|
---|
Category:CONSTRUCTION PERMITS & AMENDMENTS
MONTHYEARML20246K4331989-08-29029 August 1989 Amends 11 & 10 to CPPR-126 & CPPR-127 to Reflect Reallocation of Ownership Interest in Plant ML20153C8051988-08-25025 August 1988 Corrected Amends 9 & 8 to CPPR-126 & CPPR-127,respectively, Reflecting Reallocation of Ownership Interest in Plant ML20151S8191988-08-10010 August 1988 Amends 9 & 8 to CPPR-126 & CPPR-127,respectively, Transferring Ownership from Texas Municipal Power Authority to Texas Utils Electric Co ML20107J2241984-10-26026 October 1984 Amend 8 to CPPR-126,incorporating Partial Exemption from GDC 4 of 10CFR50,App A,Granted on 840828.Licensee Not Required to Install Jet Impingement Shields in Eight Locations Per Loop in Primary Coolant Piping Sys ML20083G8791983-12-30030 December 1983 Amend 7 to CPPR-126 & CPPR-127,reflecting Change in Ownership of Facilities ML20071L4291982-08-27027 August 1982 Amends 6 to CPPR-126 & CPPR-127,increasing Allowable Annual Average Groundwater Withdrawal Rate from 30 Gpm to 40 Gpm Until Const Completion ML20050D2351982-03-29029 March 1982 Amends 5 & 5 to CPPR-126 & CPPR-127,respectively,reflecting Revised Ownership Interests by Tx Power & Light Co & Tex-La Electric Cooperative of Tx,Inc ML20038A8011981-09-30030 September 1981 Amend 4 to CPPR-126,reflecting Revised Ownership Interests of Utils ML20149B0631978-12-0404 December 1978 Amend 1 to CPPR-126 Re Deleting Requirement That Chlorine Minimization Study Be Performed & Results Submitted to NRC Prior to Docketing of Er,Ol Stage ML20149B0511978-12-0404 December 1978 Amend 1 to CPPR-127 Deleting Requirement That Chlorine Minimization Studyt Be Performed & Results Submitted to NRC Prior to Docketing of Er,Ol Stage 1989-08-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212L1501999-09-30030 September 1999 Amends 72 & 72 to Licenses NPF-87 & NPF-89,respectively, Changing Thermal Rated Power in Paragraph 2.C.(1) of FOL NPF-89 & TS 1.1 to 3445 Megawatts Thermal for Cpses,Unit 2 ML20212G8061999-09-22022 September 1999 Amends 71 & 71 to Licenses NPF-87 & NPF-89,respectively, Revising TSs for Cpses,Unit 1 to Define F* SG Tube Plugging Criteria in TS 5.5.9 & Associated Reporting Requirements in TS 5.6.10 ML20212G8361999-09-22022 September 1999 Amends 70 & 70 to Licenses NPF-87 & NPF-89,respectively, Changing TS 3.4.13,TS 5.5.9 & TS 5.6.10 to Implement 1.0 Volt SG Tube Repair Criteria for Cpses,Unit 1 ML20216F9311999-09-21021 September 1999 Amends 69 & 69 to Licenses NPF-87 & NPF-89,respectively, Revising SR 3.8.1.13, AC Sources- Operating to Clarify That Each Edg,Automatic,Noncritical Trips Bypassed on Either loss-of-offsite or Safety Injection Actuation Signal ML20211K0071999-08-31031 August 1999 Amends 68 & 68 to Licenses NPF-87 & NPF-89,respectively, Changing Licenses to Accurately Reflect New Legal Name of Licensee, Txu Electric Co ML20211J9461999-08-30030 August 1999 Amends 67 & 67 to Licenses NPF-87 & NPF-89,respectively, Removing Several cycle-specific Parameter Limits from TS & Adding Parameter Limits to COLR ML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20210N1581999-08-0303 August 1999 Amends 66 & 66 to Licenses NPF-87 & NPF-89,respectively, Correcting Number of Editorial Errors in TSs That Occurred with Issuance of License 64 Re ITSs Conversion TXX-9916, Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs1999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20205F9631999-04-0101 April 1999 Corrected Amend 64 to Licenses NPF-87 & NPF-89,respectively. Three Pages from TS Bases Section Were Inadvertently Omitted ML20198S1331998-12-29029 December 1998 Amends 62 & 48 to Licenses NPF-87 & NPF-89,respectively, Increasing AOT for Centrifugal Charging Pump from 72 H to 7 Days & Add Configuration Risk Mgt Program TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195J2611998-11-18018 November 1998 Amends 61 & 47 to Licenses NPF-87 & NPF-89,respectively, Taking Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 TXX-9819, Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld1998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld