Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted
ML20211J403
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/27/1999
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20211J385 List:
References
NUDOCS 9909030136
Download: ML20211J403 (1)


Text

.. .

~*

DC Sourc;s - Oper: ting 3.8.4 i G SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each battery charger supplies 2 300 amps at 18 months 2130 V for 2 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SR 3.8.4.7 -

NOTES

1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7*
2. Verify requirement during MODES 3,4,5,6 or with core off-loaded.

Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjectad to a battery service test.

I (continued) I 1

1 l

  • On a one time basis, for battery BT1ED2, a performance discharge test may be performed in lieu of the battery service test required by Specification 3.8.4.7, twice within a 60 month intental. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.

9909030136 990827 PDR ADOCK 05000445 P PDR COMANCHE PEAK - UNITS 1 AND 2 3.8-26 Amndment No. #, H, 66