, Rad, and EP) or safety function requirements and corresponding K/A. Mark in column 1.
(ES-301, D.3 and D.4)
- 2.
Determine the level of difficulty (LOD) using an established 1-5 rating scale. Levels 1 and 5 represent an inappropriate (low or high) discriminatory level for the license that is being tested. Mark in column 2 (Appendix D, C.1.f)
- 3.
In column 3, Attributes, check the appropriate box when an attribute is not met:
The initial conditions and/or initiating cue is clear to ensure the operator understands the task and how to begin. (Appendix C, B.4)
The JPM contains appropriate cues that clearly indicate when they should be provided to the examinee. Cues are objective and not leading. (Appendix C, D.1)
All critical steps (elements) are properly identified.
The scope of the task is not too narrow (N) or too broad (B).
Excessive overlap does not occur with other parts of the operating test or written examination. (ES-301, D.1.a, and ES-301, D.2.a)
The task performance standard clearly describes the expected outcome (i.e., end state). Each performance step identifies a standard for successful completion of the step.
A valid marked up key was provided (e.g., graph interpretation, initialed steps for handouts).
- 4.
For column 4, Job Content, check the appropriate box if the job content flaw does not meet the following elements:
Topics are linked to the job content (e.g., not a disguised task, task required in real job).
The JPM has meaningful performance requirements that will provide a legitimate basis for evaluating the applicant's understanding and ability to safely operate the plant. (ES-301, D.2.c)
- 5.
Based on the reviewers judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)nhancement, or (S)atisfactory? Mark the answer in column 5.
- 6.
In column 6, provide a brief description of any (U)nacceptable or (E)nhancement rating from column 5.
Save initial review comments and detail subsequent comment resolution so that each exam-bound JPM is marked by a (S)atisfactory resolution on this form.
ES-301 4
Form ES-301-7 Facility: Beaver Valley Unit 1 (See D-1 Forms for Details) Scenario: 1 Exam Date: 3/1/21 - 3/5/21 1
2 3
4 5
6 7
8 9
10 Event Realism/Cred.
Required Actions Verifiable actions LOD TS CTs Scen.
Overlap U/E/S Explanation 1
X X
S 2
X S
3 X
X E
Delay FRV oscillation for two minutes to better assess BOP and crew interactions..
4 S
5 S
6 S
7 X
X S
8 X
X U
Add minimum flow rate (375 gpm) for objective criteria for CT.
9 X
X E
Add note about when SBLOCA occurs for examiner info.
10 S
10 0
0 0
3 3
5 E
ES-301 5
Form ES-301-7 Facility: Beaver Valley Unit 1 (See D-1 Forms for Details) Scenario: 2 Exam Date: 3/1/21 - 3/5/21 1
2 3
4 5
6 7
8 9
10 Event Realism/Cred.
Required Actions Verifiable actions LOD TS CTs Scen.
Overlap U/E/S Explanation 1
X X
S 2
X X
S 3
X X
U Delete TS 3.3.1 Function 17.b as it is not applicable.
4 X
S 5
S 6
X E
Add note for booth operator to direct Rx trip at 88% is crew misses high turbine vibs.
7 X
X S
8 X
X S
9 X
S 10 S
11 X
X S
11 0
0 0
3 3
2 E
ES-301 6
Form ES-301-7 Facility: Beaver Valley Unit 1 (See D-1 Forms for Details) Scenario: 3 Exam Date: 3/1/21 - 3/5/21 1
2 3
4 5
6 7
8 9
10 Event Realism/Cred.
Required Actions Verifiable actions LOD TS CTs Scen.
Overlap U/E/S Explanation 1
X S
2 S
3 X
E Enhance turnover to emphasize completion of this normal evolution.
4 X
S 5
S 6
X X
S 7
X S
8 X
S 9
X S
10 S
11 E
Add FR-P.1 actions if Red Path occurs.
11 0
0 0
2 3
8 E
ES-301 7
Form ES-301-7 Facility: Beaver Valley Unit 1 (See D-1 Forms for Details) Scenario: 4 Exam Date: 3/1/21 - 3/5/21 1
2 3
4 5
6 7
8 9
10 Event Realism/Cred.
Required Actions Verifiable actions LOD TS CTs Scen.
