Commission Memorandum and Order (CLI-20-12)
ML20317A117
Person / Time
Site: Pilgrim
Issue date: 11/12/2020
From: Annette Vietti-Cook
NRC/SECY
To: Jeff Baran, Annie Caputo, Christopher Hanson, Kristine Svinicki, David Wright
NRC/OCM
SECY RAS
References
50-293-LT, 72-1044 LT, CLI-20-12, License Transfer, RAS 55860
Download: ML20317A117 (73)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:

Kristine L. Svinicki, Chairman Jeff Baran Annie Caputo David A. Wright Christopher T. Hanson In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket Nos. 50-293-LT ENTERGY NUCLEAR GENERATION 72-1044-LT COMPANY, HOLTEC INTERNATIONAL, AND HOLTEC DECOMMISSIONING INTERNATIONAL, LLC (Pilgrim Nuclear Power Station)

CLI-20-12 MEMORANDUM AND ORDER This proceeding concerns a license transfer application involving the renewed facility operating license for the Pilgrim Nuclear Power Station and the general license for the associated Independent Spent Fuel Storage Facility (ISFSI) (together, the licenses). Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself and Entergy Nuclear Generation Company (ENGC), Holtec International, and Holtec Decommissioning International, LLC (HDI)

(collectively, the Applicants), requested NRC consent to the indirect transfer of control of the licenses to Holtec International and HDI and to the direct transfer of ENOIs operating authority to HDI. 10F 1

See Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment, 84 Fed. Reg. 816 (Jan. 31, 2019) (Hearing Opportunity Notice). We

After completing its review, the NRC Staff issued (1) an order approving the license transfer; (2) a related regulatory exemption that had been requested in the license transfer application; and (3) a conforming license amendment to reflect the transfer that included the deletion of certain conditions unique to ENOI and an associated name change. 2 NRC 1F regulations allow the Staff to issue its approval or denial of a license transfer application, consistent with its findings in its Safety Evaluation Report (SER), during a pending adjudicatory proceeding. 3 But the application will lack the agencys final approval until and unless the 2F Commission concludes the adjudication in the Applicants favor. 4 The Staffs order and related 3F issuances therefore remain subject to our authority to modify, condition, or rescind them, based on the results of this proceeding.

refer to ENGC and ENOI together as Entergy. We refer to HDI and Holtec Pilgrim, LLC (the name of the owner licensee following the transfer) together as Holtec.

2 See Order Approving Direct and Indirect Transfer of License and Conforming Amendment (Aug. 22, 2019) (ADAMS accession no. ML19170A265) (Order Approving Transfers);

Exemption (Aug. 22, 2019) (ML19192A086) (Exemption); Amendment No. 249 to DPR-35, attached as Encl. 1 to Letter from Scott P. Wall, NRC, to Pierre Paul Oneid, Holtec International, and Pamela B. Cowan, HDI (Aug. 27, 2019) (ML19235A050) (License Amendment).

3 10 C.F.R. § 2.1316(a); see also Atomic Energy Act of 1954, as amended (AEA) § 189a.,

42 U.S.C. § 2239(a)(2)(A) (permitting issuance of license amendment on an immediately effective basis, upon a determination that the amendment involves no significant hazards consideration, notwithstanding the pendency of a hearing request).

4 See CLI-19-11, 90 NRC 258, 262 (2019) (quoting Vermont Yankee Nuclear Power Corp. and AmerGen Vermont, LLC (Vermont Yankee Nuclear Power Station), CLI-00-17, 52 NRC 79, 83 (2000)).

We consider today the petition for leave to intervene and request for a hearing filed by the organization Pilgrim Watch. 5 The Applicants oppose the request. 6 The NRC Staff is not 4F 5F participating in this proceeding. For the reasons outlined below, we deny Pilgrim Watchs request for a hearing.

I. BACKGROUND A. The License Transfer Application As outlined in the application, the proposed license transfers would be effectuated pursuant to the terms of an Equity Purchase and Sale Agreement, pursuant to which 100% of the equity interests in ENGC would be transferred to Holtec International. 7 Upon closing of the 6F agreement, indirect control of ENGC would transfer from ENGCs parent companies to Holtec International. 8 ENGCs name would immediately be changed to Holtec Pilgrim, 9 which would 7F 8F 5

Pilgrim Watch Petition to Intervene and Hearing Request (Feb. 20, 2019) (PW Petition). The Commonwealth of Massachusetts also petitioned to intervene; that matter has been settled.

See Commonwealth of Massachusetts Petition for Leave to Intervene and Hearing Request (Feb. 20, 2019); Commonwealth of Massachusetts Notice of Withdrawal of its Petition for Leave to Intervene and Hearing Request (June 19, 2020). Because the settlement agreement has not been filed on the docket, we take no position on its substance and we do not consider its effect on Pilgrim Watchs proposed contentions. The NRC is not a party to the settlement agreement and therefore is not bound by its terms.

6 Applicants Answer Opposing Pilgrim Watch Petition for Leave to Intervene and Hearing Request (Mar. 18, 2019) (Applicants Answer to PW).

7 The Applicants relied on the Staffs order approving the transfers and closed the transfer transaction on August 26, 2019. But because the transfers have been challenged in this proceeding, they lack final NRC approval and are therefore still provisional in nature. We refer in this decision to the license transfers as they were proposed in the application.

8 See Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment, and Request for Exemption from 10 C.F.R.

§ 50.82(a)(8)(i)(A), at 1 (Application), attached (Encl. 1) to Letter from A. Christopher Bakken III, ENOI, to NRC Document Control Desk (Nov. 16, 2018) (Cover Letter). The cover letter and application are available together under ML18320A031.

9 The Applicants state that although ENGCs name would be changed to Holtec Pilgrim, the same legal entity will continue to exist as Pilgrims owner before and after the transfer. See Cover Letter at 2; Application at 1. More specifically, they state that prior to the proposed transactions closing, ENGC would be converted to a limited liability company and that, under

be the licensed owner of Pilgrim. Holtec Pilgrim would own the Pilgrim facility and associated real estate and assets, including the nuclear decommissioning trust fund, which would be held outside of Holtec Pilgrims administrative control. 10 Holtec Pilgrim also would hold title to the 9F spent nuclear fuel stored at Pilgrim and would accede to the rights and obligations of ENGC under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Waste (Standard Contract). 11 Holtec Pilgrim expects to recover, through litigation against the United 10F States, the spent fuel management costs that it will incur resulting from DOEs breach of its contractual obligation to dispose of the Pilgrim spent nuclear fuel. 12 11F Following the proposed license transfer, the operating authority to conduct licensed activities at Pilgrim would transfer from ENOI to HDI. Holtec International formed HDI to assume the licensed operator responsibilities for decommissioning nuclear power plants owned by Holtec International. 13 HDI will enter into a decommissioning operator services agreement 12F with Holtec Pilgrim under which HDI will act as Holtec Pilgrims agent and Holtec Pilgrim will pay HDIs operating costs. 14 Holtec Pilgrim would pay decommissioning, spent fuel management, 13F and site restoration costs. 15 14F HDI intends to contract with Comprehensive Decommissioning International, LLC (CDI),

to serve as the decommissioning general contractor. CDI would perform the day-to-day applicable Massachusetts law on such a conversion, the converted entity is considered to be the same entity as that which existed prior to the conversion. See Cover Letter at 2 n.1.

10 See Application at 1 & n.1. Certain assets are excluded from the purchase and sale agreement and would not be owned by Holtec Pilgrim. Id.

11 See id. at 19; see also 10 C.F.R. § 961.11 (text of contract). Boston Edison Company, a previous owner of Pilgrim, entered into the Standard Contract with the U.S. Department of Energy (DOE) in June 1983. See Application at 19.

12 Application at 19.

13 See id. at 1.

14 Id. at 2.

15 Id. at 16.

licensed activities, including decommissioning activities, subject to HDIs oversight and control as the licensed operator. 16 CDI was formed to perform decommissioning activities at 15F decommissioning nuclear power plants owned by Holtec. 17 CDI is jointly owned by Holtec 16F International (through its subsidiary HDI) and SNC-Lavalin Group (through its subsidiary Kentz USA Inc.). 18 In short, following the proposed license transfers, Holtec Pilgrim would be the 17F licensed owner, and HDI would be the licensed operator of the Pilgrim facility.

Holtec Pilgrim and HDI intend to significantly expedite the decommissioning of Pilgrim by implementing the DECON method of decommissioning. Under the DECON approach, the structures, equipment, and portions of the facility that contain radioactive contaminants are promptly removed or decontaminated to a level that permits termination of the license shortly after cessation of operations. 19 If the proposed transfer is approved as a final matter, HDI 18F intends to complete the transfer of spent nuclear fuel to the ISFSI as soon as practicable and to promptly proceed with decontaminating and dismantling the site (except for the ISFSI portion). 20 19F HDIs stated goal is to complete radiological decommissioning and site restoration and to release the non-ISFSI portions of the site for unrestricted use within eight years after license transfer. 21 HDI outlined its plans and accelerated schedule for decommissioning Pilgrim in a 20F revised Post-Shutdown Decommissioning Activities Report (PSDAR) that it submitted separate 16 Id. at 2.

17 Id. at 3.

18 Id. at 2.

19 See Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1 Regarding the Decommissioning of Nuclear Power Reactors (Final Report),

NUREG-0586, Supplement 1, vol. 1 (Nov. 2002), at 3-16 (ML023470327 (package))

(Decommissioning GEIS).

20 See Application at 4.

21 See id.

from the application. 22 HDIs PSDAR was contingent on NRC approval of the license transfer 21F application and closure of the asset sale.

ENOI submitted its own PSDAR in 2018 that outlined a decommissioning schedule based on delayed decommissioning under the SAFSTOR decommissioning approach. 23 The 22F SAFSTOR method involves placing the facility in a safe, stable condition . . . for a period of time, followed by subsequent decontamination and dismantlement to levels that permit license termination. 24 Under SAFSTOR, after reactor fuel and radioactive liquids are removed, the 23F facility is left intact for a long-term dormant period that allows for radioactivity levels to be significantly reduced by radioactive decay. If we were to rescind the Staffs order approving the license transfers, ENOIs PSDAR would go back into effect. As outlined in its PSDAR, ENOIs intention was to dismantle and decontaminate Pilgrim during the years 2074 to 2078, terminate the license in 2079, and complete site restoration by 2080. 25 24F B. Financial Qualification Review Under the Atomic Energy Act (AEA) and associated regulations, the NRC must give written consent for a license transfer. 26 The NRC will approve a license transfer application if it 25F determines that the proposed transferee is qualified to hold the license and that the proposed 22 See DECON Post-Shutdown Decommissioning Activities Report, attached to Letter from Pamela B. Cowan, HDI, to NRC Document Control Desk (Nov. 16, 2018) (ML18320A040) (HDI PSDAR).

23 See Pilgrim Post-Shutdown Decommissioning Activities Report, attached to Letter from Mandy K. Halter, ENOI, to NRC Document Control Desk (Nov. 16, 2018), at 7 (ML18320A034)

(Entergy PSDAR).

24 Decommissioning GEIS at 3-19.

25 Entergy PSDAR at 7.

26 See AEA § 184, 42 U.S.C. § 2234 (providing that no license granted under the AEA shall be transferred . . . directly or indirectly, through transfer of control of any license to any person, unless the Commission . . . shall give its consent in writing); 10 C.F.R. §§ 50.80(a), 72.50(a)

(implementing the AEA provision as to power reactor and ISFSI licenses, respectively).

transfer is consistent with applicable law, regulations, and orders. 27 The license transfer review 26F is limited to specific matters, including the technical and financial qualifications of the proposed transferee. 28 A license transfer application must provide reasonable assurance . . . that funds 27F will be available to decommission the facility. 29 The application also must provide information 28F sufficient to demonstrate the financial qualification of the applicant to carry out . . . the activities for which the license is sought. 30 Thus, a license transfer applicant for a reactor, like Pilgrim, 29F that has permanently ceased operating must demonstrate that it has the financial qualifications to pay for managing the spent fuel on the site (e.g., transferring fuel from wet storage to dry and maintaining an ISFSI). 3130F NRC regulations outline acceptable methods of demonstrating financial assurance of decommissioning funding, including the prepayment method. 32 Prepayment refers to prepaid 31F funds deposited in an account segregated from the licensees assets and outside of the licensees administrative control (such as a trust, escrow account, or government fund) in an amount that would be sufficient to pay decommissioning costs at the time permanent termination of operations is expected. 33 A licensee that has set aside prepaid 32F decommissioning funds based on a site-specific decommissioning cost estimate may take credit 27 See 10 C.F.R. § 50.80(c).

28 See id. § 50.80(b)(1)(i) (referencing 10 C.F.R. §§ 50.33 and 50.34).

29 See id. §§ 50.33(k)(1), 50.80(b)(1)(i); see also id. § 72.30(b)-(c) (regarding ISFSI decommissioning). cx 30 See id. § 50.33(f).

31 See, e.g., id. §§ 50.33(f), 50.33(k)(1), 72.30(b)-(c). Here, the Applicants need not demonstrate financial qualification to cover power reactor operating costs given that reactor operations have permanently ceased at Pilgrim. See id. § 50.33(f)(2); Letter from Brian R.

Sullivan, ENOI, to NRC Document Control Desk (June 10, 2019) (ML19161A033).

32 See 10 C.F.R. § 50.75(e)(1).

33 Id. § 50.75(e)(1)(i).

for projected earnings on the accounts funds, up to a 2% annual real rate of return, through the projected decommissioning period. 34 33F In this case, Holtec Pilgrim relies on the prepayment method of financial assurance based on the funds available in the Pilgrim decommissioning trust fund. At closing, the trust was to contain a minimum value of $1.03 billion. The Applicants claim that this amount will be sufficientassuming a credit for projected interest earnings at an annual real rate of 2%to pay the estimated costs of decommissioning, spent fuel management, and site restoration. 35 34F The Applicants estimate a total cost of $1.134 billion (in 2018 dollars) to cover the estimated costs of decommissioning ($593 million), spent fuel management ($501 million), and site restoration ($40 million). 36 35F The application includes a cash flow analysis for the years 2019 through 2063, the year at which final license termination is contemplated. The analysis begins with a trust fund balance of $1.03 billion given the terms in the equity purchase and sale agreement. For each year, the cash flow analysis identifies the projected (1) withdrawals from the trust fund to pay for decommissioning, spent fuel management, and site restoration costs; (2) interest earnings on the funds (based on a 2% real rate of return); and (3) trust fund year-end balances. 37 The cash 36F flow analysis projects approximately $217 million remaining in the fund at the end of 2025, following decommissioning, site restoration, and partial site release for unrestricted use of the non-ISFSI portions of the Pilgrim site. The analysis concludes that this amount, together with projected annual interest earnings on the fund, would be sufficient to pay for remaining spent 34 Id.

35 See Application at 16-18.

36 See id., Attach. D, Schedule & Financial Information for Decommissioning, tbl.

Decommissioning Cost Estimate Summary (Thousands of 2018 dollars).

37 See id., Attach. D, Schedule & Financial Information for Decommissioning, tbl. Pilgrim Nuclear Power Station Decommissioning Cash Flow Analysis.

fuel management costs and for the cost of decommissioning the ISFSI and restoring the ISFSI site. The cash flow analysis projects that approximately $3.6 million would remain in the fund in 2063, following final expenditures for spent fuel management, ISFSI decommissioning, restoration of the ISFSI site, and final license termination. 38 37F To demonstrate financial qualification for the license transfer, the Applicants rely only on the decommissioning trust fund. Holtec Pilgrim also states that it expects to recoverthrough litigation resulting in a judgment or settlementhundreds of millions of dollars from the United States as reimbursements for spent fuel management costs that Holtec Pilgrim will incur due to DOEs breach of obligations under the Standard Contract. 39 38F Our financial assurance requirements, combined with our procedures for review of a license transfer application, help ensure that a license is not transferred to an entity that will be financially unable to maintain and decommission the reactor facility and associated ISFSI. But as we recently emphasized in the Oyster Creek license transfer proceeding, our oversight of financial ability to decommission a facility and to manage the spent fuel on the site does not end after the financial qualification review. 40 A licensee in decommissioning must continue until the 39F license is terminated to demonstrate annually that funding for both decommissioning and spent fuel management remains adequate. The NRCs examination of a transfer applicants financial qualification therefore is conducted in light of regulatory requirements designed to ensure that funding remains sufficient until no longer needed.

