Category:CONSTRUCTION PERMITS & AMENDMENTS
MONTHYEARML20246K4331989-08-29029 August 1989 Amends 11 & 10 to CPPR-126 & CPPR-127 to Reflect Reallocation of Ownership Interest in Plant ML20153C8051988-08-25025 August 1988 Corrected Amends 9 & 8 to CPPR-126 & CPPR-127,respectively, Reflecting Reallocation of Ownership Interest in Plant ML20151S8191988-08-10010 August 1988 Amends 9 & 8 to CPPR-126 & CPPR-127,respectively, Transferring Ownership from Texas Municipal Power Authority to Texas Utils Electric Co ML20107J2241984-10-26026 October 1984 Amend 8 to CPPR-126,incorporating Partial Exemption from GDC 4 of 10CFR50,App A,Granted on 840828.Licensee Not Required to Install Jet Impingement Shields in Eight Locations Per Loop in Primary Coolant Piping Sys ML20083G8791983-12-30030 December 1983 Amend 7 to CPPR-126 & CPPR-127,reflecting Change in Ownership of Facilities ML20071L4291982-08-27027 August 1982 Amends 6 to CPPR-126 & CPPR-127,increasing Allowable Annual Average Groundwater Withdrawal Rate from 30 Gpm to 40 Gpm Until Const Completion ML20050D2351982-03-29029 March 1982 Amends 5 & 5 to CPPR-126 & CPPR-127,respectively,reflecting Revised Ownership Interests by Tx Power & Light Co & Tex-La Electric Cooperative of Tx,Inc ML20038A8011981-09-30030 September 1981 Amend 4 to CPPR-126,reflecting Revised Ownership Interests of Utils ML20149B0631978-12-0404 December 1978 Amend 1 to CPPR-126 Re Deleting Requirement That Chlorine Minimization Study Be Performed & Results Submitted to NRC Prior to Docketing of Er,Ol Stage ML20149B0511978-12-0404 December 1978 Amend 1 to CPPR-127 Deleting Requirement That Chlorine Minimization Studyt Be Performed & Results Submitted to NRC Prior to Docketing of Er,Ol Stage 1989-08-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212L1501999-09-30030 September 1999 Amends 72 & 72 to Licenses NPF-87 & NPF-89,respectively, Changing Thermal Rated Power in Paragraph 2.C.(1) of FOL NPF-89 & TS 1.1 to 3445 Megawatts Thermal for Cpses,Unit 2 ML20212G8061999-09-22022 September 1999 Amends 71 & 71 to Licenses NPF-87 & NPF-89,respectively, Revising TSs for Cpses,Unit 1 to Define F* SG Tube Plugging Criteria in TS 5.5.9 & Associated Reporting Requirements in TS 5.6.10 ML20212G8361999-09-22022 September 1999 Amends 70 & 70 to Licenses NPF-87 & NPF-89,respectively, Changing TS 3.4.13,TS 5.5.9 & TS 5.6.10 to Implement 1.0 Volt SG Tube Repair Criteria for Cpses,Unit 1 ML20216F9311999-09-21021 September 1999 Amends 69 & 69 to Licenses NPF-87 & NPF-89,respectively, Revising SR 3.8.1.13, AC Sources- Operating to Clarify That Each Edg,Automatic,Noncritical Trips Bypassed on Either loss-of-offsite or Safety Injection Actuation Signal ML20211K0071999-08-31031 August 1999 Amends 68 & 68 to Licenses NPF-87 & NPF-89,respectively, Changing Licenses to Accurately Reflect New Legal Name of Licensee, Txu Electric Co ML20211J9461999-08-30030 August 1999 Amends 67 & 67 to Licenses NPF-87 & NPF-89,respectively, Removing Several cycle-specific Parameter Limits from TS & Adding Parameter Limits to COLR ML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20210N1581999-08-0303 August 1999 Amends 66 & 66 to Licenses NPF-87 & NPF-89,respectively, Correcting Number of Editorial Errors in TSs That Occurred with Issuance of License 64 Re ITSs Conversion TXX-9916, Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs1999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20205F9631999-04-0101 April 1999 Corrected Amend 64 to Licenses NPF-87 & NPF-89,respectively. Three Pages from TS Bases Section Were Inadvertently Omitted ML20198S1331998-12-29029 December 1998 Amends 62 & 48 to Licenses NPF-87 & NPF-89,respectively, Increasing AOT for Centrifugal Charging Pump from 72 H to 7 Days & Add Configuration Risk Mgt Program TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195J2611998-11-18018 November 1998 Amends 61 & 47 to Licenses NPF-87 & NPF-89,respectively, Taking Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 TXX-9819, Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld1998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld ML20248A1891998-05-22022 May 1998 Amends 60 & 46 to Licenses NPF-87 & NPF-89,respectively, Revising Section TS 3/4.8.1 to Reduce Min Fuel Oil Volume Requirements During Modes 5 & 6 for Operable EDG & Allow Continued Operable Status of DG During All Modes ML20216C3521998-05-0808 May 1998 Amends 59 & 45 to Licenses NPF-87 & NPF-89,respectively, Allowing One Time Basis Verification of Proper Operation of Unit 2 Load seal-in Contacts & DG Trip Bypass Contacts at Power & Crediting Performance of SR 4.8.1.1.2f.4 ML20217D3501998-04-20020 April 1998 Amends 58 & 44 to Licenses NPF-87 & NPF-89,respectively, Changing TS Re Load Shedding Feature of Motor Control Ctr & Auto Connected shut-down Loads Through Load Sequencer ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217H9171998-03-27027 March 1998 Amends 57 & 43 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves TXX-9807, LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power1998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20198F8491997-12-30030 December 1997 Amends 56 & 42 to Licenses