IR 05000382/2022003
| ML23005A086 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/05/2023 |
| From: | John Dixon NRC/RGN-IV/DORS/PBD |
| To: | Ferrick J Entergy Operations |
| Shared Package | |
| ML23005A092 | List: |
| References | |
| IR 2022003 | |
| Download: ML23005A086 (13) | |
Text
January 05, 2023
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVISED INTEGRATED INSPECTION REPORT 05000382/2022003
Dear John Ferrick:
On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3. The results of this inspection were originally issued in a report, dated November 1, 2022 (Agencywide Document Access and Management Systems (ADAMS) Accession No. ML22300A103).
The NRC staff subsequently determined that two inspections were recorded in the incorrect subsection of the inspection procedure. This error was due to an administrative oversight; the appropriate inspection was completed in accordance with the respective inspection procedure.
The 71111.01 inspection sample completed on August 31, 2022, was inspecting external flooding, not seasonal extreme weather. The 71114.06 inspection sample completed on September 13, 2022, was inspecting a full site drill, not a limited-scope training exercise for licensed operators. Both inspection samples are now in the correct subsection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr, Chief Projects Branch D Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38 Signed by Dixon, John on 01/05/23
Enclosure:
As stated
Inspection Report
Docket Number:
05000382
License Number:
Report Number:
Enterprise Identifier:
I-2022-003-0007
Licensee:
Entergy Operations, Inc.
Facility:
Waterford Steam Electric Station, Unit 3
Location:
Killona, LA 70057
Inspection Dates:
July 1, 2022, to September 30, 2022
Inspectors:
D. Childs, Resident Inspector
T. Farina, Senior Operations Engineer
A. Patz, Senior Resident Inspector
Approved By:
John L. Dixon, Jr, Chief
Projects Branch D
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 3 began the inspection period at rated thermal power and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
External Flooding Sample (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems against external flooding from heavy rains and severe weather due to the potential for hurricane development on August 31, 2022.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)emergency feedwater system trains A, B, and AB during and following maintenance on emergency feedwater pump B on July 28, 2022 (2)emergency diesel generator system train B while train A was inoperable during surveillance testing on September 6, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)fire area RAB 2-002, elevation +46.00' reactor auxiliary building main steam isolation valve passage and fire area RAB 3A-003, elevation +21.00' reactor auxiliary building vestibule on July 6, 2022 (2)fire area RAB 32-001, elevation -35.00' auxiliary component cooling water room and pipe penetration area on July 18, 2022 (3)fire area RAB 8B-001, elevation +21.00' reactor auxiliary building switchgear room B on August 12, 2022 (4)fire area RAB 17-001, elevation +21.00' reactor auxiliary building component cooling water pump B room, and fire area RAB 21-001, elevation +21.00' reactor auxiliary building component cooling water heat exchanger B room, on September 1, 2022 (5)fire area RAB 8A-001, elevation +21.00' reactor auxiliary building switchgear room A on September 2, 2022 (6)fire area RAB 25-001, elevation +21.00' reactor auxiliary building decon area on September 27, 2022
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) elevation +21.00' component cooling water pump and heat exchanger areas on September 1, 2022
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
- (1) The inspector reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exams administered on August 30, 2022.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator simulator training on September 20, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
(1)engineered safety features actuation system train B following auxiliary component cooling water pump B failure to start during testing on September 21, 2022 (2)control room air handling system train B following failure of an electric relay on September 30, 2022
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)elevated green risk for motor-driven emergency feedwater pump B outage during the week of July 25, 2022 (2)planned yellow risk due to low-pressure safety injection and containment spray train B outages during the week of August 8, 2022 (3)elevated green risk due to unexpected plant protection system power supply failure during the week of September 6, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
(1)component cooling water system following identification of inleakage on July 28, 2022 (2)reactor trip circuit breakers following surveillance failure on August 5, 2022 (3)feedwater ultrasonic flow meter following erratic indication and repair difficulties on September 8, 2022 (4)containment fan cooler train B following loss of motor control center 317B on September 22, 2022 (5)offsite power following automatic isolation of west switchyard bus on September 29, 2022
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
(1)emergency feedwater pump A after planned maintenance on the motor on July 6, 2022 (2)emergency feedwater pump B after planned maintenance on July 28, 2022 (3)low-pressure safety injection train A header to reactor coolant loop 2A flow control valve SI-139A following planned maintenance on August 9, 2022 (4)containment spray train A header isolation valve CS-125A following planned solenoid replacements on August 11, 2022 (5)component cooling water pump B following corrective maintenance on August 18, 2022 (6)plant stack wide range radiation monitor following identification of incorrect reference values on September 9, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (2 Samples)
(1)dry cooling tower A diesel driven sump pump surveillance testing on August 31, 2022
- (2) containment spray pump surveillance testing on September 29, 2022
Inservice Testing (IP Section 03.01) (1 Sample)
(1)steam generator 2 atmospheric dump valve inservice testing on July 21, 2022
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
The inspectors evaluated:
(1)a full site integrated drill for a simulated site area emergency on September 13,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS08: Heat Removal Systems (IP Section 02.07)===
- (1) Unit 3 (July 1, 2021, through June 30, 2022)
MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)
- (1) Unit 3 (July 1, 2021, through June 30, 2022)
MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)
- (1) Unit 3 (July 1, 2021, through June 30, 2022)
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensees corrective action program and maintenance rule tracking program for potential adverse trends in radiation monitor equipment performance and corrective actions that might be indicative of a more significant safety issue.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On August 30, 2022, the inspectors presented the 71111.11A ARQ exit inspection results to Van Ford, Superintendent, Operations Training, and other members of the licensee staff.