For example, a licensee that has submitted its site-specific decommissioning cost estimate must submit to the NRC a financial assurance status report every year. The report 38 Id.

39 See, e.g., Applicants Answer to PW at 20 ([T]he additional funds that Holtec Pilgrim will receive through recovery of spent fuel management costs provide hundreds of millions of dollars of additional cash flow that could be used to provide additional assurance if necessary.).

40 Exelon Generation Co., LLC (Oyster Creek Nuclear Generating Station), CLI-19-6, 89 NRC 465, 475-76 (2019).

must include the following information, current through the end of the previous calendar year:

(1) the amount spent on decommissioning, both cumulatively and over the previous calendar year; (2) the remaining balance in the decommissioning trust fund (as well as any amount provided by any additional financial assurance method relied on); (3) an estimate of the costs to complete decommissioning as well as the decommissioning criteria upon which the estimate is based; (4) the difference, if any, between the actual decommissioning costs incurred and the previously estimated costs for work performed during the year; (5) any modifications to a licensees current method of providing financial assurance since the last submitted report; and (6) any material changes to trust agreements or financial assurance contracts. 41 40F If the remaining decommissioning funds, together with the projected earnings on those fundscalculated at a rate no greater than a 2% real rate of returnare not sufficient to cover the estimated cost to complete decommissioning, the licensee must include in the status report additional financial assurance to cover the remaining estimated costs. 42 Such additional 41F assurance might be in the form of a deposit to the trust fund or other prepayment, a parent guarantee, or other method that the Staff may approve pursuant to our regulations. 43 42F The NRC also requires licensees that have submitted a site-specific decommissioning cost estimate to provide an annual report on the status of their spent fuel management funding.

This report must specify the amount of funds available to cover the cost of managing the spent fuel and the projected cost of managing the fuel until DOE takes title to and possession of the fuel. 44 If the available funds are not sufficient to cover the projected cost, the report must 43F 41 See 10 C.F.R. § 50.82(a)(8)(v).

42 Id. § 50.82(a)(8)(vi).

43 See id. § 50.75(e)(1).

44 Id. § 50.82(a)(8)(vii)(A)-(B).

include a plan to obtain the additional funds to cover the cost. 45 In addition, a licensee must 44F provide to the NRC, for its review and preliminary approval, a program to manage and to provide funding for managing all spent fuel at the reactor. 4645F Additional NRC regulations on decommissioning also help to ensure that adequate decommissioning funding is maintained. For example, a licensee must first notify the NRC in writing, with a copy to the affected State(s), before performing any decommissioning activity that would significantly increase the estimated site-specific decommissioning cost beyond that provided to the NRC. 47 And NRC regulations prohibit a licensee from conducting any 46F decommissioning activity that would result in a loss of reasonable assurance that adequate funds will be available for decommissioning. 48 47F In short, the NRCs financial qualification review for a license transfer will not be the only examination of a transferees ability to pay for decommissioning and spent fuel management.

Subject to the NRCs oversight and requirements, a licensee must annually continue to show adequate funding until the license has been terminated and all spent fuel has been removed from the site. 49 48F C. Exemption Request NRC regulations do not permit licensees to use a decommissioning trust fund to pay for activities that do not fall under the NRCs definition of decommissioning. 50 Because Holtec 49F 45 Id. § 50.82(a)(8)(vii)(C).

46 Id. § 50.54(bb).

47 See id. § 50.82(a)(7) (referencing the decommissioning cost estimate provided to the NRC in a licensees PSDAR).

48 Id. § 50.82(a)(6)(iii).

49 Id. § 50.82(a)(8)(v)-(vii).

50 See id. § 50.82(a)(8)(i)(A) (withdrawals from the decommissioning trust fund may be made for expenses for legitimate decommissioning activities consistent with the definition of decommissioning in § 50.2). As defined in 10 C.F.R. § 50.2, to decommission means to remove a facility or site safely from service and reduce residual radioactivity to a level that

Pilgrim and HDI intend to use the trust fund to pay not only for decommissioning costs but also for spent fuel management and non-radiological site restoration costs, they needed to obtain and requested as part of the applicationan exemption from 10 C.F.R. § 50.82(a)(8)(i)(A),

which limits trust fund withdrawals to decommissioning activities. 5150F In the exemption request, HDI stated that the amount in the decommissioning trust fund exceeds the amount necessary to complete radiological decommissioning, spent fuel management, and site restoration. HDI stated that if it were unable to use the trust fund for spent fuel management and site restoration expenses, it would need to provide additional funding that would not be recoverable from the trust fund until the [Pilgrim] license is terminated. 52 HDI stated that it would bear an unnecessary and undue burden if it were unable 51F to withdraw funds in the trust that exceed those required to pay for decommissioning activities.

In support of the exemption request, HDI enclosed the same cash flow analysis submitted in the financial qualification section of the application. The analysis depicts HDIs projected trust fund withdrawals over the years 2019 through 2063 and shows approximately $3.6 million remaining in the fund at final license termination. 53 HDI noted in its request that the NRC has granted 52F several other requests for an exemption from 10 C.F.R. § 50.82(a)(8)(i)(A), including for the Vermont Yankee, Oyster Creek, Crystal River Unit 3, and Kewaunee facilities. The Staff approved the Pilgrim exemption request on August 22, 2019. 54 53F permits - (1) [r]elease of the property for unrestricted use and termination of the license; or (2)

[r]elease of the property under restricted conditions and termination of the license.

51 See Encl. 2 to Cover Letter, HDI Request for Exemption from 10 CFR 50.82(a)(8)(i)(A)

(Exemption Request).

52 See id. at E-6.

53 See id., tbl.1, Annual DECON Decommissioning Fund Cash Flow for the Pilgrim Nuclear Power Station.

54 The exemption was effective upon the NRCs issuance of a conforming license amendment reflecting HDI and Holtec Pilgrim as the licensees for Pilgrim, following NRC approval of the license transfer application and the Applicants completion of the transaction. Exemption at 12.

The exemption is within the scope of this adjudication because Holtecs demonstration of financial qualification for the license transfer relies on the exemption. Specifically, Holtec must demonstrate reasonable assurance that funds will be available to decommission the facility and must show its financial qualification to carry out the activities for which the license is sought, which here includes the spent fuel management activities. 55 Holtec estimates spent fuel 54F management costs in the amount of $501,467,000. Relying on the requested exemption, Holtec therefore plans to withdraw an estimated $501 million from the trust fund to pay for the spent fuel management expenses. The exemption also allows Holtec to withdraw funds from the trust fund to pay for site restoration, which Holtec estimates will cost approximately $40 million. 5655F D. The Staffs Approval of the Transfer NRC regulations specify that even where an adjudicatory hearing in the proceeding is pending, the Staff is expected, consistent with the findings in its SER, to promptly issue an approval or denial of a request for license transfer. 57 But in such circumstances, a Staff 56F approval will not constitute final agency action on the application. If the NRC receives a hearing request on a license transfer application, we review the request to determine if it satisfies the standards for intervention warranting a hearing and, if it does, we must consider the merits of the arguments presented. And while the Staffs review of the application may overlap with our review of the participants adjudicatory challenges to the application, they are separate reviews, 55 See 10 C.F.R. § 50.33(f), (k)(1).

56 Site restoration is a state-regulated matter. For the license transfer itself, therefore, Holtec need not show funding sufficient to complete site restoration, which includes satisfying state standards for the clean-up of non-radiological contaminants.

57 10 C.F.R. § 2.1316(a). The Commission relies on the staff, subject to Commission oversight, to exercise good judgment regarding whether there are circumstances that might warrant delay in the staffs review or action on the application. See Streamlined Hearing Process for NRC Approval of License Transfers, Final Rule, 63 Fed. Reg. 66,721, 66,726 (Dec. 3, 1998)

(Streamlined Hearing Process).

each of which must be completed and satisfied before a license transfer approval can be considered final. 58 57F While applicants may close a license transfer transaction despite the lack of final agency approval of the application, they do so at their own risk in the event that the Commission later determines that intervenors have raised valid objections to the license transfer application. 59 58F Applicants that act on a Staff order bear the risk that we may ultimatelybased on the results of a potential or pending hearingmodify or impose new license conditions relating to the transfer, or rescind the Staffs approval.

Consistent with these principles, the Staffs August 22, 2019, Order approving this license transfer contained the following condition:

The NRC staffs approval of this license transfer is subject to the Commissions authority to rescind, modify, or condition the approved transfer based on the outcome of any post-effectiveness hearing on the license transfer application.

For example, if the Commission overturns the NRC staffs approval of this license transfer, this Order and any conforming amendments reflecting this transfer, will be rescinded, and the Applicants must return the plant ownership to the status quo ante and revert to the conditions existing before the transfer. 60 59F E. Issuance of License Amendment on Immediately Effective Basis After the transaction closed, the Staff issued the license amendment reflecting the transfer and the name change as well as the deletion of four financial license conditions imposed when the NRC approved the transfer of the Pilgrim license from the Boston Edison Company. 61 This included License Condition J (4), which had required ENGC to have access 60F to contingency funding of not less than fifty million dollars ($50m) for payment, if needed, of Pilgrim operating and maintenance expenses, the cost to transition to decommissioning status 58 CLI-19-11, 90 NRC at 262.

59 See id. at 262-63 (quoting Vermont Yankee, CLI-00-17, 52 NRC at 83).

60 Order Approving Transfers at 6, Condition (2).

61 See Notification of Issuance of Conforming Amendment (Aug. 27, 2019); License Amendment.

in the event of a decision to permanently shut down the unit, and decommissioning costs. 62 61F The condition specified that once the plant had shut down following a decision to decommission, Entergy Nuclear will use any remainder of the $50m contingency fund that has not been used to safely operate and maintain the plant to support the safe and prompt decommissioning of the plant, to the extent such funds are needed for safe and prompt decommissioning. 63 The 62F condition did not affect the NRCs authority to ensure that adequate funds would remain available in the plants separate decommissioning fund, which would be maintained pursuant to NRC regulations and oversight. 6463F The Staff issued the amendment on an immediately effective basis based on a determination that the amendment involved no significant hazards consideration. 65 The Staff 64F noted that the NRC had generically determined that any amendment to a power reactor or ISFSI license that does no more than conform the license to reflect the transfer action involves no significant hazards consideration. 66 The Staff further stated that [n]o contrary determination 65F ha[d] been made with respect to this specific application. 67 66F 62 See Application, Attach. A, Renewed Facility Operating License (Changes), at 4, Condition J (4) (License Condition J (4)).

63 Id.

64 Id.

65 See Safety Evaluation by the Office of Nuclear Reactor Regulation Related to the Request for Direct and Indirect Transfer (Aug. 22, 2019), at 25 (ML19170A250) (SER); see also AEA

§ 189a., 42 U.S.C. § 2239(a)(2)(A).

66 SER at 25 (citing 10 C.F.R. § 2.1315).

67 Id.

II. DISCUSSION A. Intervention Requirements To intervene in an NRC licensing proceeding, a petitioner must show standing to intervene and submit at least one admissible contention for hearing. 68 Because we do not find 67F Pilgrim Watchs proffered contentions admissible, we do not reach Pilgrim Watchs standing to intervene in this proceeding.

NRC regulations in 10 C.F.R. § 2.309(f)(1) specify the requirements for an admissible contention. For each contention, a petitioner must explain the contentions basis and provide supporting facts or expert opinion on which the petitioner intends to rely in litigating the contention with references to specific sources or documents on which the petitioner intends to rely. To be admissible, a contention must fall within the scope of the proceeding and be material to the findings that the NRC must make for the proposed licensing action. The petitioner must identify the specific portions of the application that the petitioner disputes along with the supporting reasons for each dispute; or, if a petitioner believes that an application fails altogether to contain information required by law, the petitioner must identify each failure and provide supporting reasons for the petitioners belief. We long have emphasized that these contention admissibility requirements are strict. 69 They are intended to ensure that adjudicatory 68F hearings are triggered only by substantive safety or environmental issues that raise a supported dispute with the application on a matter material to the NRCs decision on the challenged action.

68 See 10 C.F.R. § 2.309(a), (d), (f); Hearing Opportunity Notice, 84 Fed. Reg. at 816-17 (referencing requirements for intervention).

69 See, e.g., Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI-99-11, 49 NRC 328, 334 (1999) (describing reasons why the NRC tightened its contention admissibility standards in 1989).

B. Pilgrim Watchs Petition In its Petition, Pilgrim Watch proffers two contentions challenging Holtecs application. In Contention I, Pilgrim Watch challenges Holtecs demonstration of financial qualification. 70 In Contention II, Pilgrim Watch raises environmental claims. Pilgrim Watch 69F argues that the license transfer action requires a National Environmental Policy Act (NEPA) analysis and that the application therefore needed to include an environmental report. It also argues that the categorical exclusion in 10 C.F.R. § 51.22(c)(21) does not apply to this proceeding. 71 70F As an initial matter, in its petition Pilgrim Watch states that it adopts and incorporates by reference the Commonwealth of Massachusettss (Commonwealths) [c]ontentions in this proceeding together with all of the Attorney Generals supporting bases and evidence. 72 But 71F because we findas discussed belowthat Pilgrim Watch has not submitted at least one admissible contention of its own, we reject its effort to adopt the Commonwealths contentions.

Our regulation on contention adoption, 10 C.F.R. § 2.309(f)(3), does not specifically address whether a petitioner who has not independently gained party status in a proceeding may adopt another partys contention. We have dealt with the issue of contention adoption in the past, but we have not directly dealt with contention adoption by a party who has not met the requirements for intervention. However, we discussed this scenario in Consolidated Edison Co.

of New York (Indian Point Units 1 and 2). 73 In that case the Commission allowed Petitioners 72F who had admissible contentions to adopt each others contentions. 74 While we accepted 73F 70 See PW Petition at 14-82.

71 Id. at 4, 89-90.

72 See id. at 130-31; see supra note 5.

73 CLI-01-19, 54 NRC 109 (2001).

74 Id. at 132-33. Because this case preceded the addition of § 2.309(f)(3) to our regulations, it speaks of incorporation by reference rather than adoption.

contention adoption in that circumstance, we cautioned that we would not accept incorporation by reference of another petitioners issues . . . where the petitioner has not independently established compliance with our requirements for admission as a party . . . by submitting at least one admissible issue of its own. 75 And in 2008, after § 2.309(f)(3) was added to our 74F regulations, a Licensing Board addressed this precise question, concluding that, based on the clear statement of the Commissions view [in Indian Point], . . . in order for a petitioner to adopt the contention of another petitioner, it must first demonstrate that it has standing and submit its own admissible contention. 76 We therefore hold that a petitioner must be admitted to a 75F proceeding as a party, by demonstrating standing and submitting at least one admissible contention, before it may be permitted to adopt another partys contention, arguments, or evidentiary support. Otherwise, petitioners with little or no knowledge of the issues raised in adopted contentions might be admitted as parties to litigate those contentions in our proceedings. This would essentially defeat the purpose of our contention admissibility standards, which are meant to ensure that parties to a proceeding have demonstrated the necessary factual or legal knowledge to participate meaningfully.

1. Pilgrim Watchs Contention I In Contention I, Pilgrim Watch argues that the application does not provide adequate financial assurance. Pilgrim Watch claims that the application does not show that either Holtec Pilgrim or HDI is financially responsible or that either has access to adequate funds for decommissioning. 77 Pilgrim Watch also claims that the application does not show that Holtec 76F Pilgrim and HDI have or will have the financial resources to pay for environmental impacts that 75 Id.

