Site: | Comanche Peak |
Issue date: | 08/27/1999 |
From: | NRC (Affiliation Not Assigned) |
To: | |
Shared Package | |
ML20211J385 | List: |
References | |
NUDOCS 9909030136 | |
Download: ML20211J403 (1) | |
Similar Documents at Comanche Peak | |
---|---|
Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20211J4031999-08-27027 August 1999
[Table view]Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted 1999-08-27 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20211J4031999-08-27027 August 1999
[Table view]Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency 1999-08-27 |
Text
.. .
~*
DC Sourc;s - Oper: ting 3.8.4 i G SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each battery charger supplies 2 300 amps at 18 months 2130 V for 2 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
NOTES
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7*
- 2. Verify requirement during MODES 3,4,5,6 or with core off-loaded.
Verify battery capacity is adequate to supply, and 18 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjectad to a battery service test.
I (continued) I 1
1 l
- On a one time basis, for battery BT1ED2, a performance discharge test may be performed in lieu of the battery service test required by Specification 3.8.4.7, twice within a 60 month intental. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.
9909030136 990827 PDR ADOCK 05000445 P PDR COMANCHE PEAK - UNITS 1 AND 2 3.8-26 Amndment No. #, H, 66