On October 18, 2022, the inspectors presented the integrated inspection results to John Ferrick and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Engineering
Evaluations
Flood Hazard Reevaluation Report
07/21/2015
Procedures
OP-901-521
Severe Weather and Flooding
340
OP-009-002
360
Procedures
OP-009-003
Emergency Feedwater
2
Calculations
ECF91-010
Combustible Loading Calculation for Fire Area RAB 8
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
22-05705
RAB 17-001
Component Cooling Water Heat Exchanger B Fire Plan
RAB 2-002
Main Steam Isolation Valve Passage
RAB 21-001
Component Cooling Water Pump B Fire Plan
RAB 25-001
RAB +21 Decon Area
RAB 32-001
Auxiliary Component Cooling Water Room & Pipe
Penetration Area
Vestibule
Switchgear Room A
Fire Plans
Reactor Auxiliary Building +21.00' elevation
TCP 22-110
Transient Combustible Permit for Fire Area RAB 8
04/11/2022
Miscellaneous
TCP 22-116
Transient Combustible Permit for Fire Zone RAB 8A
04/18/2022
Control of Combustibles
Control of Combustibles
Procedures
MM-006-106
Plant Door Maintenance
335
Work Orders
2969317
Calculations
MNQ3-5
Flooding Analysis Outside Containment
Miscellaneous
N/A
22 Annual NRC Operating Test Results
08/29/2022
Operations Training Program Description
OP-902-000
Standard Post Trip Actions
Procedures
OP-902-003
Loss of Offsite Power / Loss of Forced Circulation
CR-WF3-YYYY-
NNNN
22-1562, 2022-3627
Corrective Action
Documents
WF3-CR-YYYY-
22-04666
06/15/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
XXXX
SD-CC
Component Cooling Water
SD-PPS
Plant Protection System
Miscellaneous
W3-DBD-38
Safety Related HVAC - Control Room
2
EN-FAP-LI-001
Performance Improvement Review Group (PRG) Process
Corrective Action Program
Causal Evaluation Process
Procedures
OP-903-068
Emergency Diesel Generator and Subgroup Relay
Operability Verification
26
Corrective Action
Documents
CR-WF3-YYYY-
XXXXX
22-06304
09/06/2022
Tagout : 2022-0106-LPSI Pump A
08/09/2022
Tagout: 2022-0107-CS Train A
08/09/2022
Miscellaneous
Tagout: 2022-0108-
0809/2022
Procedures
Protected Equipment Postings
2980548, 52988875
Work Orders
09/06/2022
Corrective Action
Documents
CR-WF3-YYYY-
XXXXX
22-5674
08/05/2022
Engineering
Changes
ER-W3-2002-
0519-000
Install Software to Improve Path Reliability on LEFM
10/31/2002
DES-I-018
Feedwater Flow Measurement Instrumentation Specification
for Main Feedwater System
DES-I-018
Feedwater Flow Measurement Instrumentation Specification
for Main Feedwater System
Miscellaneous
Technical
Requirements
Manual 0
Technical Requirements Manual - Amendment 17
177
ME-004-330
4kV Induction Motor Maintenance
304
ME-007-008
Motor Operated Valves
MI-004-644
Testing of Solenoid Valves
Procedures
OP-903-050
Component Cooling Water and Auxiliary Component Cooling
Water Pump and Valve Operability Test
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP-903-121
Safety Systems Quarterly IST Valve Tests
2988875
WO 2952762, 52980548
Work Orders
WO 2946634, 52953000, 52946634, 53006370
08/17/2022
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
2019-3025, 2019-3164, 2020-5920, 2020-6021, 2020-7200,
21-0344, 2022-1819, 2022-4487
Operability Input to CR-WF3-2020-6021
10/25/2020
Rebaseline MS-116B
01/25/2021
Engineering
Changes
ECM97-059
Design Basis Review for Atmospheric Dump Valves MS-
116A and MS-116B
001
CEP-IST-4
Standard on Inservice Testing
311
ECS09-005
Air Operated Valves - Design Basis Accident Times
001
OP-100-014
Technical Specification and Technical Requirements
Compliance
364
OP-903-035
Containment Spray Pump Operability Check
OP-903-120
Containment and Miscellaneous Systems Quarterly IST
Valve Tests
035
SEP-WF3-IST-1
WF3 Inservice Testing Bases Document
010
SEP-WF3-IST-2
WF3 Inservice Testing Plan
011
Procedures
W4-DBD-6
Main Steam System - design basis document
2
Work Orders
2894192, 52955201, 52860841, 53002488, 552605,