76 See Entergy Nuclear Operations, Inc. (Indian Point, Units 2 and 3), LBP-08-13, 68 NRC 43, 65-66 (2008).

77 PW Petition at 14.

will place the public health and safety and the environment at risk. Pilgrim Watch is concerned that the only asset that Holtec Pilgrim and HDI rely on in the application is the decommissioning trust fund. 78 77F

a. Accuracy of Current Cost Estimates Contention I involves consideration of Holtecs site-specific decommissioning cost estimate. The following observations guide our assessment of the issues Pilgrim Watch has raised. Although the NRC has provided guidance on this topic, we have not established specific regulatory requirements governing the contents and the degree of supporting detail that must be provided. In the past, license transfer hearings proceedings have typically involved operating reactors, and license transfer applicants in those cases generally showed reasonable assurance of decommissioning funding by using the NRCs generic, formula-derived estimate. 79 Within 78F two years following permanent cessation of operations, however, a licensee must submit a site-specific decommissioning cost estimate to the NRC. Thus, Holtec prepared and submitted to the NRC a site-specific decommissioning cost estimate. Contention I raises issues concerning the validity of this assessment.

At this early stage in the decommissioning process, cost estimates are necessarily uncertain. This observation is as true for a site-specific decommissioning cost estimate submitted by a current licensee as it is for one submitted by a license transfer applicant. We see no reason to require that a transfer applicants cost estimate be more detailed, more certain, or more conservative than the site-specific estimate submitted by a current licensee.

Moreover, the financial qualification review for license transfer ensures that a license is not transferred to an entity that lacks the financial capability to meet the expenses of decommissioning and spent fuel management. The cash flow analysis is a snapshot in time 78 See id.

79 See 10 C.F.R. § 50.75(b), (c).

based on particular cost estimates and assumptions, the amount accumulated in the trust fund and projected net interest gains, and any other applicable financial assurance. Actual costs and gains may fluctuate above and below original predictions (e.g., actual real rates of return may prove higher or lower than the 2% real rate of return that the NRC allows the applicant to credit).

And if a transfer is approved, the NRC will, as discussed above, continuously oversee the adequacy of the decommissioning and spent fuel management funding until the license is terminated.

In our license transfer adjudications, we deem financial assurance to be acceptable if it is based on plausible assumptions and forecasts, even if the possibility is not insignificant that things will turn out less favorably than expected. 80 We have likewise held that the mere 79F casting of doubt on some aspects of proposed funding plans is not by itself sufficient to defeat a finding of reasonable assurance. 81 Further, we have recognized that the potential safety 80F impacts, if any, from a shortfall in financial funding would not be so direct or immediate as the safety impacts of significant technical deficiencies. 82 Therefore, we recognize that the 81F demonstration of reasonable assurance of financial qualification is flexible. 83 Accordingly, we 82F will admit for hearing here only those contentions based upon adequately supported assertions that a transfer applicants financial assumptions and forecasts are implausible or unrealistic in a way that is material to our assessment of reasonable assurance.

80 See North Atlantic Energy Service Corp. (Seabrook Station, Unit 1), CLI-99-6, 49 NRC 201, 222 (1999).

81 Id.

82 Id. at 221.

83 See id. at 221-22; see also Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-78-1, 7 NRC 1, 9 (1978). To determine financial qualification the NRC will require the minimum amount of information necessary for that purpose. See 10 C.F.R. Part 50, Appendix C (regarding guidance for the financial data and related information required to establish the financial qualification for construction permits and combined licenses).

In the application, Holtec stated that in preparing the cost estimates, it (1) considered the input of experienced decommissioning, demolition, and waste management specialty subcontractors, and of subject-matter experts; (2) reviewed Entergys site-specific decommissioning cost estimate; (3) reviewed decommissioning cost data from plants in the United States that have started or completed decommissioning; (4) obtained pricing information from waste disposal facilities; and (5) reviewed plant data and historical information obtained from Entergy, including records of spills and unusual occurrences involving contamination that are maintained pursuant to 10 C.F.R. § 50.75(g). 84 83F In support of the decommissioning and site restoration cost estimates, Holtec provided line-item cost estimates for specified categories of activities for decommissioning and for site restoration. 85 It included, for example, the estimated volumes and weights of low-level 84F radioactive waste (broken down by waste class) and of Greater-than-Class-C Waste and estimated labor costs (broken down into management, professional labor, and craft labor categories). For the reasons discussed below, we find that Pilgrim Watch has not raised a supported, admissible challenge warranting litigation on the plausibility of the current cost estimates.

b. Sufficiency of Contingency Allowance Pilgrim Watch claims that Holtecs decommissioning cost estimate contains an inadequate amount of contingency funding. 86 It notes that an extra 17% has been added to the 85F 84 See Application, Attach. D, Schedule & Financial Information for Decommissioning, at 2 (unnumbered); HDI PSDAR, Encl. 1, Site-Specific Decommissioning Cost Estimate, at 7, 36-37, 48 (DCE).

85 See, e.g., DCE at 8, 28-34, 54.

86 The contingency allowance in Entergys site-specific decommissioning cost estimate was derived from an examination of the major activities (e.g., decontamination, segmentation, equipment handling, packaging, transport, and waste disposal) that have been known historically to require a contingency allocation. These activities were each assigned a respective contingency value based on the difficulty of the decommissioning task and actual experience with decommissioning projects (e.g., 75% for reactor segmentation; 50% for

decommissioning, site restoration, and spent fuel management cost estimates to account for contingencies, but Pilgrim Watch asserts that this additional amount is expected to be fully consumed and does not adequately account for inflation or increases in prices of goods and services over the course of the project. 87 However, licensees site-specific decommissioning 86F cost estimates usually include a contingency allowance to cover the estimated amount of additional expenses. NRC guidance provides for licensees to update their decommissioning cost estimate yearly for inflation and as appropriate for other significant increases in project costs. 88 That the additional amount added to the decommissioning, site restoration, and spent 87F fuel management cost estimates is expected to be fully expended in the course of the planned activities does not raise a genuine material dispute with Holtecs demonstration of financial qualification. The NRC does not have a minimum contingency requirement for the site-specific estimate, and Holtecs 17% contingency allowance falls within the range of contingency allowances that have been commonly added to site-specific decommissioning cost estimates. 89 88F decontamination; 25% for low-level waste disposal; 15% for heavy equipment and tooling). See Entergy Site-Specific Decommissioning Cost Estimate, § 3.3.1 (Contingency), at 4, attached to Entergy PSDAR (Entergy DCE). Twenty-six different decommissioning tasks in Entergys DCE were assigned a contingency value. The contingency values were applied on a line-item basis.

The estimated costs for each of the twenty-six separate components of work were multiplied by their assigned contingency value and the results were added to the decommissioning cost.

These additional amounts added to the decommissioning cost estimate were summed together.

For Entergy, the total amount for contingency represented 16.92% of the total estimated cost for license termination, spent fuel management, and site restoration.

87 See PW Petition at 22.

88 See Assuring the Availability of Funds for Decommissioning Nuclear Reactors, Regulatory Guide 1.159, rev. 2 (Oct. 2011), at 12 (ML112160012) (Regulatory Guide 1.159).

89 See, e.g., Crystal River Nuclear Generating Station Unit 3 Site Specific Decommissioning Cost Estimate (May 2018), app. C, tbl.C (last page) (ML18178A181) (18.2% contingency allowance); Fort Calhoun Station Site-Specific Decommissioning Cost Estimate (attached to PSDAR) (Feb. 2017), app. C, tbl.C (last page) (ML17089A59) (16.33% contingency allowance);

Three Mile Island Unit 1 Site-Specific Decommissioning Cost Estimate (Apr. 2019) § 6.1, at 19 (ML19095A010) (12.9% contingency allowance); Decommissioning Cost Analysis for the Monticello Nuclear Generating Plant (Oct. 2014), app. D, tbl. D (last page) (ML16005A105)

(16.94% contingency allowance).

Pilgrim Watch claims that Holtecs contingency factor does not satisfy 10 C.F.R.

§ 72.30(b)(2)(ii), which requires a decommissioning cost estimate to contain an adequate contingency factor. But that regulation refers to a contingency factor to be applied to the decommissioning cost estimate for an ISFSI, not to a power reactor. For ISFSI decommissioning, Holtec included a contingency allowance of 25%, which is consistent with NRC guidance on the ISFSI decommissioning cost estimate. 90 Pilgrim Watch has not identified 89F a genuine material dispute with the application over the 17% contingency factor that Holtec applied to the decommissioning, site restoration, and spent fuel management cost estimates.

c. Rate of Return Used in Cost Estimate While Pilgrim Watch accepts that the NRC by regulation allows licensees to assume an annual real rate of return on the trust fund of 2% over inflation, Pilgrim Watch asserts that decommissioning costs will escalate at a higher rate than inflation. It therefore claims that the additional cost increases over inflation in the decommissioning costs will wipe-out the estimated $3 million dollars that Holtecs cash flow analysis predicts will remain in the trust fund at final license termination in 2063. 91 We disagree for several reasons. First, we find 90F unsupported Pilgrim Watchs argument that decommissioning costs will increase at an annual rate higher than inflation. 92 Pilgrim Watch does not provide either an affidavit from an expert or 91F another source supporting its predictions. Indeed, Pilgrim Watchs own cited reference, a report describing the total estimated decommissioning costs of dozens of plants, stated that total costs hovered around the same level for four years between 2014 to 2017. 93 And the cited report 92F 90 See Consolidated Decommissioning Guidance, Financial Assurance, Recordkeeping, and Timeliness, NUREG-1757, vol. 3, rev. 1 (Feb. 2012), at 4-11; DCE at 25-26.

91 See PW Petition at 24.

92 See id. at 24-25.

93 See 2018 Nuclear Decommissioning Funding Study, Callan Investments Institute, at 3, 9 (2018 Callan Report); PW Petition at 24. Pilgrim Watch also references a 2015 Callan report stating that total decommissioning cost estimates rose approximately 60% between 2008 and

described total decommissioning costs as having decreased in 2017. 94 Regardless of 93F increases in particular decommissioning-related costs that may have occurred prior to 2014, Pilgrim Watch does not support its claim that decommissioning costs will escalate annually at a rate higher than inflation going forward. With significant increases in the numbers of plants that are entering decommissioning, it is difficult to predict how gained experience and economies of scale will affect decommissioning costs, and Pilgrim Watchs cited references do not support its claim that the only rational and factually supportable assumption would be that decommissioning costs will increase at an annual rate that is at least about 4% higher than the rate of annual inflation. 95 94F Second, even were Pilgrim Watchs predictions to come true, the NRC will be able to monitor increased withdrawals from the trust fund and increased projected costs as reported in the annual decommissioning financial assurance status reports. 96 As described above, if the 95F status report predicts a shortfall in funding, the licensee must provide additional financial assurance. 97 Consistent with NRC guidance, Holtec should adjust its decommissioning cost 96F estimate at least once a year to ensure that the estimate reflects cost changes from inflation or 2014. But the 2015 report also noted that part of the increase in costs was due to more licensees using a site-specific decommissioning cost estimate, which, unlike cost estimates derived from the NRCs minimum formula in 10 C.F.R. § 50.75(c), also included site restoration and spent fuel management costs, which the report noted can run into the hundreds of millions of dollars. See 2015 Nuclear Decommissioning Funding Study, Callan Investment Institute, at

3. And Pilgrim Watch refers to a 2011 NRC list of questions and answers, in which one answer addressed increases over a twenty-year period in cost escalation factors, including labor, energy, and low-level waste disposal, used to escalate decommissioning costs based on the 10 C.F.R. § 50.75(c) generic minimum formula. See PW Petition at 23 (citing NRC Questions and Answers, Encl. 5, SECY-11-0133 (ML111950031)). But Pilgrim Watch does not acknowledge that Holtecs low-level waste disposal estimates are based on pricing that was confirmed by selected waste disposal facilities. See DCE at 26.

94 See 2018 Callan Report at 9.

95 See PW Petition at 24.

96 See 10 C.F.R. § 50.82(a)(8)(v).

97 See id. § 50.82(a)(8)(vi).

other cost factors. 98 Rather than speculate about highly uncertain circumstances and events, it 97F is appropriate to rely on close annual monitoring of expenditures, projected remaining expenses, and remaining funding. Further, Holtec must provide its license termination plan at least two years prior to its expected date for partial site release (approximately 2026) with an updated decommissioning cost estimate, which provides another significant occasion to assess the adequacy of decommissioning funding. 99 At that point, many decommissioning activities will 98F already have taken place; actual costs of completed activities will be known; a site characterization will have been completed; and an updated decommissioning cost estimate based on refined site condition information will be provided. 100 99F Pilgrim Watch provides no support for its additional claim that spent fuel management costs could potentially increase (from 2019 to 2063) at an annual rate of 4% over inflation. 101 100F Notably, spent fuel management costs from the time of partial license termination (approximately 2027-28) until 2063 would only entail those relating to maintenance and oversight of the ISFSI. Holtec will nonetheless have to annually inform the NRC of the status of its spent fuel management funding, and if its funding does not cover the projected costs, it would need to provide a funding plan to cover the costs. 102 To the extent that spent fuel 101F 98 See Regulatory Guide 1.159 at 12 (addressing Inflation and Frequency of Adjustment);

see also 10 C.F.R. § 50.82(a)(8)(v)(B) (financial assurance status report must include an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based).

99 See Applicants Answer to PW at 19 (partial site release expected by 2026).

100 The NRC requires a licensee that specifies a delayed completion of decommissioning by including a storage or surveillance period to provide a means of adjusting cost estimates over the storage or surveillance period. See 10 C.F.R. § 50.82(a)(8)(iv). We do not have a similar requirement for licensees using the DECON approach to decommissioning, but such licensees would be expected within a short time-frame to submit an updated cost estimate with a license termination plan.

101 See PW Petition at 25.

102 10 C.F.R. § 50.82(a)(8)(vii) (status report); see also 10 C.F.R. § 50.55(bb) (spent fuel management funding plan).

management costs may prove to be higher than currently estimated, we expect that Holtec would seek correspondingly higher amounts in its litigation asserting breach of the Standard Contract. Pilgrim Watch does not claim that Holtec will not be able to obtain reimbursement for its spent fuel management costs. Pilgrim Watch effectively claims that, in the event of an actual or projected funding shortfall, Holtec will refuse to make additional financial commitments and, in so doing, would choose to violate NRC regulations. We decline to make this assumption.

d. Claims Relating to Future Actions by DOE Pilgrim Watch raises cost-related claims relating to actions that DOE may take. Pilgrim Watch states that the Standard Contract with DOE currently requires spent fuel to be packaged into DOE-approved transportation casks. In addition, Pilgrim Watch challenges Holtecs assumptions regarding when DOE will remove the spent fuel from the Pilgrim site. 103 102F Pilgrim Watch argues that if DOE were to mandate fuel repackaging, this could cause Holtec to incur significant unaccounted-for expenses. 104 We recognize that no certainty exists 103F at this time regarding how DOE will ultimately perform regarding the Pilgrim spent fuel or which party would bear responsibility for the costs of transferring fuel to DOE-supplied containers. But DOE was found liable for breaching the Standard Contract and liable for licensees related spent fuel management expenses; we will not presume, as a reason to deny a license transfer, that DOE will likely succeed in requiring licensees to bear additional fuel packaging-related expenses. Nor would this question be one that could reasonably be resolved in an NRC adjudicatory hearing. As for other potentially majorbut uncertainevents, any significant increase in costs would warrant an updating of the decommissioning cost estimate and would be reflected in a licensees annual status report, which must provide the projected remaining costs of decommissioning.

