Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211J40327 August 1999Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted
ML20211G30426 August 1999Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation
ML20210R68813 August 1999Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl
ML20209E1789 July 1999Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs
TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power23 June 1999LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power
ML20195E5314 June 1999Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative
ML20195B64127 May 1999LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TSEnforcement Discretion
Probabilistic Risk Assessment
Missed surveillance
ML20195B65724 May 1999LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner
ML20206T52314 May 1999Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,EnclSafe Shutdown
Fuel cladding
Fire Protection Program
ML20206G7054 May 1999LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections
TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl21 December 1998Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,enclSafe Shutdown
Boric Acid
Exemption Request
ML20195F16113 November 1998LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt ProgramProbabilistic Risk Assessment
Large early release frequency
ML20195F51911 November 1998LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5Anticipated operational occurrence
ML20154C8972 October 1998Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld
TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl9 April 1998LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,enclSafe Shutdown
Enforcement Discretion
ML20216B1326 April 1998Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRsSafe Shutdown
Enforcement Discretion
Missed surveillance
ML20217A38418 March 1998LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at PowerEnforcement Discretion
ML20248L31612 March 1998Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f
ML20216D5849 March 1998Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 OnlySafe Shutdown
Missed surveillance
TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint27 February 1998Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level SetpointStroke time
ML20203J49225 February 1998Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance RequirementsSafe Shutdown
Enforcement Discretion
Missed surveillance
ML20212C38024 October 1997Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TSAnticipated operational occurrence
TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint16 May 1997Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt SetpointAnticipated operational occurrence
ML20141C92715 May 1997Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 EnclTime of Discovery
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Enforcement Discretion
Missed surveillance
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Pressure Boundary Leakage
ML20116F0422 August 1996LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 DaysProbabilistic Risk Assessment
ML20116F35631 July 1996Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both UnitsAnticipated operational occurrence
ML20116E84731 July 1996Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs
ML20115E79910 July 1996Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution RoomSafe Shutdown
Fire Protection Program
ML20115C9279 July 1996LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1
ML20113B58321 June 1996Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl InfoStroke time
TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B12 March 1996Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option BExemption Request
ML20100J06122 February 1996Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed
ML20096B3185 January 1996Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes OnlySafe Shutdown
Enforcement Discretion
ML20094N61621 November 1995Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant
TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 321 November 1995LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3Anticipated operational occurrence
ML20087J79215 August 1995LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing
ML20087K17215 August 1995Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TSShutdown Margin
ML20087E25211 August 1995Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys
ML20083M85312 May 1995Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16Shutdown Margin
TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1 May 1995Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs
ML20082C6403 April 1995Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio
TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps28 February 1995LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps
ML20079B47230 December 1994LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity EnclFuel cladding
ML20078R80719 December 1994Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass
ML20078S08919 December 1994Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs
ML20077F0887 December 1994License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively ControlledStroke time
Probabilistic Risk Assessment
ML20077F1956 December 1994Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil
ML20078K74618 November 1994LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor
ML20077A70718 November 1994LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01Safe Shutdown
ML20078G72811 November 1994Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test FrequencySafe Shutdown