ML20248A1891998-05-22022 May 1998 Amends 60 & 46 to Licenses NPF-87 & NPF-89,respectively, Revising Section TS 3/4.8.1 to Reduce Min Fuel Oil Volume Requirements During Modes 5 & 6 for Operable EDG & Allow Continued Operable Status of DG During All Modes ML20216C3521998-05-0808 May 1998 Amends 59 & 45 to Licenses NPF-87 & NPF-89,respectively, Allowing One Time Basis Verification of Proper Operation of Unit 2 Load seal-in Contacts & DG Trip Bypass Contacts at Power & Crediting Performance of SR 4.8.1.1.2f.4 ML20217D3501998-04-20020 April 1998 Amends 58 & 44 to Licenses NPF-87 & NPF-89,respectively, Changing TS Re Load Shedding Feature of Motor Control Ctr & Auto Connected shut-down Loads Through Load Sequencer ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217H9171998-03-27027 March 1998 Amends 57 & 43 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves TXX-9807, LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power1998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20198F8491997-12-30030 December 1997 Amends 56 & 42 to Licenses NPF-87 & NPF-89,respectively, Changing TS Table 3.3-3, ESFAS Instrumentation Trip Setpoints ML20212G7731997-10-30030 October 1997 Amends 55 & 41 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints Based on Analyses of Core Configuration for Unit 2 Cycle 4 ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS ML20210M6131997-08-18018 August 1997 Amends 54 & 40 to Licenses NPF-87 & NPF-89,respectively, Revising TS 3.7.1.5 to Increase AOT for One Inoperable MSIV While in Mode 1 TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20129D9291996-10-22022 October 1996 Amends 53 & 39 to Licenses NPF-87 & NPF-89,respectively, Changing Acceptance Values for Ameres & Voltage for 18 Month Surveillance Test of Battery Chargers ML20129E4761996-09-30030 September 1996 Amends 52 & 38 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & New N-16 Setpoint Values & Parameters for Unit 1 & Ref to TR RXE-95-001-P ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B7061996-06-25025 June 1996 Errata to Amends 51 & 37 to Licenses NPF-87 & NPF-89, Respectively,Correcting TS Pp 6-7 for Plant Units 1 & 2 ML20113B6981996-06-25025 June 1996 Errata to Amends 50 & 36 to Licenses NPF-87 & NPF-89, Respectively,Correcting TS Pp 6-1 & 6-2 for Plant Units 1 & 2 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info ML20114E3681996-06-13013 June 1996 Amends 51 & 37 to Licenses NPF-87 & NPF-89,respectively, Revising TS to Reflect Approval for Use of New Containment Leakage Rate Testing Program 1999-09-30
[Table view] |
Text
_
l TtXAS OllLITILS LLhlRATlhu COMPAdY l
UALLAd Puntr< G LibuT CunPANY l
lLXAd LLLLidlL bLKVlLL LUNP/U4Y ILAAS PUktK 6 Libnl CUitPA14Y TLXAd nuldblPAL PUhtK MLLieLY BRAZUS LLtClhlG Puwta LUUPttu+TlvL, lhC.
ILX-LA LLLLIdlL COUPtnAllVL Uf itXAS, it L.
00CKLT HO.60-44b Cuda 1.Catt PLAK STLAli ELLCTklc 5TA110N, ui41T 1 CunSTRUCTION PEh!IIT Aaendment no. 5 Construction Pennit No. CPPk-126 1.
The Nuclear Regulatory Conaission (the Cousaission) having found that:
A.
The application for amendment to Construction Pernit No. CPPR-126 transmitted by a Texas Utilities Generating Coupany letter, dated tiarch 10, 1962, for the purpose of reflecting revised percentage ownership interests in the Comanche Peak Stean Electric Station, Units 1 and 2, between Texas Power a Light Company and the Tex-La Electric Cooperative of Texas, Inc. complies with the standards and requirements of the Atomic Energy Act of 1954, as acenced, and the Comission's rules and regulations set forth in lu CFh Chapter I; The Texas Power 6 L1 ht Company is financially qualified to finance B.
9 the revised additional ownership interests in the facility; C.
The issuance of this auenduent will not be inimical to the health and safety of the public; and u.
Issuance of this amencmerit will result in no environmental impacts not previously considered.
2.
Accordingly, Construction Peruit No. CPPR-126 is amenced to reflect a change in the ownership of the facility as follows:
A.
Auend paragraph 3.F to read as follows:
"F.