103 See PW Petition at 26-31, 59.

104 See id. at 21, 30, 61-63.

Pilgrim Watch claims that Holtec has not justified its assumption that DOE will begin removing spent fuel from the Pilgrim site in 2030 and will complete removal of the fuel by 2062. 105 Pilgrim Watch further claims that Holtec has not explained how it would address the 104F possibility of indefinite storage. 106 Pilgrim Watch argues that the Continued Storage Rule 105F discussed onsite storage for 100 years; using the annual spent fuel management costs estimated in Holtecs PSDAR, the additional fifty-seven years of storage would cost more than

$380 million. 107 Pilgrim Watch further argues that Holtec has not accounted for costs of 106F replacing aging casks and replacing storage pads every 100 years. 108 107F We do not require that the site-specific decommissioning cost estimate include estimated costs for potential but highly uncertain contingencies. That indefinite storage is possible does not make it likely, and we find it reasonable to expect that a repository will become available before 2063. While the NRCs generic environmental impact statement (GEIS) for the Continued Storage Rule acknowledges the possibility that fuel could remain onsite indefinitely, the GEIS also supports a conclusion that a repository will be available by 2063. Indeed, the GEIS notes that safe storage of spent fuel in a geologic repository is technically feasible using currently available technology, with no major breakthrough in science or technology needed, and it found 25 to 35 years . . . a reasonable period for repository development. 109 As the GEIS describes, DOEs stated goal is to have a repository sited by 108F 2026, the site characterized and the repository designed and licensed by 2042, and repository 105 See id. at 26-31, 59.

106 See id. at 30.

107 Id.

108 Id. at 30-31.

109 See Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel (Final Report), NUREG-2157, vol. 1 (Sept. 2014), app. B, at B-2, B-8 to B-9 (ML14196A105).

operations started by 2048. 110 Holtecs final license termination timeframe is in our view 109F plausible and therefore acceptable for financial assurance predictions.

If new information regarding repository development were to render the 2062 date unrealistic, the NRC would address any potential need for an adjustment to spent fuel management funding. In issuing the Continued Storage Rule, the NRC stated that the agency would continue to monitor changes in national policy and developments in spent fuel storage and disposal technology. 111 And the NRC noted that if future developments warrant, licensees 110F could be required to amend their licenses, which would be accompanied by site-specific safety and environmental reviews. 112 We decline at this time to require licensees or transfer 111F applicants to predict how the cost of spent fuel management will be borne in the future in the event indefinite storage is needed.

As to Holtecs assumption of 2030 as the starting date for DOE beginning the transfer of fuel from the Pilgrim site, Holtec states that, consistent with Entergys spent fuel disposal plans for Pilgrim, the spent fuel would not necessarily go at that time to a final repository. 113 Pilgrim 112F Watch references a Congressional Research Service report on civilian nuclear waste disposal that concludes that longer on-site storage is almost a certainty, but the same report indicates that there have been corporate and legislative initiatives aimed at providing interim storage options. 114 And two separate applications for interim storage facilities are currently before the 113F NRC. While those applications are still under review, and it is uncertain whether statutory changes will be made to allow DOE to take title to and transport the spent fuel to an interim 110 Id. at B-8.

111 See Continued Storage of Spent Nuclear Fuel, Final Rule, 79 Fed. Reg. 56,238, 56,246 (Sept. 19, 2014).

112 Id.

113 See DCE at 43.

114 See PW Petition at 30 n.17; Congressional Research Service, Civilian Nuclear Waste Disposal (Sept. 6, 2018), at 4-5; 35-36.

disposal site, we accept as plausible that by 2030 a storage facility will be available to receive the Pilgrim waste.

Finally, because disposal of spent fuel and high-level waste is a federal responsibility, additional delays in DOE taking the Pilgrim spent fuel beyond 2030 would mean that Holtec could recover additional spent fuel management costs from DOE. Holtec already intends to seek reimbursements from DOE based on its estimated $500 million in spent fuel management expenses. While Pilgrim Watch contests the lack of a license condition or other regulatory commitment requiring Holtec to use funds obtained through litigation or settlement for expenditures that exceed the currently estimated costs, it does not argue that Holtec is unlikely to receive substantial reimbursements for ongoing spent fuel management costs at Pilgrim recoveries that could be used to defray additional costs if fuel removal does not begin in 2030. 115 Yearly spent fuel management costs are relatively predictable on a year-to-year basis, 114F and the NRC would require an updated spent fuel management plan to address any major change resulting in a projected shortfall in spent fuel management funding.

e. Low Level Radioactive Waste Disposal Costs Pilgrim Watch also raises the possibility that Holtec may not receive approval from the Texas Compact Commission to dispose of the Class B and C waste at Waste Control Specialists resulting in higher costs. 116 Holtec states that most of its waste meets the Class A 115F definition but that for its Class B and C waste it will file an import petition with the Texas Compact Commission to obtain approval to dispose of out-of-compact waste. Holtec also states that it currently holds a contract with Waste Control Specialists permitting the disposal of radioactive waste from any decommissioning project in the United States. 117 But Pilgrim Watch 116F 115 PW Petition at 18, 26.

116 See id. at 59.

117 See, e.g., DCE at 27.

does not indicate that licensees have experienced difficulty in gaining approval from the Texas Compact Commission to import Class B and C waste for disposal at Waste Control Specialists.

Based on the information before us, we have no basis to view as implausible Holtecs assumption that Class B and C waste will be disposed of at Waste Control Specialists. 118 117F

f. Delays in Work Schedule Among its proposed scenarios of circumstances that could lead to increased costs, Pilgrim Watch claimed in its petition that delays in the decommissioning schedule may lead to a funding shortfall in the decommissioning trust. 119 Common types of delays due to weather, 118F equipment, and labor generally are anticipated and covered by the contingency allowance that has been, as a general practice, added to the cost estimates. And, as we observe above, Holtecs total contingency allowance amount is consistent with that of other licensees and would be expected to cover common causes of delay. If a delay were to occur and it caused an overall schedule delay that significantly increased costs, we would expect such an increase to be reflected in the annual financial assurance status report on decommissioning funding.

Therefore, Pilgrim Watch does not raise a genuine material dispute with the application over the potential costs of delays in decommissioning.

g. Potential Denial of Exemption Request Pilgrim Watch also argued that the application fails to consider what would happen if the exemption were not granted. 120 But the Applicants point out that if the exemption request were 119F not granted, the Application would either be revised, withdrawn, or rejected. 121 We agree that 120F this argument does not raise a genuine dispute with the application.

118 See Entergy DCE, § 1.3.2.

119 PW Petition at 21, 63, 127.

120 See id. at 64-65.

121 Applicants Answer to PW at 58.

h. Scenarios Requiring Additional Financial Assurance Pilgrim Watch likewise identifies scenarios that, if they occurred, would need to be addressed in the decommissioning or spent fuel management funding status reports and, as necessary, would require that Holtec provide additional financial assurance. These other scenarios include its assertions that Holtec may need to replace failed casks or pads; 122 spent 121F fuel canisters may corrode and leak and need repair; 123 and terrorist attacks or acts of malice 122F against the spent fuel pool or the ISFSI could cause dry cask rupture. 124 Pilgrim Watch does 123F not link these scenarios with a supported challenge to a specific part of the application and therefore does not articulate a genuine dispute with the application. Moreover, as we have explained above, our regulatory structure assures that funding shortfalls will be identified and addressed on a regular basis. Pilgrim Watch does not show how these scenarios would go unaddressed, and thus its claims lack factual support.
i. Existing Contamination at the Site and Lack of Site Characterization Pilgrim Watch next argues that Holtecs cost estimates are based on an incorrect assumption that the Pilgrim site is essentially clean. 125 But Pilgrim Watch does not identify 124F any such claim in Holtecs application or cost estimate, nor do we find one. 126 We note that 125F 122 See PW Petition at 27, 30.

123 See id. at 31, 77. Pilgrim Watch raises, without support, a concern about salt-induced stress corrosion cracking. See id. at 77. It also raises a concern about the use of high burnup fuel. Id.

But Pilgrim Watch does not provide a supported argument challenging the application linked to these concerns.

124 See id. at 71-76.

125 See id. at 31.

126 In its reply, Pilgrim Watch states that it does not dispute that the license transfer application and the PSDAR do not specifically describe the Pilgrim site as clean. See Pilgrim Watch Reply to Applicants Answer Opposing Pilgrim Watch Petition for Leave to Intervene and Hearing Request (Apr. 1, 2019), at 15 (PW Reply to Applicants). Pilgrim Watch goes on to claim that the application, cost estimate, and PSDAR do not justify an assumption that there is no significant contamination. See id. (citing DCE at 22). To the extent that Pilgrim Watch is introducing new claims in its reply brief, Commission practice generally does not allow entirely new arguments to be presented in a reply. See, e.g., Louisiana Energy Services, L.P. (National

Holtec based its decommissioning cost estimate on its review of the historical contamination event records maintained under 10 C.F.R. § 50.75(g). 127 Holtec concluded that these events 126F were well documented and the cleanup efforts following the specific recorded events were effective such that no significant contamination remained following cleanup operations. 128 But 127F that is not an assertion that no further cleanup will be necessary during the decommissioning process at the particular areas where a recorded incident of contamination took place. Nor is it an assertion that other areas at the facility do not have contamination. In its decommissioning cost estimate, Holtec states that it plans bulk removal of large contaminated components and that its estimate includes a conservative estimate of contaminated soil that will need to be removed, packaged, shipped, and disposed of as low level or exempt waste. 129 In addition, 128F regarding non-radiological site restoration, Holtec states it will need to remove asbestos Enrichment Facility), CLI-04-25, 60 NRC 223, 225 (2004). Regardless, Pilgrim Watch does not raise a litigable issue here. Pilgrim Watch claims that while it will assume that, to some unknown extent, Holtec may have reviewed some 50.75(g) records and received some data and historical information from Entergy . . . even Holtec recognized that what it had done was not enough to know what contamination is actually on site because it planned to conduct site characterization activities to identify, categorize, and quantify radiological, regulated, and hazardous wastes. See PW Reply to Applicants at 15-16. In essence, Pilgrim Watch merely reiterates its claim that because the cost estimate was not based on a full site characterization, Holtec cannot now know the true decommissioning costs. See id. at 16. But at this stage we do not require the cost estimate to be confirmed by a site characterization.

127 Pilgrim Watch argues that Holtec admits that site characterization is necessary to supplement the historic plant records on which Holtec bases its cleanup estimates. PW Petition at 32-33. The application does not specifically describe the contents of historical plant records, and therefore Pilgrim Watch may not know specific historical data to the extent that such data are not publicly available. But the NRC has not required licensees to include summaries of this historical data in their site-specific cost estimates. Moreover, to the extent that Pilgrim Watch found it needed additional information to review the application, the Hearing Opportunity Notice provided steps potential intervenors should take to access material, non-public information.

Hearing Opportunity Notice, 84 Fed. Reg. at 819. Pilgrim Watch did not request access to non-public information in this proceeding.

128 DCE at 23.

129 Id.

containing material and hazardous and universal waste. 130 Pilgrim Watch does not address or 129F otherwise challenge Holtecs estimated $40 million estimate for non-radiological site restoration.

Pilgrim Watch also argues that no site characterization has been performed to identify, categorize, and quantify radiological and non-radiological contamination. 131 To the extent that 130F Pilgrim Watch disputes Holtecs cost estimate because it is not based on a completed site characterization, Pilgrim Watch does not raise an admissible, genuine material dispute with the application. We do not require that a site characterization be performed at this stage, and we therefore do not require that the current site-specific decommissioning cost estimate be based on or confirmed by a site characterization.

Our regulations require a site characterization when a licensee submits its license termination plan. The license termination plan must be submitted at least two years before the date of license termination. Among other items, it must include a site characterization and an updated site-specific decommissioning cost estimate for the remaining decommissioning activities. 132 Holtec states that it plans to submit its license termination plan about two years 131F prior to the year in which Holtec expects that the site will be released (except for the ISFSI portion). This license termination plan review, which will be subject to a hearing opportunity, will therefore encompass the site characterization and the updated decommissioning cost estimate.

To the extent that Pilgrim Watch challenges the adequacy or accuracy of Holtecs cost estimates because a site characterization has not yet been completed, Pilgrim Watch impermissibly challenges our regulations. 133 Because we do not require a site characterization 132F 130 See id. at 16, 23; HDI PSDAR at 11; see also DCE at 49-50 (listing site restoration costs).

131 See PW Petition at 31-54.

132 See 10 C.F.R. § 50.82(a)(9)(ii)(A), (F).

133 See id. § 2.335(a).

at this point, we likewise do not require Holtecs current cost estimates to be based on verified quantities, types, and locations of contamination. 134 133F Holtec has indicated that performing the site characterization, an iterative process, is one of its first tasks upon assuming the ownership and control of the site. Accordingly, we expect that Holtecs decommissioning cost estimate will be updated as warranted based on the results of the site characterization that Holtec is performing this year.

As discussed above, the licensee must provide every year in the financial assurance status report an estimate of the cost to complete decommissioning and the decommissioning criteria on which the estimate is based. 135 NRC guidance on decommissioning cost estimates 134F specifically addresses the need to adjust the decommissioning cost estimate to account for updated information about the facility conditions, such as larger levels of contamination than anticipated. 136 The NRC also expects that the cost estimate will be adjusted annually to 135F account for inflation. The cost estimate will also be updated to account for technological or plant status changes, including recent developments in decontamination, waste processing and disposal, or cutting equipment and other technology; . . . updated waste disposal conditions; updated residual radioactivity limits; and experience gained from the actual decommissioning of similar facilities. 137 136F 134 NRC decommissioning cost estimates are required at different stages: (1) initial cost estimates at the operating license stage may be based on the NRCs generic minimum formula found in 10 C.F.R. § 50.75(c) and must be adjusted annually; (2) a preliminary decommissioning cost estimate must be provided at or about five years prior to the projected end of operations, pursuant to § 50.75(f)(3); (3) a site-specific decommissioning cost estimate must be provided within two years following permanent cessation of operations, pursuant to § 50.82(a)(4)(i)

(provided in the PSDAR) and § 50.82(a)(8)(iii); and (4) an updated decommissioning cost estimate of remaining costs must be provided in a license termination plan, pursuant to

§ 50.82(a)(9)(ii)(F). There are different expectations of the estimates to be provided under each of these stages.

135 See 10 C.F.R. § 50.82(a)(8)(v), (vi).

136 Regulatory Guide 1.159 at 12.

137 Id.

In sum, while the NRC must be satisfied that an applicant has demonstrated financial qualification to obtain an NRC license, annual monitoring of the decommissioning and spent fuel management funding ensures that projected funding will continue to remain sufficient to cover decommissioning and spent fuel management costs. Therefore, Pilgrim Watchs argument that the cost estimates are deficient because the actual amounts of contamination will not be known until a site characterization is completed does not raise a genuine material dispute with the application.

j. Claims of Existing Site Contamination To the extent that Pilgrim Watch suggests that there is current contamination that will cause decommissioning activities to have environmental impacts exceeding those described in relevant environmental impact statements, Pilgrim Watch does not support its arguments and these claims fall beyond the scope of this license transfer proceeding. Similarly, to the extent that Pilgrim Watch claims that relevant environmental impact statements contain inaccurate information on site conditions, Pilgrim Watch does not support its claims and such claims likewise fall beyond the scope of this proceeding. 138 137F Pilgrim Watch claims that the cost of decontaminating and restoring the Pilgrim site will be more, probably far more than Holtec has estimated. 139 It claims that over the years, Pilgrim 138F has buried contaminated material on site and has had many leaks and releases. 140 In support, 139F 138 See PW Petition at 33-34.

139 Id. at 35.

140 Id. at 36. Pilgrim Watch states that an environmental monitoring report issued in 1983 indicated excessively high readings of Cs-137 at two offsite locations. See PW Petition at 39-40. But the report also concluded that it was highly unlikely that the Pilgrim facility was the cause of the Cs-137 readings, which were over 1,000,000 times what would be expectedat a residence located over ten miles away from the Pilgrim plant. Ultimately, the report found that the absence of Cs-134 and the unusual reading indicated that atmospheric fallout from weapons testing may have been the primary cause of elevated cesium levels. See PW Petition, Ex. 3, Pilgrim Nuclear Power Station, Environmental Radiation Monitoring Program, at 3-68, 3-69, 3-80.

it refers to multiple asserted events, results of surveys, and NRC inspection results. 141 But it 140F does not link these cited items to the license transfer application. It does not explain how the historic reports or events that it references have significance today; what that significance is (e.g., a particular level of residual radioactivity likely to exist today at levels that exceed standards); or how the information challenges a specific aspect of the application (e.g.,

estimated remediation costs that call into question Holtecs cost estimates). Pilgrim Watch does not articulate a genuine dispute with Holtecs site-specific decommissioning cost estimate or the site restoration cost estimate. 142 141F Pilgrim Watch claims that there has not been an adequate program at Pilgrim for inspecting buried pipes and tanks, and it suggests that there is contamination around the buried pipes and tanks that may not be accounted for in the decommissioning cost estimate. This claim is unsupported. 143142F In addition, Pilgrim Watch notes, and Holtec does not dispute, that groundwater monitoring at Pilgrim has shown elevated levels of radionuclides, including tritium. 144 But again, 143F 141 See PW Petition at 36-54.