Overlap U/E/S Explanation 1
S 2
X X
S 3
X S
4 E
Typo - BAT pump 2A vs 2B.
5 X
E Typo - Valve 535 vs 537. Add note that crew may manually initiate SI.
6 S
7 X
X U
Typo - A vs B ASD valve. Add write up and criteria for CT-19 in D-2.
8 X
X E
C/D to occur via condenser vs ASDV.
9 X
X S
9 0
0 0
3 3
5 E
ES-301 8
Form ES-301-7 Facility: Beaver Valley Unit 1 (See D-1 Forms for Details) Scenario: 5 Exam Date: 3/1/21 - 3/5/21 1
2 3
4 5
6 7
8 9
10 Event Realism/Cred.
Required Actions Verifiable actions LOD TS CTs Scen.
Overlap U/E/S Explanation 1
S 2
X S
3 X
S 4
X S
5 E
Add notes when event occurs and that RCP A will trip on the loss of the bus.
6 X
E Pg 11 - remove secondary radiation. Pg 17/18 - add note for optional termination by lead evaluator. Pg.11 - #2 EDG running vs both.
7 X
S 8
X S
9 S
9 0
0 0
2 3
8 E
ES-301 9
Form ES-301-7 Instructions for Completing This Table:
Use this table for each scenario for evaluation.
2 Check this box if the events are not related (e.g., seismic event followed by a pipe rupture) OR if the events do not obey the laws of physics and thermodynamics.
3, 4 In columns 3 and 4, check the box if there is no verifiable or required action, as applicable. Examples of required actions are as follows: (ES-301, D.5f) opening, closing, and throttling valves starting and stopping equipment raising and lowering level, flow, and pressure making decisions and giving directions acknowledging or verifying key alarms and automatic actions (Uncomplicated events that require no operator action beyond this should not be included on the operating test unless they are necessary to set the stage for subsequent events. (Appendix D, B.3).)
5 Check this box if the level of difficulty is not appropriate.
6 Check this box if the event has a TS.
7 Check this box if the event has a critical task (CT). If the same CT covers more than one event, check the event where the CT started only.
8 Check this box if the event overlaps with another event on any of the last two NRC examinations. (Appendix D, C.1.f) 9 Based on the reviewers judgment, is the event as written (U)nacceptable (requiring repair or replacement), in need of (E)nhancement, or (S)atisfactory? Mark the answer in column 9.
10 Record any explanations of the events here.
In the shaded boxes, sum the number of check marks in each column.
In column 1, sum the number of events.
In columns 2-4, record the total number of check marks for each column.
In column 5, based on the reviewer's judgement, place a checkmark only if the scenario's LOD is not appropriate.
In column 6, TS are required to be 2 for each scenario. (ES-301, D.5.d)
In column 7, preidentified CTs should be 2 for each scenario. (Appendix D; ES-301, D.5.d; ES-301-4)
In column 8, record the number of events not used on the two previous NRC initial licensing exams. A scenario is considered unsatisfactory if there is < 2 new events. (ES-301, D.5.b; Appendix D, C.1.f)
In column 9, record whether the scenario as written (U)nacceptable, in need of (E)nhancement, or (S)atisfactory from column 11 of the simulator scenario table.
ES-301 10 Form ES-301-7 Facility: Beaver Valley Unit 1 Exam Date: 3/5/21 - 3/5/21 Scenario 1
2 3
4 5
6 7
8 11 Event Totals Events Unsat.
TS Total TS Unsat.
% Unsat.
Scenario Elements U/E/S Explanation 1
10 0
3 0
3 1
6.25 E
See Scenario 1 above for UNSAT explanations.
2 11 0
3 1
3 0
5.88 E
See Scenario 2 above for UNSAT explanations.
3 11 0
2 0
3 0
0.0 E
See Scenario 3 above for UNSAT explanations.
4 9
0 3
0 3
1 6.67 E
See Scenario 4 above for UNSAT explanations.
