ML20071L429

From kanterella
Jump to navigation Jump to search
Amends 6 to CPPR-126 & CPPR-127,increasing Allowable Annual Average Groundwater Withdrawal Rate from 30 Gpm to 40 Gpm Until Const Completion
ML20071L429
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/27/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20071L431 List:
References
NUDOCS 8209220056
Download: ML20071L429 (6)


Text

_

l s

TEXAS UTILITIES GEllERATING C0!! patly DALLAS POWER & LIGHT COMPANY TEXAS ELECTRIC SERVICE COMPAliY TEXA5 POWER & LIGHT COMPANY TEXA5 HUNICIPAL POWER AGENCY BRAZOS ELECTRIC POWER COOPERATIVE, INC.

TEX-LA ELECTRIC COOPERATIVE OF TEXA5, INC.

1 DOCKET !!0. 50-445 COMAllCHE PEAK STEAM ELECTRIC STATION, UNIT 1 AllENDMEllT TO C0!!STRUCTION PERMIT Amendment No. 6 I

Constr Jction Permit CPPR-126 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Texas utilities Generating Company on its own behalf and on the behalf of the other Applicants (the Applicants) dated July 26, 1982, complies with the standards and requiremeats of the Atomic Energy Act of 1954 as amended (the Act), and t.he Connission's rules and i

regulations set forth in 10 CFR Chapter I; B.

The issuance of this amendment will not be ininical to the common defense and security or to the health and safety of the public; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public and (11) that such activities will be conducted in accordance with the Commission's regulations.

D.

The issuance of this anendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirenents have been sstisfied.

2.

Accordingly, the Nuclear Regulatory Connission has issued Amendment j

!!o. 6 to Construction Permit No. CPPR-126.

The amendment changes Condition 3.E(8) of CPPR-126 to read as follows:

4.

"""~

8209220056 820027 PDR ADOCK O5000445 A

PDR suauaue,

oc q me ronu m po ao) mcu om OFFICIAL RECORD COPY usam m-mm

/

TEXAS UTILITIES GENERATING C0ftP/.HY DALLAS POWER & LI6 tit COMPANY TEXA5 ELECTRIC SERVICE COMPANY

/

TEXA5 POWER & LIGliT COMPANY TEXA5 MdNICIPAL POWER AGE!4CY BRAZO5 ELECTRIC POWER COOPERATIVE, INC..

TEX-LA ELECTRIC COOPERATIVE OF TEXAS, INC.

DOCKET HO. 50-445 C0!!ANCHE PEAK STEAft ELECTRIC STATIO9, UNIT 1

/

f.rnt,rs tijj_ CONSTRUCTION PERMIT Amendment No. 6 Construction Pemit CPPR-126 1.

The Nuclear Regulatory Comission (the'Comission) has found that:

The application for amendment Texas Utilities Generating A.

Company on its own behalf and,b on the behalf of the other Applicants (the Applicants,/dateJ July 26, 1982, conplfes with the standards and rpquirements of the Atomic Energy Act of 1954, as anended (ttJe Act), and the Commission's rules and regulations set forth/In 10 CFR Chapter I;

/

B.

The issuance of tlyts anendment will not be ininical to the comnon defense a d security or to the health and safety of the public; C.

There is reosonable assurance (f) that the activities authorized /by this amendment Can be Conduct 0d without endangerjng the health and safety of the public and (ii) that such activities will be conducted in accordance with th'e Connission's regulations.

The/ssuance of this amendment is in accordance Alth 10 CFR D.

i P, art 51 of the Comission's regulations and all apolicable

/, requirements have been satisfied.

i l

2.

Accordingly, the Nuclear Regulatory Commission has issue 1 Amendment i

No. 6 to Construction Pemit flo. CPPR-126. The amendnent changes

' Condition 3.E(8) of CPPR-126 to read as follows:

I i

t omee >

suamueb ee >

OFFICIAL RECORD COPY uso,o... -m.ca i anc mnu m oow mcu ono

4 Arnendment 6 2-(8) The rate of groundwater withdrawal is restricted to an annual average of 40 gpm for the site until construction is completed.

3.

This amendment is effective as of date of issuance.

FOR THE HUCLEAR REGULATORY C0ftMISSION

!sf IZe.Le r4 f""r

J-e r Darrell G. Eisenhut Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance: AUG 2 7 N j

i i

i 1

i

,. w/

MGM(L m

hP4

.......(........'..

DL:AD/L OELD 4*

D.L:LB 1.....DL:LB#1

. D:L(#I OF F tcE >

.s.a.<i.s..

......o.4t.:

........w.n u..t....

.ue-o

..sefza.2...... 8.y.!Ls.2.,...,,8tp.jtaa.

.8.g 82.......,. 8 th2/.8 2........
8... 8 2.....

om>

l enc ronu ais o+aomacu ono OFFICIAL RECORDYDPY usom ini-mea

.-