142 See id. at 36-44. For example, Pilgrim Watch references a 1988 article in the Boston Globe, which stated that a 5,000 cubic feet pile of dirt near Pilgrim contained Cs-134, Cs-137, and Co-60. But the article states that this pile of dirt near the Pilgrim parking lot did not have levels of radioactivity exceeding federal standards. See Radioactivity Detected in Dirt Pile Near Pilgrim, by Larry Tye, Boston Globe (Jan. 21, 1988), at 29. Nothing in the article indicates that the pile of dirt posed any public health and safety or environmental concern, even in 1988.

143 See PW Petition at 42-44. The adequacy of Entergys aging management program for buried pipes and tanks was the subject of an evidentiary hearing at the time the Pilgrim operating license was renewed. The Board found in favor of the applicant; we declined review.

Entergy Nuclear Generation Co. & Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), LBP-08-22, 68 NRC 590, 593 (2008), pet. for review denied, CLI-14-10, 71 NRC 449, 477 (2010).

144 See PW Petition at 44-48. Pilgrim Watchs citations to the NRC Liquid Radioactive Release Lessons Learned Task Force Final Report do not raise a dispute with the Holtec application.

See id. at 50-52, 103 (citing NRC Liquid Radioactive Release Lessons Learned Task Force, Final Report (2006) (ML062650312)). The report proposed improvements to radiological effluent and environmental monitoring, which led to expanded monitoring at nuclear power plant

Pilgrim Watch provides no expert opinion or other factual support indicating that there is significant remaining contamination which will require remediation at a cost that may make a material difference to Holtecs financial qualification. One of Pilgrim Watchs cited references is an updated report by the Commonwealths Bureau of Environmental Health on tritium in groundwater at Pilgrim covering the months July-December 2018. 145 The report notes that out 144F of twenty-three routinely sampled groundwater wells, in all wells but one (MW-219) tritium levels were below the EPA drinking water standard. 146 The report states that Entergy identified the 145F source of tritium in MW-219 and installed a containment system and that levels of tritium in that well had stabilized at 1,000 pCi/L (well below the EPA drinking water standard of 20,000 pCi/L). 147 This report, on its face, does not support Pilgrim Watchs claims. And Pilgrim Watch 146F does not address how this or other reports it references call into question the plausibility of Holtecs decommissioning cost estimate or otherwise raise a genuine material dispute with the application.

Pilgrim Watch also does not support its claim that there has been hazardous waste dumping at Pilgrimthat barrels of chemical waste were shipped from New Jersey and buried along Pilgrims access road. 148 Indeed, Pilgrim Watch states that the Commonwealth did not 147F facilities including at Pilgrim. The recommendations and conclusions of the 2006 report do not suggest that current radiological effluent and environmental monitoring is unreliable.

145 See PW Petition at 44 n.38 (with link to state groundwater monitoring reports); Update of the Tritium in Groundwater Investigation at Pilgrim Nuclear Power Station, Plymouth, MA (July-December 2018) (Tritium Investigation Update).

146 See Tritium Investigation Update at 2.

147 See id. at 3.

148 See PW Petition at 52-53 & nn.55-56. In support, Pilgrim Watch cites to a paper by the Jones River Watershed Association (PW Exhibit 4, ML19052A182, at 34) that merely states that sources have reported burials of hazardous waste and a 2013 Pilgrim Coalition newsletter, in which an individual stated that he had tried to uncover chemical wastes . . . buried near the plant.

investigate such claims of buried hazardous wastes because no evidence of buried wastes had been identified on which the Commonwealth could rely to pursue an investigation. 149 148F Further, Pilgrim Watch does not support its claim that the decommissioning cost estimate is inadequate because it fails to include the cost of an adequate study to locate sites where potential masses of contaminated material susceptible to ignition might accumulate during decommissioning and the costs of forestalling a fire by removing or limiting heat, oxygen, and/or fuel. 150 Holtec notes that it has onsite property damage insurance and offsite nuclear 149F liability insurance and that its plant deactivation activities will include removing combustibles and chemicals to permit fire protection system modifications. 151 Pilgrim Watch also provides no 150F expert opinion or factual support for its claims that Holtec failed to consider what it asserts are likely increased decommissioning costs due to climate change. 152 And it does not adequately 151F support its claim that climate change impacts would likely cause a significant increase in decommissioning costs during the years 2019-27 or overall ISFSI decommissioning costs.

149 See PW Petition at 53.

150 Id. at 59.

151 See Applicants Answer to PW at 53.

152 See PW Petition at 60-61.

k. ISFSI Decommissioning Pilgrim Watch also challenges the adequacy of Holtecs funding for the decommissioning of the ISFSI. Pilgrim Watch claims that Holtecs cash flow analysis does not take into account Holtecs estimated ISFSI decommissioning cost of $4.2 million. 153 But while the cash flow 152F analysis table does not display a separate column for ISFSI decommissioning, Holtec incorporated the estimated ISFSI decommissioning costs into its calculations by allocating portions of the overall ISFSI decommissioning costs into the separate categories of license termination, spent fuel management, and site restoration activities. 154 The decommissioning 153F cost estimate further provides a table breaking down the ISFSI decommissioning costs into separate categories (e.g., removal costs, LLRW disposal costs, license termination, spent fuel, site restoration). 155 Pilgrim Watch does not address or challenge these stated costs.

154F Pilgrim Watch additionally claims that if decommissioning costs exceed inflation by 4%

every year, then by its own calculations the ISFSI decommissioning cost will be $24 million more than Holtec projects. 156 But Pilgrim Watch does not support this cost escalation claim 155F regarding ISFSI decommissioning. In any event, Holtec must submit to the NRC an ISFSI decommissioning funding plan at least every three years with adjustments as necessary to account for changes in costs. 157 And because Holtec is relying on the decommissioning trust 156F fund to pay for the ISFSI decommissioning costs, it will also need to provide this information in an annual financial status report on decommissioning. 158 That report is required to indicate the 157F costs incurred the previous year, the remaining projected costs to complete the 153 See id. at 80-81.

154 See DCE at 28-30.

155 See id. at 54.

156 See PW Petition at 81.

157 See 10 C.F.R. § 72.30(b)-(c).

158 See id. § 50.82(a)(8)(vii).

decommissioning, and the amount remaining in the trust fund. If there is a significant increase in projected ISFSI decommissioning costs, Holtec would need to provide additional financial assurance in the status report to cover those costs.

Pilgrim Watch also raises an unsupported challenge to Holtecs assumption that the ISFSI pads will not be contaminated. 159 But it asserts no factual basis or expert opinion 158F challenging Holtecs assumption. Holtec states that its cost estimate assumes that some of the inner steel liners and concrete overpacks will contain low levels of neutron-induced residual radioactivity that would necessitate remediation at the time of decommissioning. 160 But Pilgrim 159F Watch provided no support for its assertion that contamination of underlying pads would be expected, particularly given that the canisters are stored in steel-lined concrete overpacks. 161 160F Because Pilgrim Watch did not support its claim, we do not consider it further. Holtecs assumption will nonetheless need to be confirmed by verification surveys, as it indicates in its estimate. 162 In sum, Pilgrim Watch has not provided a supported admissible dispute 161F challenging the estimated ISFSI decommissioning.

159 See PW Petition at 80 (citing DCE at 25).

160 See Applicants Answer to PW at 60 (citing DCE at 25) (as an allowance nine of the sixty-one overpacks are assumed to contain residual radioactivity).

161 Id.

162 See DCE at 25.

l. Claims Relating to the PSDAR Many of Pilgrim Watchs arguments suggest that this proceeding will approve HDIs PSDAR and thereby will authorize the decommissioning activities described in the report. 163 162F But the proposed license transfer does not permit Holtec Pilgrim and HDI to perform any decommissioning or spent fuel management activity not already authorized by the Pilgrim licenses. Similarly, neither Holtec Pilgrim nor HDI may undertake any decommissioning activities that result in any significant environmental impacts that have not been previously reviewed. 164 163F As we describe further below, the NRC does not approve a PSDAR, and most of the information in a PSDAR falls outside the scope of a license transfer proceeding. The Staff examined the PSDAR only to determine whether Holtec Pilgrim and HDI are financially and technically qualified to hold the license for Pilgrim and the general license for the Pilgrim ISFSI. . . and to engage in the proposed maintenance and decommissioning activities. 165 In164F this sense, the site-specific decommissioning cost estimate and the associated decommissioning schedule must necessarily be reviewed as part of the determination concerning Holtecs financial qualification. 166 But a license transfer review does not itself 165F involve any consideration of the potential environmental impacts of decommissioning activities.

As part of our oversight of decommissioning, the NRC requires a licensee to submit a PSDAR. Before or within two years following permanent cessation of operations, a licensee 163 See, e.g., PW Petition at 18-19, 129.

164 See 10 C.F.R. § 50.82(a)(6)(ii).

165 SER at 3.

166 See id. at 9 n.1 (noting that the NRC does not approve a PSDAR and that the Staff relied on the HDI PSDAR for the site-specific decommissioning cost estimate, and as a general reference for HDIs decommissioning plans).

must submit a PSDAR to the NRC. 167 The PSDAR must contain (a) a description of the 166F planned decommissioning activities and a schedule for their accomplishment; (b) the reasons for the licensees conclusion that the specified decommissioning activities will be bounded by prior environmental impact statements; and (c) a site-specific decommissioning cost estimate.

The PSDARs purpose is to provide a general overview for the public and the NRC of the licensees proposed decommissioning activities. 168 The PSDAR also informs the NRC 167F Staff of the licensees decommissioning schedule, allowing the Staff to plan for inspections and other decommissioning oversight activities. The NRC will provide notice of a PSDAR and an opportunity for public comment, and it will also hold a public meeting on the PSDAR. 169 168F But the NRC does not approve a PSDAR, nor does a PSDAR amend a license. That is because a PSDAR does not authorize a licensee to perform any decommissioning activity that is not already permitted under the license or would result in significant environmental impacts not already reviewed. 170 A licensee therefore may begin to perform major decommissioning 169F activities consistent with its PSDAR ninety days after the NRC has received the PSDAR. 171 170F NRC regulations expressly prohibit a licensee from performing any decommissioning activity that results in significant impacts not previously reviewed. 172 The NRC has evaluated 171F potential environmental impacts of decommissioning nuclear power reactors in a 167 10 C.F.R. § 50.82(a)(4)(i) (also providing for a copy to the affected state(s)).

168 See Decommissioning of Nuclear Power Reactors, Final Rule, 61 Fed. Reg. 39,278, 39,281 (July 29, 1996) (Decommissioning Rule).

169 10 C.F.R. § 50.82(a)(4)(ii).

170 See id. § 50.82(a)(6)(ii).

171 Id. § 50.82(a)(5). In issuing the PSDAR regulations, the NRC explained that initial decommissioning activities such as dismantlement are not significantly different from routine operational activities such as replacement or refurbishment. See Decommissioning Rule, 61 Fed. Reg. at 39,284. The NRC therefore concluded that these decommissioning activities do not present significant safety issues for which an NRC decision would be warranted. Id.

172 10 C.F.R. § 50.82(a)(6)(ii).

comprehensive GEIS. 173 The GEIS reflects the NRCs determination that decommissioning is 172F not itself a major federal action and it serves to establish an envelope of environmental impacts associated with decommissioning activities. 174 The NRCs Decommissioning GEIS 173F addresses the potential impacts associated with both the SAFSTOR and DECON decommissioning approaches (as well as a combination of both).

In a PSDAR, a licensee must provide its reasons for concluding that the environmental impacts associated with planned decommissioning activities are bounded by previously issued, relevant site-specific or generic environmental impact statements. 175 If a licensee contemplates 174F performing an activity with impacts not enveloped by previous environmental analyses, the licensee must submit a license amendment request, together with a supplemental environmental report evaluating the additional impacts. 176 Such a license amendment request 175F would be subject to a hearing opportunity.

m. Miscellaneous Claims Finally, as part of Contention I, Pilgrim Watch raises several additional claims that do not plausibly relate to the question of Holtecs financial condition, that are outside the scope of this license transfer proceeding, and that do not articulate admissible issues. These include (1) an apparent challenge to the 2002 Decommissioning GEISs consideration of risk coefficients per 173 See Decommissioning GEIS.

174 See Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), CLI-16-17, 84 NRC 99, 123 (2016) (quoting Decommissioning GEIS at 1-1).

175 10 C.F.R. § 50.82(a)(4)(i).

176 Vermont Yankee, CLI-16-17, 84 NRC at 123-24; Decommissioning GEIS at 1-11, 2-3; Decommissioning Rule, 61 Fed. Reg. at 38,283, 39,286. NRC regulations also prohibit a licensee from performing any decommissioning activities that foreclose release of the site for unrestricted use or result in a loss of reasonable assurance that adequate funds will be available for decommissioning. See 10 C.F.R. § 50.82(a)(6).

unit dose; 177 (2) a claim that Holtec assumes incorrect socioeconomic[] costs of 176F decommissioning; 178 (3) an environmental justice claim; 179 and (4) a claim that the impacts of 177F 178F radiological accidents are not bounded by the previously issued GEIS. 180 We therefore 179F conclude that Pilgrim Watchs Contention I is inadmissible.

177 Pilgrim Watch claims that Holtecs discussion of potential radiological dose to the public and workers is based on an outdated GEIS using outdated risk coefficients per unit dose. See PW Petition at 54-55. Pilgrim Watch does not suggest how any of its claims call into question Holtecs decommissioning cost estimate. Holtec states that even apart from Pilgrim Watchs claim falling outside the scope of this proceeding, the 2002 Decommissioning GEIS used risk coefficients from the BEIR V report, which Pilgrim Watch did not address, and the 2013 GEIS on license renewal discusses current risk coefficients based on the BEIR VII report, and the difference is within the margin of uncertainty associated with these estimates. See Applicants Answer to PW at 26 n.84 (citing Generic Environmental Impact Statement for License Renewal of Nuclear Plants (Final Report), NUREG-1437, rev. 1 (June 2013)).

178 See PW Petition at 56-57. Providing funding to pay for local emergency planning is not part of the site-specific decommissioning cost estimate.

179 See id. at 65.

180 See id. at 66-80. Pilgrim Watch claims that Holtecs cost estimates ignore the costs of mitigating radiological accidents. See id. at 66. But Holtec will carry onsite property damage insurance and offsite nuclear liability insurance in coverage amounts approved by the NRC.

Moreover, although the various claims of accident risk and accident impacts are outside of the scope of this transfer proceeding, we note that these claims do not even appear relevant to Holtecs PSDAR, which, pursuant to NRC regulations, addresses the environmental impacts associated with site-specific decommissioning activities. See 10 C.F.R. § 50.82(a)(4)(i). Most of Pilgrim Watchs arguments raise concerns about the potential environmental impacts of spent fuel storage in a pool or ISFSI, not the potential environmental impacts of decommissioning activities. See PW Petition at 66-80.

2. Pilgrim Watchs Contention II In Contention II, Pilgrim Watch argues that the license transfer request requires a NEPA environmental analysis and that the application is deficient for not including an ER; 181 that the 180F no significant hazards finding in 10 C.F.R. § 2.1315 does not apply; 182 the categorical exclusion 181F in 10 C.F.R. § 51.22(c)(21) does not apply; 182F 183 and that the environmental impacts of decommissioning are not bounded by previously issued environmental impact statements. 184 183F Among its arguments calling for a NEPA analysis, Pilgrim Watch states that a lack of sufficient funds to carry out decommissioning could result in significant adverse health, safety, and environmental impacts and further would increase the need for an updated site assessment and environmental impact statement. 185 We find that the categorical exclusion 184F applies to the license transfer and associated amendment and that therefore no additional NEPA analysis is required.