NPF-87 & NPF-89,respectively, Changing TS Table 3.3-3, ESFAS Instrumentation Trip Setpoints ML20212G7731997-10-30030 October 1997 Amends 55 & 41 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints Based on Analyses of Core Configuration for Unit 2 Cycle 4 ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS ML20210M6131997-08-18018 August 1997 Amends 54 & 40 to Licenses NPF-87 & NPF-89,respectively, Revising TS 3.7.1.5 to Increase AOT for One Inoperable MSIV While in Mode 1 TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20129D9291996-10-22022 October 1996 Amends 53 & 39 to Licenses NPF-87 & NPF-89,respectively, Changing Acceptance Values for Ameres & Voltage for 18 Month Surveillance Test of Battery Chargers ML20129E4761996-09-30030 September 1996 Amends 52 & 38 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & New N-16 Setpoint Values & Parameters for Unit 1 & Ref to TR RXE-95-001-P ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B7061996-06-25025 June 1996 Errata to Amends 51 & 37 to Licenses NPF-87 & NPF-89, Respectively,Correcting TS Pp 6-7 for Plant Units 1 & 2 ML20113B6981996-06-25025 June 1996 Errata to Amends 50 & 36 to Licenses NPF-87 & NPF-89, Respectively,Correcting TS Pp 6-1 & 6-2 for Plant Units 1 & 2 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info ML20114E3681996-06-13013 June 1996 Amends 51 & 37 to Licenses NPF-87 & NPF-89,respectively, Revising TS to Reflect Approval for Use of New Containment Leakage Rate Testing Program 1999-09-30
[Table view] |
Text
_.. _ _ _ ____
o Cg-UNITED STATES F
- E T g.
NUCLEAR REGULATORY COMMISSION
-5 "E-WASHINGTON, D. C. 20555
%4....$
TEXAS UTILITIES ELECTk!C COMPANY. ET AL*
DOCKET NO. 50-445 COMANCHE PEAK STEAN ELECTRIC STATION, UNIT I AMENDNENT TO C0h51RUCTION PtRMIT-Amendment No. 11 Construction Pemit No. CPPR-126 1.
The issuance of this amendment complies with the standards ard requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's
- t regulations set forth 'in 10 CFR Chapter I; B.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and C..
The issuance of this amendment will not result in any environmental
-impacts not previously considered in accordance with 10 CFR Part 51.
2.
Accordingly, Construction Permit No. CPPR-126 is amended to show the transfer of 2-1/6% ownership interest from Tex-La Electric Cooperative of Texas, %c. to Texas Utilities' Electric Company.
All references to applicants" she.ll exclude: Tex-La Electric Cooperative of Texas, Inc.
3, This amendment is effective as of the date of the completion of the transfer of the ownership interest herein described, s
FOR THE NUCLEAR REGULATORY COMMISSION Cd Christopher
'L.Qnis
. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation Date of Issuance: August 29, 1989
' TI.e current Construction Pem1t holders for the Comanche Peak Steam Electric S
Station are: Texas Utilities Electric Company and Texas Municipal Power Agency.
Transfer of ownership from Texas Municipal Power Agency to Texas Utilities Electric Company was previously authorized by Amendments No. 9 and No. 8 to Construction Permits CPPR-126 and CPPR-127, respectively, on August 25, 1988 l
to take place in 10 installments as set forth in the Agreement attached to the application for Amendment dated March 4, 19EO. At the completion thereof, Texas Municipal Power Agency is no longer an applicant or construction permit holder.
m e909050469 890829 FDR ADOCK 05000445 9K A
FDC
[
}
UNITED STATES
-l NUCLEAR REGULATORY COMMISSION 5
WASHING TON, D. C. 20555 3
%...../
3 TEXAS UTILITIES ELECTRIC COMPANY ET AL*
~DOCKtT NO. 50-446 COMANCHE PEAX 5IEAN ELECIEC STATION UNI AMENDNENT TO CONSTRUCTION PERMIT Amendment No. 10 Construction Pemit No. CPPR-127 1.
The issuance of this amendment complies with the standard of the Atomic Energy Act of 1954, as amended (the Act) and s and requirements regulations set forth in 10 CFR Chapter I; mmission's B.
defense and security or to the health and safe e common e public; and C.
The issuance of this amendment will not result in any envi impacts not previously considered in accordance with 1 ronmental 2.
Accordingly, Construction Pemit No. CPPR-126 is amended t transfer of 2-1/6% ownership interest from Tex-La Elect i o show the Texas, Inc. to Texas Utilities Electric Company r c Cooperative of of Texas. Inc.All references to " applicants" shall exclude:
Tex-La Electric Cooperative 3.
of the ownership interest herein described.This amend on of the transfer s
FOR THE NUCLEAR REGULATORY C09t N
RAJLA M
34 Christopher I. Grimes, Director Comanche Peak Project Divfsion Office of Nuclear Reactor Regulation Date of Issuance: August 29, 1989
- The current Construction Permit holders Ste. tion are:
Transfer of ownership from Texas Municipal Power Agency t Electric Company was previously authorized by Amendments N o Texas Utilities Construction Permits CPPR-126 and CPPR-127, respectively
- o. 9 and No. 8 to to take place in 10 installments as set forth in the A
, on August 25, 1988 application for Amendment dated March 41988.
greement attached to the Municipal Power Agency is no longer an a,pplicant or constAt the com ruction permit holder.
O
-