The ownership interests of the applicants shall be as follows:
Udllas Power & Light Coupany 10-1/3 percent Texas Electric Service Compary JS-5/6 percent Texas Power & Light Company 33-2/3 percent Texas I:unicipal Power Agency 6-1/5 percent brazos Llectric Power Cooperative, Inc.
3-4/5 percent Tex-La Llectric Cooperative of Texas, Inc.
2-1/6 percent omcap sun 9204120111 820329
~ ~ ~ " " "
- PDR ADOCK 05000445 tA PDR nne ronu sis <io-soi nneu o24o OFFICIAL RECORD COPY usara
-us-,oo
l l
f s
. 3.
This amend,ent is effective as of the date of issuance.
FOR Tile NtCLEAR REGULATORY COTtISSIO!1 Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance:
MAR 2 91982 hGW y
fP df) au2 in't gim Dp N 30 @
's aW
, l ()
eI '
qw n
.........bM...O...l/
DL..:..ID.9..L............
DI 1B#1 omce p.s,/:jf,b,,.
DL:LB#1, DL:L DELD
(....................
g.....
suenaus > SBurweli/1,.
,MServig /
BJYoi od MRothsc ild R,L T
,,,3,q,q,,,,,,,,,D. 3....ssnh9..t;...
37f8/8f 3/@/52 3
g....1../.8\\... 3fp,,,./.82
...y.../.82 3/y 3
om, emo ronu sia oo-ao> nacu oua OFFiClAL WECORTCOPY usom mi-sz-m L.
+
O ir TEXAS UTILITIES GEflERATl?!G C0'PA'lY DALLAS PDIER & LIG!!T CO?PANY TEXA5 ELECTRIC SERVICE C0!PANY TEXA5 PDIlER 5 LIGilT C0tPI C TEXAS IUNICIPAL POWERWTCY BRAZDS ELECTRIC POUER COOPERATIE,174C.
4 TEX-LA ELECTRIC COOPERATIVE OF TEXAS, INC.
DOCKET No. 50-446 COMAtlCHE PEAK STEAti ELECTRIC STATION, UNIT 2 C0'ISTRUCTI0'l PERMIT Amendment No. 5 Construction Permit flo. CPPR-127 1.
The Nuclear Regulatory Comission (the Corriission) havinq found that:
A.
The application for amendment to Construction Pemit flo. CPPR-127 transnitted by a Texas Utilities Generatina Cmoany letter, dated
!! arch 10,1932, for the purpose of reflecting revised percentage ownership interests in the Cfrianche Peak Steart Electric Station, Units 1 and 2, between Texas Power & Light Company and the Tex-La Electric Cooperative of Texas, Inc. complies with the standards and requirenents of the Atomic Eneray Act of 1954, as amended, and the Co nission's rules and regulations set forth in 10 CFR Chapter I; 3
B.
The Texas Pouer 3 Light Company is financially qualified to finance the revised additional ownership interests in the facility; C.
The issuance of this amendment will not be inimical to the health and safety of the publiC; and 1
D.
Issuance of this amendment will result in no environmental impacts l
not previously considered.
2.
Accordingly, Construction Permit No. CPPR-127 is amended to reflect a change in the ownership of the facility, as follows:
A.
Amend paragranh 3.F to read as follows:
\\
"F.
The ownership interests of the applicants shall be as follows:
Dallas Power a Light Company 18-1/3 percent Texas Electric Service Cminany 35-5/6 percent
\\\\ s Texas Power & Light Conpany 33-2/3 percent A'
Texas Municipal Power Agency 6-1/5 percent N
Brazos Electric Power Cooperative, Inc.
3-4/5 percent x^
Tex-La Electric Coonerative of Texas. Inc.
2-1/6 percent
- \\
\\
omerp sunnae >
cmy anc FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY usa m i u-m em
-2_
3.
This amendment is effective as of the date of issuance.
FOR Tile !!UCLEAR REGULATORY C0'1'11SS10?!
Darrell G. Eisenhut, Director Division of Licensing Office of fluclear Reactor Requiation Date of Issuance:
MAR 2 91982 L
p.l k'
i M J"
~ a 2P 'r hvi t
c e
NY n
CFFICE)
.y
. 'D...L.:..L. B #.1...D.L M
OE..L..D t.t.VO...@......
D
...L....
_.DL :f.y..'D.....
1 I
... s...
l
..).7.p.pg../....c M.S er..j.g.......
.B.J
..l..o..o..c M.Rb.t.hsc.i.j.d....RL
.g.g.c. o....
4.)).C4i.f.g.n.h. u.t...
vi s
e suanAme>
r.
3 g
3 jp
...........g1...
om, nac FORM 318 UG M NACM ONO OFFIClAL NECOTD DOPY usom mi us.=
4