As an initial matter, Pilgrim Watch references 10 C.F.R. § 51.53(d) as support for its argument that the license transfer application needed to include an environmental report. 186 185F Section 51.53(d) refers to an applicant seeking a license amendment approving a license termination plan or decommissioning plan under § 50.82. Holtec seeks neither of these approvals at this time. 187 Following revisions to the decommissioning regulations in 1996, 186F power reactor licensees are no longer . . . required to have an approved decommissioning 181 See PW Petition at 82.

182 See id. at 87-89.

183 See id. at 89-90.

184 See id. at 87-123.

185 See id. at 123-25.

186 See id. at 82, 85.

187 Section 51.53(d) also applies to applicants for a license amendment authorizing decommissioning activities, which this proceeding likewise does not involve.

plan before undertaking major decommissioning activities. 188 The revised rules instead 187F instituted the requirement that licensees provide a PSDAR. 189 188F Pilgrim Watch also references 10 C.F.R. § 51.20(b)(9), which requires an environmental impact statement in proceedings for away-from-reactor ISFSIs licensed pursuant to 10 C.F.R. Part 72. 190 But no such licensing action is involved in this proceeding.

189F

a. Categorical Exclusion for License Transfers and Associated Amendments of License The NRC has determined, by rule, that certain categories of licensing actions do not individually or collectively have a significant effect on the environment. Except in the case of special circumstances as determined by the Commission, no environmental assessment or environmental impact statement is required for these categories of licensing actions, which are categorically excluded from the need to prepare an NRC analysis under NEPA. 191 A 190F categorical exclusion does not indicate the absence of an environmental review, but rather, that the agency has established a sufficient administrative record to show that the subject actions do not, individually or cumulatively, have a significant effect on the human environment. 192 191F After performing numerous environmental assessments for license transfer applications, which demonstrated no significant environmental effects linked to the transfers, the NRC determined that license transfers do not significantly affect the environment. 193 Pursuant to 10 192F C.F.R. § 51.22(c)(21), the NRC categorically excluded license transfer actions from the need to perform further environmental analysis. As the NRC explained in issuing the categorical 188 See Decommissioning Rule, 61 Fed. Reg. at 39,279. The reference in the regulation to a decommissioning plan relates to materials licensees. See id. at 39,290.

189 See id. at 39,281; 10 C.F.R. § 50.82(a)(4).

190 See PW Petition at 85.

191 See 10 C.F.R. § 51.22(b), (c).

192 Categorical Exclusions from Environmental Review, Final Rule, 75 Fed. Reg. 20,248, 20,251 (Apr. 19, 2010).

193 See Streamlined Hearing Process, 63 Fed. Reg. at 66,728.

exclusion rule, license transfers do not in and of themselves permit the licensee to operate the facility in a different manner than that permitted under the existing licenses. Therefore a license transfer would not usually present environmental impacts any different from those already considered in relevant generic or site-specific NEPA analyses. 194 Consequently, unless 193F we determine that special circumstances are present, an environmental assessment or environmental impact statement is not required for approvals of direct or indirect transfers of any license issued by the NRC and for any associated amendments of license required to reflect the approval of a direct or indirect transfer of an NRC license. 195 Here, the Staff concluded that 194F the license transfer action and the associated license amendment meet the criteria of the NRCs categorical exclusion rule in 10 C.F.R. § 51.22. 196 195F

b. Deletion of License Condition J (4)

Pilgrim Watch argues that Holtec erroneously relies on the generic determination that a license amendment that does no more than conform the license to reflect the transfer action[]

involves . . . no significant hazards consideration to avoid performing an environmental analysis of the transfer. 197 It argues that the deletion of license conditions relating to parent 196F company guarantees does more than conform the license to reflect the transfer. 198 As an 197F initial matter, Pilgrim Watch mistakes the significance of the no significant hazards consideration finding. Section 2.1315 allowed the Staff to issue the license on an immediately 194 See id.

195 10 C.F.R. § 51.22(c)(21).

196 See SER at 33 (mis-numbered as page 7).

197 PW Petition at 87-88; see 10 C.F.R. § 2.1315.

198 PW Petition at 88.

effective basis, but Holtecs justification for not submitting an environmental report with its application was the categorical exclusion found in 10 C.F.R. 51.22(c)(21).

The NRC imposed the parent company guarantee, (License Condition J (4)) when it approved the transfer of the Pilgrim operating license from the Boston Edison Company to ENGC in 1999. 199 As part of the previous transfer, Entergy International, a wholly owned 198F subsidiary of Entergy Corporation, offered contingency funding to ENGC via a specific Inter-Company Credit Agreement, which the Staff reviewed at the time of the transfer. 200 199F Through the license transfer currently before us, Entergy International no longer will be a corporate affiliate of the company that was called ENGC and now is renamed Holtec Pilgrim. 201 200F Holtecs proffered financial qualification demonstration relies only on the prepayment method of financial assurance, based on the funding accumulated in the trust fund estimated decommissioning cost. Had the Staff concluded that the trust fund by itself is insufficient, the Staff might have required additional financial assurance. Or alternatively, the Staff might have denied, limited, or otherwise conditioned the exemption. But the specific contingency funding provision is no longer an available financial assurance option. The proposed deletion of License Condition J (4) therefore was necessary to reflect the new financial qualification showing provided for applicants Holtec Pilgrim and HDI.

199 License Condition J (4) required ENGC to have access to a contingency fund of not less than fifty million dollars. See License Condition J (4).

200 See Safety Evaluation for the Proposed Transfer of Operating License and Materials License for Pilgrim Nuclear Power Station to Entergy Nuclear Generation Co. (Apr. 29, 1999), at 4, 9 (SER for 1999 License Transfer), Encl. 3 to Letter from Alan B. Wang, NRC, to Theodore A.

Sullivan, Boston Edison Co., and Jerry W. Yelverton, ENGC (Apr. 29, 2019) (ML011910099)

(noting that the contingency funding would be available as necessary to cover operating costs if projected revenues were temporarily lost due to an outage).

201 As the Applicants note, through the transfer sale, Entergy is extinguishing its interests in and responsibility for Pilgrim, and therefore no Entergy-related support agreement would continue following the sale. See Applicants Answer to Commonwealth at 17 & n.62. No such support is offered or relied on as part of the equity purchase and sale agreement or likewise as part of the license transfer application.

Accordingly, the license amendment associated with this transfer merely effectuated an approved transfer. In issuing the rule governing the categorical exclusion for license transfers the NRC stated that amendments effectuating an approved transfer present no safety questions and further that the NRC had determined that a new categorical exclusion should be added for license transfer actions and license amendments that effectuate the approved transfers. 202 201F In contrast, the NRC made clear what type of license amendment requests would not fall within the categorical exclusionany request for an amendment that would directly affect the actual operation of a facility. 203 The NRC observed based on its extensive experience with 202F such matters, the typical license transfer review consists largely of assuring that the ultimately licensed entity has the capability to meet financial qualification and decommissioning funding aspects of NRC regulations, and [t]hese financial capabilities . . . have no direct impact on the requirements governing a facilitys operations. 204 But those [a]mendments that directly affect 203F the actual operation of a facility remain subject to the environmental review requirements in 10 C.F.R. Part 51. 205 204F Here, the deletion of License Condition J (4) and of the three other financial license conditions imposed at the time of the 1999 license transfer do not directly affect the operation of the Pilgrim facility. Nor does deleting these financial conditions expand the activities authorized under the license. Therefore, we find that these deletions were administrative in nature and fall within the scope of the categorical exclusion in § 51.22(c)(21). 206 205F 202 See Streamlined Hearing Process, 63 Fed. Reg. at 66,728.

203 Id.

204 See id. at 66,722 (emphasis added).

205 See id. at 66,728.

206 The three other deleted financial conditions, License Conditions J (1), J (2), and J (3) pertained to specific actions to be taken at the time of the 1999 transfer and are on their face

In sum, a license transfer applicants reliance on different financial assurance methods than a current licensee would not normally present the potential for any new and significant risk of environmental harm. All applicants must demonstrate adequate financial qualification to take over the ownership and/or operation of a facility. The categorical exclusion rule applies even when an applicant does not rely on the same methods of showing financial qualification on which the current licensee relied. By deleting the four license conditions, the license amendment effectuated the approved transfer and thus falls within the scope of 10 C.F.R.

§ 51.22(c)(21).

c. Categorical Exclusion for Holtecs Application and Exemption Request Pilgrim Watch further argues that the categorical exclusion generally applicable to license transfers should not apply to this proceeding. Pilgrim Watch raises various arguments similar to those it raised in Contention I, in which it argued that the site is contaminated and Holtec does not know the extent of the contamination and therefore is not prepared to deal with it. 207 But, as we discussed above, these are issues associated with the future 206F decommissioning, not the transfer of the license, and are outside the scope of this proceeding.

Specifically, Pilgrim Watch challenges HDIs conclusion in its PSDAR that the environmental impacts associated with the planned decommissioning activities are less than and bounded by previously issued environmental impact statements. 208 Pilgrim Watch argues 207F that the impacts are not bounded by earlier environmental analyses because those analyses inapplicable here. See Application, Attach. A, Renewed Facility Operating License (Changes),

at 4; see also SER for 1999 License Transfer at 11-12.

207 PW Petition at 91,94-130.

208 Id. at 91; see also HDI PSDAR at 20; see also id. at 20-37 (providing reasons for conclusion).

either omitted crucial information or there is new information resulting from events that occurred after the previous [environmental impact statements] were issued. 209208F But if Pilgrim Watch has grounds to believe that the impacts of planned decommissioning, site restoration, and spent fuel management activities exceed those previously reviewed, its recourse is a petition for enforcement action to address HDIs representations in the Pilgrim PSDAR. 210 For the reasons described above, in this license 209F transfer proceeding the NRC will not approve the PSDAR or authorize any of the decommissioning, spent fuel management, and site restoration activities outlined in it. Although the site-specific decommissioning cost estimate that Holtec Pilgrim and HDI attached to the PSDAR bears directly on the financial assurance findings that are required to approve the license transfer, the environmental impacts of the activities described in the PSDAR do not. 211 210F Pilgrim Watchs various challenges to the environmental conclusions in the PSDAR accordingly fall outside the scope of this proceeding.

Finally, Pilgrim Watch argues that the categorical exclusion does not apply because Pilgrim Watch has asked for an environmental assessment. 212 Pilgrim Watch points to the 211F language in 10 C.F.R. § 51.22(b), which provides that environmental analyses are not required

[e]xcept in special circumstances as determined by the Commission upon its own initiative or upon request of any interested person. But the regulation simply allows an interested person to request that the Commission make the determination that special circumstances exist that warrant an exception to the categorical exclusion. 213 Pilgrim Watchs interpretationthat the 212F 209 PW Petition at 91.

210 See 10 C.F.R. § 2.206; see also id. § 50.82(a)(4)(i), (6)(ii).

211 See HDI PSDAR at 20-37.

212 See PW Petition at 89-90.

213 See 10 C.F.R. § 51.22(b).

categorical exclusion would not apply any time a petitioner asks that it not applywould circumvent the purpose of the regulation.

D. Supplemental Motions We also received several supplemental filings in support of the hearing requests. We address each briefly below.

1. New Decommissioning Activities Timeline Pilgrim Watch filed a motion to supplement its hearing request based on Holtecs change in the project timeline. 214 But Pilgrim Watch does not provide expert or factual support 213F indicating how the specific timeline change may materially impact the cash flow analysis or overall financial qualification demonstration. 215 There is no supported assertion of how the 214F timeline change might affect Holtecs costs, for example. Further, potential increased costs due to delays in decommissioning commonly are addressed by the contingency added to decommissioning cost estimates, and Pilgrim Watch provides nothing to challenge the assumption that potential added costs from the timeline change would be covered by Holtecs contingency allowance. To trigger an adjudicatory hearing, it is insufficient merely to claim that changes in the timing and duration of decommissioning plainly impact whether Holtec has adequate funding and whether the license transfer application should be granted or denied. 216215F Pilgrim Watch does not provide a supported challenge to Holtecs financial qualifications 214 See Pilgrim Watch Motion to Supplement its February 20, 2019 Motion to Intervene and Request for Hearing, its April 1, 2019 Reply to Petitioners, and its May 3, 2019 Motion to Supplement (Nov. 25, 2019).

215 Because we do not allow Pilgrim Watch to incorporate the contentions, arguments, and evidence of another petitioner unless it has first proposed its own admissible contention, we do not consider the evidence the Commonwealth filed in support of a similar motion concerning Holtecs timeline change. See Motion of the Commonwealth of Massachusetts to Amend its Petition with New Information (Dec. 13, 2019).

216 See id. at 5-6.

demonstration, and we therefore find that Pilgrim Watch has not raised an admissible contention. 217 216F

2. Motion Relating to Holtecs Announcement Regarding Acquisition of Indian Point Pilgrim Watch also filed a motion to supplement its hearing request with new information following a press release on April 16, 2019, by Entergy Corporation, in which Entergy stated its intention to sell Indian Point Units 1, 2, and 3 to Holtec. 218 217F Pilgrim Watch articulates its concern that Holtec will be decommissioning not just the Pilgrim and Oyster Creek sites simultaneously but also the Indian Point site. Pilgrim Watch states that the news about the additional units at Indian Point exacerbates its concerns about Holtecs financial ability to decommission Pilgrim. 219 But Pilgrim Watch does not raise a 218F supported dispute challenging Holtecs financial qualifications to be the owner and operator of Pilgrim.

Pilgrim Watch notes that the NRC Staff issued a Request for Additional Information (RAI) to Holtec, seeking more information to demonstrate that HDIs management and technical support organization will have sufficient resources (e.g., corporate structure, internal procedures, management and technical support organization staff capacities) to conduct licensed activities at both the Oyster Creek and Pilgrim sites. 220 But Pilgrim Watchs reference 219F to the RAI does not raise an admissible challenge to the application. The Staff simply requested additional information regarding HDIs management and technical support organization, a 217 Moreover, as a procedural matter, NRC regulations do not provide for motions to supplement a hearing request. Motions for leave to file new or amended contentions must be filed pursuant to 10 C.F.R. § 2.309(c)(1), which addresses the factors for filings submitted after the contention deadline.

218 See Pilgrim Watch Motion to Supplement its Motion to Intervene and Request for Hearing (Apr. 26, 2019).

219 See id. at 1-2.

220 See id. at 2 (quoting Request for Additional Information (Mar. 21, 2019) (ML19086A349)).

matter going to HDIs overall technical qualifications to conduct licensed activities at both Oyster Creek and Pilgrim. 221 The RAI does not raise a concern with Holtecs financial qualification to 220F conduct licensed activities. Moreover, Pilgrim Watch did not raise a challenge to HDIs technical qualificationsPilgrim Watch states that its motion is filed in support of its Contentions I (financial qualification) and II (NEPA claims). 222 We have found neither contention admissible, 221F and the additional information in the motion does not render either contention admissible.

3. Pilgrim Watch Motion to File a New Contention Pilgrim Watch also submitted a motion to file a new Contention III, raising licensee character claims. In support of Contention III, Pilgrim Watch argues that Holtec and SNC-Lavalin have a long-standing history of corruption, fraud, bribery and lying in connection with their corporations business dealings. 223 Pilgrim Watch claims that the NRC cannot grant 222F the license transfer without first investigating Holtec International, SNC-Lavalin, HDI, and CDI and without determining, based on the investigations, that each of them is trustworthy and reliable and otherwise possesses the character prerequisite to allowing it to participate in or control the decommissioning of Pilgrim Nuclear Power Station. 224 223F Pilgrim Watch claims that its contention is timely because it only learned upon reading our June 18, 2019, license transfer decision in Oyster Creek that the NRC conducted no background check and made no determination of trustworthiness and reliability of HDI, CDI, 221 Merely identifying a Staff RAI, which is a common Staff practice in seeking information as part of its review of applications, does not identify a genuine material dispute with an application. See, e.g., Oconee, CLI-99-11, 49 NRC at 336-37.