5 9
0 2
0 3
0 0.0 E
See Scenario 5 above for UNSAT explanations.
Instructions for Completing This Table:
Check or mark any item(s) requiring comment and explain the issue in the space provided.
1, 3, 5 For each simulator scenario, enter the total number of events (column 1), TS entries/actions (column 3), and CTs (column 5).
This number should match the respective scenario from the event-based scenario tables (the sum from columns 1, 6, and 7, respectively).
2, 4, 6 For each simulator scenario, evaluate each event, TS, and CT as (S)atisfactory, (E)nhance, or (U)nsatisfactory based on the following criteria:
- a.
Events. Each event is described on a Form ES-D-2, including all switch manipulations, pertinent alarms, and verifiable actions. Event actions are balanced between at-the-controls and balance-of-plant applicants during the scenario. All event-related attributes on Form ES-301-4 are met. Enter the total number of unsatisfactory events in column 2.
- b.
TS. A scenario includes at least two TS entries/actions across at least two different events. TS entries and actions are detailed on Form ES-D-2. Enter the total number of unsatisfactory TS entries/actions in column 4. (ES-301, D.5d)
- c.
CT. Check that a scenario includes at least two preidentified CTs. This criterion is a target quantitative attribute, not an absolute minimum requirement. Check that each CT is explicitly bounded on Form ES-D-2 with measurable performance standards (see Appendix D). Enter the total number of unsatisfactory CTs in column 6.
7 In column 7, calculate the percentage of unsatisfactory scenario elements:
8 If the value in column 7 is > 20%, mark the scenario as (U)nsatisfactory in column 8. If column 7 is 20%, annotate with (E)nhancement or (S)atisfactory.
9 In column 9, explain each unsatisfactory event, TS, and CT. Editorial comments can also be added here.
Save initial review comments and detail subsequent comment resolution so that each exam-bound scenario is marked by a (S)atisfactory resolution on this form.
2 + 4 + 6 1 + 3 + 5100%
ES-301 11 Form ES-301-7 Site name: Beaver Valley Unit 1 Exam Date: 3/1/21 - 3/5/21 OPERATING TEST TOTALS Total Total Unsat.
Total Total Unsat.
Explanation Edits Sat.
Admin.
JPMs 9
0 8
1 Sim./In-Plant JPMs 11 0
6 5
Scenarios 5
0 5
0 Op. Test Totals:
25 0
19 6
0.0 Licensee incorporate all NRC comments in the final version of the op test.
Instructions for Completing This Table:
Update data for this table from quality reviews and totals in the previous tables and then calculate the percentage of total items that are unsatisfactory and give an explanation in the space provided.
- 1.
Enter the total number of items submitted for the operating test in the Total column. For example, if nine administrative JPMs were submitted, enter 9 in the Total items column for administrative JPMs.
For scenarios, enter the total number of simulator scenarios.
- 2.
Enter the total number of (U)nsatisfactory JPMs and scenarios from the two JPMs column 5 and simulator scenarios column 8 in the previous tables. Provide an explanation in the space provided.
- 3.
Enter totals for (E)nhancements needed and (S)atisfactory JPMs and scenarios from the previous tables. This task is for tracking only.
- 4.
Total each column and enter the amounts in the Op. Test Totals row.
- 5.
Calculate the percentage of the operating test that is (U)nsatisfactory (Op. Test Total Unsat.)/(Op. Test Total) and place this value in the bolded % Unsat. cell.
Refer to ES-501, E.3.a, to rate the overall operating test as follows:
- satisfactory, if the Op. Test Total % Unsat. is 20%
- unsatisfactory, if Op. Test Total % Unsat. is > 20%
- 6.
Update this table and the tables above with post-exam changes if the as-administered operating test required content changes, including the following:
- The JPM performance standards were incorrect.
- The administrative JPM tasks/keys were incorrect.
- CTs were incorrect in the scenarios (not including postscenario critical tasks defined in Appendix D).
- The EOP strategy was incorrect in a scenario(s).
- TS entries/actions were determined to be incorrect in a scenario(s).