222 See Pilgrim Watchs Reply to Applicants Answer Opposing Pilgrim Watchs Motion to Supplement its Motion to Intervene and Request for Hearing (May 6, 2019), at 4. Pilgrim Watch again improperly casts its motion as merely a supplement but not an amendment to its hearing request. Id. NRC regulations do not provide for such supplements to hearing requests that are not filed under the contention admissibility regulations.

223 See Pilgrim Watch Motion to File a New Contention (July 16, 2019), at 10 (PW Motion to File New Contention).

224 Id. at 1.

Holtec, and SNC-Lavalin, and that the NRC has no intention of considering the trustworthiness, reliability, and character of these entities. 225 Pilgrim Watch also bases the timeliness of its 224F contention on a June 19, 2019, e-mail from an NRC Public Affairs officer responding to James Lamperts June 17, 2019, e-mail, in which Mr. Lampert inquired about whether NRC rules, regulations, or policies require a licensee to be deemed trustworthy and reliable. 226 Further, 225F Pilgrim Watch states that only on June 18, 2019, did it learn of a letterdated December 20, 2018from the NRC responding to other concerns expressed regarding Holtec International. 227 226F While the NRC has the discretion and the authority under the AEA to examine questions of licensee character, and we may admit for hearing a contention challenging an applicants or licensees character, there are no statutory or regulatory requirements mandating the NRC to conduct an investigation into the character of license transfer applicants and their owners.

Pilgrim Watchs references to regulatory requirements governing licensee programs for controlling access to nuclear power plants, including the use of background checks, therefore are not relevant to this license transfer proceeding. 228 227F Pilgrim Watch in fact makes clear that its contention does not seek to prove that Holtec, SNC-Lavalin, HDI, and CDI are untrustworthy and unreliable; rather its contention is that in order to grant the license transfer application, the NRC must first conduct an investigation into these companies character. 229 As warranted, the NRC examines allegations involving 228F management conduct, culture, or specific improper or illegal actions by licensees or their 225 See id. at 5.

226 See id. at 4-5; see also id., Ex. 1, E-mail from Neil Sheehan, NRC Public Affairs, to James Lampert (June 19, 2019).

227 See PW Motion to File New Contention at 4; see also id., Ex. 1, Letter from Dori L. Willis, NRC, to Kevin Kamps, BeyondNuclear.Org (Dec. 20, 2018) (Kamps Letter).

228 See id. at 19-20 (citing 10 C.F.R. § 73.56).

229 See Pilgrim Watch Reply to Applicants Answer Opposing Pilgrim Watchs Motion to File a New Contention (Aug. 19, 2019), at 2; see also PW Motion to File New Contention at 2-3.

personnel. But there is no requirement to conduct investigations into the corporate character of companies that submit applications to the NRC.

Moreover, we find the contention neither timely nor otherwise admissible. Motions for leave to file a new contention after the applicable deadline for contentions will not be entertained unless the information upon which the filing was based was not previously available; the information upon which the filing is based is materially different from information previously available; and the filing has been submitted in a timely fashion based on the availability of the information. 230 None of the three documents on which Pilgrim Watch relies to show timeliness 229F provides good cause for the delayed filing of Contention III.

Our decision in Oyster Creek did not set forth a new standard regarding contentions raising claims of licensee character. We reiterated a longstanding NRC standard that, to be admissible as a litigable matter in an adjudicatory proceeding, claims of deficient licensee character or integrity must have some direct and obvious relationship between the character issues and the licensing action in dispute. 231 We stated that claims of prior violations or events 230F involving a company must be directly germane to the challenged licensing action. 232 Our 231F decision does not justify the delayed submission of Contention III. Moreover, the claims regarding SNC-Lavalin that we referenced in Oyster Creek were not new matters; we noted that similar comments regarding SNC-Lavalin had been filed before the NRC in November 2018.

And the petitioner in that proceeding, the Township of Lacey, filed its petition to intervene raising the SNC-Lavalin claims in November 2018 as well. Our Oyster Creek decision therefore presents no new information that would serve as a basis for Contention III.

230 See 10 C.F.R. § 2.309(c)(1).

231 Oyster Creek, CLI-19-6, 89 NRC at 477 (quoting Dominion Nuclear Connecticut, Inc.

(Millstone Nuclear Power Station, Units 2 and 3), CLI-01-24, 54 NRC 349, 365 (2001)).

232 Id.

Nor does the June 19, 2019 e-mail from the NRCs Public Affairs officer, responding to a question from Mr. Lampert, provide a ground for timely filing. The e-mail merely reflected an effort to respond to Mr. Lamperts inquiry regarding NRC regulations and policy. It does not contain new and materially different information than information previously available.

Lastly, Pilgrim Watch states that it only learned of a December 2018 letter, which Pilgrim Watch cited in support of Contention 3, from the NRC in June 2019. 233 The letter responded to 232F an allegation against Holtec raised by Mr. Kamps and the Beyond Nuclear organization. But Pilgrim Watch does not indicate that it could not have known earlier of the referenced allegations against Holtec, which involved alleged events that took place between 2000 and 2004. 234 Indeed, Pilgrim Watch in its proposed contention cites to information provided by 233F Mr. Kamps and Beyond Nuclear relevant to these allegations that date back to as early as 2015. 235 Pilgrim Watch does not dispute that the allegations were in the public domain but 234F states it was not aware earlier of them, and that it is basing the timeliness of its claim on new information in the NRCs letter. There is, however, no new information in the letter that supports Contention III. The letter states, for example, that Mr. Kamps did not provide specific information or details pertaining to any activities that could be in violation of NRC regulations.

The letter further states that the individual to whom a purported bribe was offered is deceased and therefore the NRC could not obtain additional information regarding the attempted bribe. 236 235F 233 See PW Motion to File New Contention at 4.

234 See id., Ex. 1, Kamps Letter, Enclosure.

235 See id. at 16 & nn. 9-10.

236 See id., Ex. 1, Kamps Letter, Enclosure.

To be sure, Pilgrim Watch raises numerous claims concerning SNC-Lavalin. 237 But as 236F Pilgrim Watch notes, these are longstanding claims that have been reported in [n]umerous news media. 238 They are not new. And many of the claims involving SNC-Lavalin involve 237F alleged wrongdoing in other countries; Pilgrim Watch does not link any of the alleged improprieties with the Pilgrim facility. We have stated that [a]bsent strong support for a claim that difficulties at other plants run by a corporate parent will affect the plant(s) at issue before the Commission, we are unwilling to use our hearing process as a forum for a wide-ranging inquiry into the corporate parents general activities across the country. 239 In this case, Pilgrim 238F Watch seeks that we link disparate international activities from years ago, with no obvious connection to nuclear power plant decommissioning or the Pilgrim facility, to this license transfer action merely because the international co-parent of CDI was involved in those actions. But Pilgrim Watch provides no adequate link between SNC-Lavalin and this license transfer.

Pilgrim Watch also raises concerns regarding Holtecs Chief Executive Officer (CEO).

These claims include asserted false or misleading statements in a 2014 application submitted to New Jersey government officials. 240 But the article that Pilgrim Watch cites reflects that New 239F Jersey has a task force looking into matters that include the allegation. 241 If the investigation 240F into the actions in New Jersey results in findings that bear on Holtecs applications pending before the NRC or on its licensed activities, we will consider the findings and respond as appropriate. Here, however, Pilgrim Watch has not established a direct and obvious 237 See id. at 10-14; id., Ex. 2 at 29-32.

238 See id. at 10.

239 Power Authority of the State of New York (James A. Fitzpatrick Nuclear Power Plant; Indian Point, Unit 3), CLI-00-22, 52 NRC 266, 312 (2000).

240 See PW Motion to File New Contention at 14-15; id., Ex. 2 at 33-35.

241 See Nancy Solomon and Jeff Pillets, A False Answer, a Big Political Connection and $260 Million in Tax Breaks, (May 23, 2019), available at https://www.propublica.org/article/holtec-international-george-norcross-tax-breaks (last visited July 2, 2020).

relationship between the claim and this license transfer action. To avoid open-ended inquiries into matters ultimately unrelated to NRC-licensed activities, we have limited contentions raising claims of poor or improper management or character to claims that relate directly to the proposed licensing action. 242 Pilgrim Watchs motion is both untimely and does not raise an 241F admissible contention related directly to the license transfer application. We therefore deny it.

4. Pilgrim Watch Motion on Biodiversity Finally, Pilgrim Watch filed a motion to supplement its request for hearing with what it asserts is new and significant information regarding biodiversity. 243 The motion references a 242F New York Times article describing a report by the United Nations on biodiversity and ecosystem services. 244 Pilgrim Watch argues that the report and related United Nations statement is 243F relevant to its Contention II on the environmental impacts of decommissioning and that it is relevant to its claim in Contention I that Holtecs cost estimate is inaccurate. We deny the motion.

As we have noted, our regulations do not provide for a motion to supplement a hearing request. Pilgrim Watch does not address the timeliness factors for filing a new or amended contention under 10 C.F.R. § 2.309(c)(1). In any event, the asserted biodiversity issue is 242 Millstone, CLI-01-24, 54 NRC at 366 (quoting Georgia Institute of Technology (Georgia Tech Research Reactor), CLI-95-12, 42 NRC 111, 120 (1995)). In addition, Pilgrim Watch quotes a letter that was sent from the New Mexico Commissioner of Public Lands to Holtecs CEO, with copies to the NRC Chairman and the Secretary of Energy. See PW Motion to File New Contention at 15-16; see also id., Ex. 2 at 36-37 (Letter from Stephanie Garcia Richard, Commissioner of Public Lands, to Krishna Singh, President and CEO of Holtec (June 19, 2019)). The letter states that Holtec made misrepresentations to the NRC in its application for a nuclear waste storage facility in New Mexico. We are aware that this letter has been submitted by a petitioner in the Holtec International (Hi-Store Consolidated Interim Storage Facility) (CISF) proceeding on the waste disposal facility application, which that letter concerns. This matter is already under consideration in the Holtec CISF proceeding, to which the claims directly pertain.

Pilgrim Watchs motion, however, does not draw a direct link between the New Mexico Commissioner of Public Lands letter and this license transfer proceeding.

243 Pilgrim Watch Motion to Supplement its Motion to Intervene and Request for Hearing -

Biodiversity (May 9, 2019).

244 See id. at 1-2.

outside the scope of this proceeding. In addition, Pilgrim Watch does not explain how the asserted biodiversity concerns would impact decommissioning costs and therefore fails to raise a genuine dispute challenging Holtecs cost estimate. The motion therefore does not render Pilgrim Watchs Contention I admissible.

III. CONCLUSION For the reasons outlined in this decision, we deny Pilgrim Watchs request for hearing and petition to intervene.

IT IS SO ORDERED.

For the Commission Annette Digitally signed by Annette L.

L. Vietti- Vietti-Cook Date: 2020.11.12 Cook 10:14:40 -05'00' Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, This 12th day of November 2020.

Commissioner Baran, Dissenting In this license transfer proceeding for the Pilgrim Nuclear Power Station, Pilgrim Watch submitted one contention challenging the Applicants financial qualifications and a second contention arguing that NRC did not meet its obligations under the National Environmental Policy Act (NEPA). The majority decision finds both contentions inadmissible and denies Pilgrim Watchs request for a hearing. In my view, the majority decision takes an overly strict approach to contention admissibility and inappropriately delves into and decides the merits of aspects of the contentions. It also downplays the importance of the financial qualifications review at the time of license transfer. Therefore, I respectfully dissent. I would admit aspects of both Pilgrim Watch contentions and find that Pilgrim Watch has standing to pursue those contentions at a hearing.

I. BACKGROUND NRC regulations require a license transfer applicant like Holtec to demonstrate its financial and technical qualifications. 1 As the Pilgrim reactor is permanently shut down, Holtec 244F must demonstrate that it has the financial qualifications both to complete radiological decommissioning and to manage spent fuel until it is removed from the site. Because the exemption issued by the NRC Staff allows Holtec to withdraw funds from the decommissioning trust fund for non-radiological site restoration, those site restoration costs are also relevant to our review.

Holtec relies solely on the funding in the Pilgrim decommissioning trust fund to demonstrate its financial qualifications. At the time of the license transfer closing, the trust fund contained $1.03 billion. The cash flow analysis in Holtecs application projects that approximately $3.6 million will remain in the trust fund in 2063, by which time Holtec expects the 1 See 10 CFR § 50.82(a)(8)(i)(B) and (C); 10 CFR § 50.80(b)(1)(i).

spent fuel to be removed from the site. Holtecs application projects that, by the end of 2027,

$210 million will remain in the fund for spent fuel management (the maintenance and oversight of the Independent Spent Fuel Storage Installation (ISFSI) until 2063).

II. PILGRIM WATCHS CONTENTION I ON FINANCIAL QUALIFICATIONS In its financial qualifications contention, Pilgrim Watch argues that the Applicants have not presented sufficient evidence to NRC of adequate financial assurance to meet regulatory requirements. 2 Pilgrim Watch contends that Holtecs decommissioning cost estimate (on which 245F the license transfer application relies) is insufficiently detailed and inadequately supported. In its timely Motion to Supplement, Pilgrim Watch provides additional factual support for this contention by including new information related to a planned delay in Holtecs decommissioning schedule. The Motion to Supplement should be granted.

This element of Pilgrim Watchs financial qualifications contention is admissible. Pilgrim Watch argues that Holtecs new plan to take an additional two years or more to complete decommissioning and site restoration renders Holtecs cash flow analysis inaccurate. Holtecs application does not account for this delay, and Pilgrim Watch raised a material dispute over whether increased project management and overhead costs from the schedule change would exceed the projected $3.6 million trust fund surplus by a substantial margin. Based on the information before us, I find that Pilgrim Watch has raised a genuine factual dispute about whether potential increased costs due to the timeline change will have a material impact on Holtecs financial qualification demonstration.

Holtec may be able to obtain damages from the Department of Energy for partial breach of contract as a result of the Departments failure to take title to Pilgrims spent fuel. However, these potential litigation recoveries are not part of the financial qualifications demonstration in 2 Pilgrim Watch Petition to Intervene and Hearing Request (Feb. 20, 2019) (Pilgrim Watch Petition) at 14-15.

Holtecs application. As a result, this potential source of future funding cannot be considered in assessing the admissibility of Pilgrim Watchs contention.

Pilgrim Watch has raised a genuine issue of material fact regarding the adequacy of Holtecs cost estimates. Therefore, this aspect of Pilgrims Watchs Contention I should be admitted for hearing. A hearing is the proper forum for examining whether any license conditions, such as requiring Holtec to deposit some portion of the litigation recoveries into the decommissioning trust fund, are necessary to ensure the overall adequacy of spent fuel management funding.

III. PILGRIM WATCHS CONTENTION II ON NEPA In Contention II, Pilgrim Watch argues that a NEPA environmental analysis must be prepared as part of the agencys review of Holtecs license transfer application. Pilgrim Watch points to the potential negative environmental consequences of insufficient funding to complete radiological decommissioning, perform site restoration, and manage Pilgrims spent fuel until it is removed from the site. Holtec contends that an Environmental Assessment (EA) or Environmental Impact Statement (EIS) is not required because license transfers fall under a categorical exclusion established by NRC regulations. Pilgrim Watch and Holtec both recognize that NRC regulations provide a categorical exclusion for at least some license transfer applications. They disagree about whether the categorical exclusion applies in this particular case.

The categorical exclusion in 10 C.F.R. § 51.22(c)(21) applies to [a]pprovals of direct or indirect transfers of any license issued by NRC and any associated amendments of license required to reflect the approval of a direct or indirect transfer of an NRC license. The dispute centers on the meaning of required to reflect and the application of that phrase to the facts of this case. As the majority decision explains, the Staff issued the license amendment reflecting the transfer and the name change, as well as the deletion of four financial license conditions imposed when the NRC approved the transfer of the Pilgrim license from the Boston Edison

Company. This included License Condition J (4), which had required ENGC to have access to contingency funding of not less than fifty million dollars ($50m) for payment, if needed, of Pilgrim operating and maintenance expenses, the cost to transition to decommissioning status in the event of a decision to permanently shut down the unit, and decommissioning costs. The condition specified that once the plant had shut down following a decision to decommission, Entergy Nuclear will use any remainder of the $50m contingency fund that has not been used to safely operate and maintain the plant to support the safe and prompt decommissioning of the plant, to the extent such funds are needed for safe and prompt decommissioning. 3 246F The majority decision also notes that although ENGCs name would be changed to Holtec Pilgrim, the same legal entity will continue to exist as Pilgrims owner before and after the transfer ENGC would be converted to a limited liability company and [] under applicable Massachusetts law on such a conversion, the converted entity is considered to be the same entity as that which existed prior to the conversion. 4 247F Pilgrim Watch argues that dropping the substantive license condition providing for a

$50 million contingency fund was not required to reflect the approved license transfer. 5 This is 248F because the $50 million license condition was applied to ENGC, which will continue to exist after the license transfer under the name Holtec Pilgrim. According to Pilgrim Watch, Holtec and Entergy seek to do far more than conform the license to reflect the proposed transfer, which could have been accomplished by changing the name from ENGC to Holtec Pilgrim. 6 249F On the other hand, Holtec argues that removal of the $50 million contingency fund license condition merely conforms the license to reflect the proposed transfer, because Holtec Pilgrim and HDI are basing their financial qualifications on the adequacy of the [decommissioning trust 3

Memorandum and Order at 14-15 (quoting Letter from A. Christopher Bakken III, ENOI, to NRC Document Control Desk (Nov. 16, 2018), Encl. 1, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment, and Request for Exemption from 10 C.F.R. § 50.82(a)(8)(i)(A)(Application), Attach.

A, Renewed Facility Operating License (Changes), at 4, Condition J (4) (ML18320A031)).

4 Memorandum and Order at 3, n.9.

5 Pilgrim Watch Petition at 88.

6 Pilgrim Watch Reply to Applicants Answer Opposing Pilgrim Watch Petition for Leave to Intervene and Hearing Request (Apr. 1, 2019), at 26 (internal quotation marks and brackets omitted), 27.

fund] and are not relying on any parent support agreement or any other form of supplemental financial assurance to support their financial qualifications. 7 In Holtecs view, the deletion of 250F the license condition is an administrative amendment. 8 251F Thus, there is a clear dispute about the application of the categorical exclusion provision to the facts of this case. Pilgrim Watch and Holtec both make plausible arguments about whether NRC can rely on a categorical exclusion for the Pilgrim license transfer. The majority decision inappropriately digs into the merits of the competing claims and, without the benefit of a hearing, decides that Holtec should prevail. At this stage in the proceeding, what matters is that Pilgrim Watch has met the requirements for an admissible contention. The merits of this substantive factual dispute must be resolved at a hearing.

IV. PILGRIM WATCHS STANDING As Pilgrim Watch has submitted two admissible contentions, we must determine whether it has standing to pursue those contentions. In determining whether a petitioner has established standing, the Commission looks for guidance to judicial concepts of standing, which require a showing of a concrete and particularized injury (actual or threatened) that is fairly traceable to the challenged action and likely to be redressed by a favorable decision in the proceeding. 9 252F 7

Applicants Answer Opposing Pilgrim Watch Petition for Leave to Intervene and Hearing Request (Mar. 18, 2019), at 65.

8 Id.

9 See, e.g., Georgia Institute of Technology (Georgia Tech Research Reactor), CLI-95-12, 42 NRC 111, 115 (1995); USEC, Inc. (American Centrifuge Plant), CLI-05-11, 61 NRC 309, 311 (2005).

The asserted injury also must be arguably within the zone of interests protected by the governing statute. 10 253F Pilgrim Watch seeks admission as a party to intervene on behalf of its members and asserts that it has representational standing. 11 To establish representational standing, an organization 254F must demonstrate how at least one of its members may be affected by the challenged licensing action and would have standing in his or her own right. 12 The organization must identify that 255F member by name and address and demonstrate that the member has authorized the organization to request a hearing on his or her behalf. 13 Here, Pilgrim Watch included with its 256F hearing request the declarations of five of its members. 14 The declarants affirm that they reside 257F at distances ranging from approximately three to ten miles from Pilgrim.

In previous license transfer proceedings, the Commission found the concerns of nearby residents over a licensees financial ability to properly carry out and complete decommissioning sufficient to establish standing. 15 In the context of standing, the Commission has recognized 258F that inadequate decommissioning funding could lead to uncompleted decommissioning, and in turn that inadequate cleanup of the reactor site . . . may result in adverse health effects, loss of aesthetic enjoyment, and diminished property values for those who live, work or play in the immediate vicinity. 259F 16 10 Gulf States Utilities Co. (River Bend Station, Unit 1), CLI-94-10, 40 NRC 43, 47 (1994).

11 See Pilgrim Watch Petition at 6.

12 Vermont Yankee Nuclear Power Corp. and AmerGen Vermont, LLC, CLI-00-20, 52 NRC 151, 163 (2000).

13 Id.

14 See Declarations, attached as Ex. 1 to PW Petition at 133-143.

15 See, e.g., Vermont Yankee, CLI-00-20, 52 NRC at 163 n.4 (petitioner would like to walk and hike in the area after it is decommissioned and therefore claims an interest in sufficient funding being set aside for the decommissioning to be properly carried out).

16 See Yankee Atomic Electric Co. (Yankee Nuclear Power Station), CLI-98-21, 48 NRC 185, 207-09 (1998) (where petitioner resided approximately 6 miles away and walked and hiked in surrounding area); see also Sequoyah Fuels Corp. and General Atomics (Gore, Oklahoma

Consistent with these precedents, Pilgrim Watch has adequately demonstrated an injury in fact that is fairly traceable to the license transfer action. Pilgrim Watchs fundamental concern is that the Pilgrim site could be abandoned due to a lack of sufficient funding for decommissioning and spent fuel management, or that insufficient funding could prevent decommissioning work and spent fuel activities from being properly managed . . . according to applicable federal, state, and local requirements. 260F 17 It argues that underfunding may lead to cutting corners and that funding may prove inadequate to maintain the ISFSI long-term (including in the event the ISFSI is affected by a natural hazard, such as rising sea levels). 18 261F Pilgrim Watch members reside within a few miles of the facility and affirm that they frequently engage in recreational activities on the beaches and bays in the area of Pilgrim.

Moreover, Pilgrim Watch seeks a modification of the licenses to prevent potential underfunding. 262F 19 Insufficient financial qualifications, if demonstrated on the merits, can be remedied in this proceeding through financial license conditions or other means. Thus, the injury asserted by Pilgrim Watch can be redressed by a favorable decision in this proceeding.

Therefore, I find that Pilgrim Watch has standing to intervene in this proceeding.

V. CONCLUSION For these reasons, I would grant Pilgrim Watchs request for hearing and petition to intervene and admit the specified portions of Pilgrim Watchs Contention I and Contention II.

Site), CLI-94-12, 40 NRC 64, 75-76 (1994) (acknowledging link between adequacy of funding and ensuring safe and timely decontamination of site).

17 Pilgrim Watch Petition at 8.

18 See id. at 133 (Mary Lambert Declaration); 140 (Rebecca Chin Declaration); 142 (David OConnell Declaration).

19 See, e.g., Pilgrim Watch Petition at 134, 140.

Commissioner Hanson, dissenting in part I join in part, and dissent in part from the majoritys decision to dismiss Pilgrim Watchs petition for leave to intervene and request for a hearing in this license transfer proceeding. While I agree with the majoritys dismissal of Contention II, I would find that Pilgrim Watch has met the contention admissibility standards for certain aspects of Contention I and has demonstrated standing to intervene.

This license transfer proceeding presents the Commission with questions not answered by past cases or addressed by current guidance. NRC guidance describes the general information that needs to be included in an application of this type, but it does not elaborate on the level of detail that is expected or required to demonstrate reasonable assurance of adequate protection. While I agree with the majoritys conclusion that an applicant need not provide an exhaustive level of detail at this stage, the applicants estimates should have an articulated basis to inform not only the agency decisionmaker, but also the interested public. Pilgrim Watch raises a series of concerns in Contention I related to the cost estimates provided by the applicants, citing the slim margin provided in the application between the estimated costs and the projected amount in the decommissioning trust fund. 1 As specified below, I would find 263F certain aspects of Contention I admissible.

First, Pilgrim Watch challenges the lack of detail provided in the application to justify a 17% contingency factor. 2 The majority relies on past examples of contingency factors in other 264F cases to justify dismissing this concern and further states that the NRC does not have a minimum contingency requirement for the site-specific estimate. While this information is pertinent to determining an appropriate contingency factor, it does not address the issue raised by Pilgrim Watch in this contention admissibility proceeding. Namely, that there is a lack of 1

Pilgrim Watch Petition to Intervene and Hearing Request (Feb. 20, 2019) (PW Petition).

2 PW Petition at 22.

justification provided in the application for the choice of a 17% contingency factor. I would therefore find that this issue raises a genuine dispute with the applicants on a material issue, meeting 10 C.F.R. § 2.309(f)(1)(vi).

Second, Pilgrim Watch is concerned that decommissioning costs will rise faster than the rate of inflation and that these cost increases will result in a depletion of the decommissioning trust fund before final license termination. 3 Pilgrim Watch references an NRC document and 265F two studies that call into question the assumptions made in the application about the cost of decommissioning. 4 Pilgrim Watch further explains how a change in this assumption could 266F influence the overall cost estimate and impact the financial assurance provided by the decommissioning trust fund. 5 The majority evaluates the merits of Pilgrim Watchs supporting 267F evidence and holds it to a standard not anticipated by our regulations at the contention admissibility stage. Further, the majority relies heavily on Holtecs future obligation to submit annual decommissioning financial assurance status reports. But future requirements cannot fulfill the obligations of an applicant now. I would therefore find that that Pilgrim Watch raises a genuine dispute with the applicants on a material issue, meeting 10 C.F.R. § 2.309(f)(1)(vi).

In addition to the two issues raised in its initial petition for hearing, Pilgrim Watch submitted a motion to supplement its hearing request with additional information related to its concerns about a potential delay in schedule causing increased overhead costs and in turn, a deficiency in the amount available in the decommissioning trust fund. 6 This motion includes a 268F 3

See PW Petition at 24-25.

4 See PW Petition at 23-26; see also 2018 Nuclear Decommissioning Funding Study, Callan Investments Institute, at 3, 9; 2015 Nuclear Decommissioning Funding Study, Callan Investment Institute, at 3; NRC Questions and Answers, Encl. 5, SECY-11-0133 (ML111950031).

5 See PW Petition at 24-25.

6 See Pilgrim Watch Motion to Supplement its February 20, 2019 Motion to Intervene and Request for Hearing, its April 1, 2019 Reply to Petitioners, and its May 3, 2019 Motion to Supplement (Nov. 25, 2019).

Holtec presentation from November 2019, which Pilgrim Watch offers as support to demonstrate a delay in the schedule. Pilgrim Watch asserts that this delay is not accounted for in the current cost estimates and is therefore material to whether the decommissioning trust fund is adequate to demonstrate Holtecs financial assurance. 7 The majority rejects this additional information as 269F unsupported, stating that it does not explain how the delay could materially impact the cash flow analysis. Further, the majority opinion states that Pilgrim Watch does not challenge the assumption that the potential added costs from the timeline change would be covered by the contingency allowance provided in the application. In my view, Pilgrim Watch has addressed these precise issues adequately enough to meet the contention admissibility standards. Not only has Pilgrim Watch connected the dots between the delay in schedule and the potential impact on cost estimates, it separately challenges the assumptions underlying the contingency allowance as inadequate. Presentation of additional material or expert testimony is unnecessary at this stage in the proceeding to support the simple assertion that delays in schedule, on the order of years, could challenge a cost estimate. As this motion was based on information not previously available and filed promptly after the new information became available, I would find that that Pilgrim Watch has demonstrated good cause for an amended contention under 10 C.F.R. § 2.309(c)(1) and raised a genuine dispute with the applicants on a material issue pursuant to 10 C.F.R. § 2.309(f)(1)(vi).

I would further find that Pilgrim Watch has established representational standing in this proceeding pursuant to 10 C.F.R. § 2.309(d). The Pilgrim Watch petition includes declarations from members living within 10 miles of the site that have assented to representation. Further, Pilgrim Watch describes an injury in fact that is fairly traceable to the proceeding. Namely, that mismanagement of decommissioning activities or a shortfall in the decommissioning trust fund 7

See id. at 5-6.

could result in a radiological accident or radiological contamination with offsite consequences. 8 270F Finally, consistent with Commission precedent, I would allow Pilgrim Watch to adopt the contentions and supporting information submitted on behalf of the Commonwealth of Massachusetts because it has offered at least one admissible contention and established standing to intervene in this proceeding. 9271F 8

See PW Petition at 7-8.

9 Consolidated Edison Co. of New York (Indian Point Units 1 and 2), CLI-01-19, 54 NRC 109, 132-33 (2001).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. )

ENTERGY NUCLEAR GENERATION ) Docket Nos. 50-293 and 72-1044 LT COMPANY, HOLTEC INTERNATIONAL, )

and HOLTEC DECOMMISSIONING )

INTERNATIONAL, LLC )

)

(Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-20-12) have been served upon the following persons by Electronic Information Exchange.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the General Counsel Mail Stop: O-16B33 Mail Stop - O-14A44 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail.resource@nrc.gov Tison A. Campbell, Esq.

Anita G. Naber, Esq.

U.S. Nuclear Regulatory Commission David E. Roth, Esq.

Office of the Secretary of the Commission Rebecca A. Susko, Esq.

Mail Stop: O-16B33 Jeremy L. Wachutka, Esq.

Washington, DC 20555-0001 E-mail: Tison.Campbell@nrc.gov E-mail: hearingdocket@nrc.gov Anita.Naber@nrc.gov David.Roth@nrc.gov Atomic Safety and Licensing Board Panel Rebecca.Susko@nrc.gov U.S. Nuclear Regulatory Commission Jeremy.Wachutka@nrc.gov Washington, DC 20555-0001 E. Roy Hawkens, Chairman E-mail: Roy.Hawkens@nrc.gov Entergy Services, Inc.

101 Constitution Ave., NW Suite 200 East Washington, DC 20001 Susan H. Raimo E-mail: sraimo@entergy.com

Pilgrim Nuclear Power Station Docket Nos. 50-293 and 72-1044 LT COMMISSION MEMORANDUM AND ORDER (CLI-20-12)

Balch & Bingham LLP Pilgrim Watch 1710 Sixth Avenue North F148 Washington Street Birmingham, AL 35203-2015 Duxbury, MA 02332 Peter R. LeJeune, Esq Mary Lampert, Director Alan D. Lovett, Esq, E-mail: Mary.Lampert@comcast.net E-mail: plejeune@balch.com alovett@balch.com Counsel for the Commonwealth of Massachusetts:

Pillsbury Winthrop Shaw Pittman LLP Energy and Environmental Bureau 1200 Seventeenth Street, NW Office of the Attorney General Washington, DC 20036 One Ashburton Place, 18th Floor Meghan Hammond, Esq. Boston, Massachusetts 02108 David R. Lewis, Esq. Joseph Dorfler, Esq.

E-mail: Meghan.Hammond@pillsburylaw.com Seth Schofield, Esq.

David.Lewis@pillsburylaw.com E-mail: Joseph.Dorfler@state.ma.gov Seth.Schofield@mass.gov Digitally signed by Clara I.

Clara I. Sola Sola Date: 2020.11.12 10:18:50

-05'00' Office of the Secretary of the Commission Dated at Rockville, Maryland, this 12th day of November 2020.