|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl TXX-9916, Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs1999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 TXX-9819, Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld1998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs TXX-9807, LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power1998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 TXX-9424, LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor1994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency ML20073B6491994-09-19019 September 1994 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Change Into Licensee Units 1 & 2 TSs ML20072C3591994-08-12012 August 1994 LAR 94-014 to Licenses NPF-87 & NPF-89,revising Administrative Controls to Reflect Organizational Changes 1999-08-26
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212L1501999-09-30030 September 1999 Amends 72 & 72 to Licenses NPF-87 & NPF-89,respectively, Changing Thermal Rated Power in Paragraph 2.C.(1) of FOL NPF-89 & TS 1.1 to 3445 Megawatts Thermal for Cpses,Unit 2 ML20212G8061999-09-22022 September 1999 Amends 71 & 71 to Licenses NPF-87 & NPF-89,respectively, Revising TSs for Cpses,Unit 1 to Define F* SG Tube Plugging Criteria in TS 5.5.9 & Associated Reporting Requirements in TS 5.6.10 ML20212G8361999-09-22022 September 1999 Amends 70 & 70 to Licenses NPF-87 & NPF-89,respectively, Changing TS 3.4.13,TS 5.5.9 & TS 5.6.10 to Implement 1.0 Volt SG Tube Repair Criteria for Cpses,Unit 1 ML20216F9311999-09-21021 September 1999 Amends 69 & 69 to Licenses NPF-87 & NPF-89,respectively, Revising SR 3.8.1.13, AC Sources- Operating to Clarify That Each Edg,Automatic,Noncritical Trips Bypassed on Either loss-of-offsite or Safety Injection Actuation Signal ML20211K0071999-08-31031 August 1999 Amends 68 & 68 to Licenses NPF-87 & NPF-89,respectively, Changing Licenses to Accurately Reflect New Legal Name of Licensee, Txu Electric Co ML20211J9461999-08-30030 August 1999 Amends 67 & 67 to Licenses NPF-87 & NPF-89,respectively, Removing Several cycle-specific Parameter Limits from TS & Adding Parameter Limits to COLR ML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20210N1581999-08-0303 August 1999 Amends 66 & 66 to Licenses NPF-87 & NPF-89,respectively, Correcting Number of Editorial Errors in TSs That Occurred with Issuance of License 64 Re ITSs Conversion TXX-9916, Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs1999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20205F9631999-04-0101 April 1999 Corrected Amend 64 to Licenses NPF-87 & NPF-89,respectively. Three Pages from TS Bases Section Were Inadvertently Omitted TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 TXX-9819, Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld1998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld ML20248A1891998-05-22022 May 1998 Amends 60 & 46 to Licenses NPF-87 & NPF-89,respectively, Revising Section TS 3/4.8.1 to Reduce Min Fuel Oil Volume Requirements During Modes 5 & 6 for Operable EDG & Allow Continued Operable Status of DG During All Modes ML20216C3521998-05-0808 May 1998 Amends 59 & 45 to Licenses NPF-87 & NPF-89,respectively, Allowing One Time Basis Verification of Proper Operation of Unit 2 Load seal-in Contacts & DG Trip Bypass Contacts at Power & Crediting Performance of SR 4.8.1.1.2f.4 ML20217D3501998-04-20020 April 1998 Amends 58 & 44 to Licenses NPF-87 & NPF-89,respectively, Changing TS Re Load Shedding Feature of Motor Control Ctr & Auto Connected shut-down Loads Through Load Sequencer ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217H9171998-03-27027 March 1998 Amends 57 & 43 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves TXX-9807, LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power1998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212G7731997-10-30030 October 1997 Amends 55 & 41 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints Based on Analyses of Core Configuration for Unit 2 Cycle 4 ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS ML20210M6131997-08-18018 August 1997 Amends 54 & 40 to Licenses NPF-87 & NPF-89,respectively, Revising TS 3.7.1.5 to Increase AOT for One Inoperable MSIV While in Mode 1 TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20129D9291996-10-22022 October 1996 Amends 53 & 39 to Licenses NPF-87 & NPF-89,respectively, Changing Acceptance Values for Ameres & Voltage for 18 Month Surveillance Test of Battery Chargers ML20129E4761996-09-30030 September 1996 Amends 52 & 38 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & New N-16 Setpoint Values & Parameters for Unit 1 & Ref to TR RXE-95-001-P ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B7061996-06-25025 June 1996 Errata to Amends 51 & 37 to Licenses NPF-87 & NPF-89, Respectively,Correcting TS Pp 6-7 for Plant Units 1 & 2 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info ML20114E3681996-06-13013 June 1996 Amends 51 & 37 to Licenses NPF-87 & NPF-89,respectively, Revising TS to Reflect Approval for Use of New Containment Leakage Rate Testing Program ML20101L0711996-04-0101 April 1996 Amends 49 & 35 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & Revised Overtemperature Reactor Trip Setpoints ML20106H7401996-03-18018 March 1996 Amends 48 & 34 to Licenses NPF-87 & NPF-87,respectively, Allowing Both Doors of Containment Personnel Airlock to Be Open During Fuel Movement & Core Alterations,Providing One Airlock Door Capable of Being Closed & Water Level Maint ML20101D0541996-03-14014 March 1996 Amends 47 & 33 to Licenses NPF-87 & NPF-89,respectively, Revising TS to Allow Testing of RPS & Esfa Instrument Channels W/Channel Under Test in Bypass in Order to Reduce Vulnerability to Spurious Trips During Surveillance Testing 1999-09-30
[Table view] |
Text
.,
,.~.-_
Log
- TLX 97228 7
File # 916 (2.1)
O.
=
916 (2,2) r 10010 Ref. 4 1UELECTRIC.
C 1" T*7 October 24, 1997 Gnmp \\ke tonent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 SUBMITTAL OF LICENSE AMENDHENT REQUEST 97 003 REVISION TO UNIT 1 REACTOR TRIP SETPOINT FOR CYCLE 7 Gentlemen:
Pursuant to 10CFR50.90, TV Electric hereby requests an amendment to the CPSES Unit 1 Operating License (NPF 87) and CPSES Unit 2 Operating License 04PF 89) by incorporating the attached changes into the CPSES Units 1 and j
2 'bchnical Specifications. These changes apply to CPSES Unit 1.
Be ed on analyses of the core configuration and expected operatia for C;5ES Unit 1 Cycle 7, revised core safety limit curves and revised Overtemperature N 16 reactor trip setpoints are required.
, is the required affidavit. Attachment 2 provides a detailed description of the proposed changes, a safety analysis of the proposed changes and TU Electric's determination that the proposed changes do not involve a significant hazard consideration. Attachment 3 provides the affected Technical Specification pages tearked up to reflect the proposed changes.
TV Electric requests approval of this proposed license amendment by April 6,1998, with implementation of the Technical Specification changes to occur within 30 days after NRC approval.
In accordance with 10CFR50.91(b), TV Electric is providing the State of Texas with a copy of this proposed amendment.
\\
kD CI j 9710290210 971024 PDR ADOCK 05000445 N
b hhh h
P. O. Box 1002 Glen Rose Texas 76043
I TXX 97228.
Page 2 of 2 Should you have any questions, please contact Mr. J. D. Seawright at (254) 897 0140.
Sincerely,
- e. %
C. Lance Terry By:
M I-Roger 1. Walker Manager Regulatory Affairs JDS/grp Attachments:
1.
Affidavit 2.
Description and Assessment 3.
Affected Technical Specifications pages as revised by all approved license amendments c-Mr. E. W. Herschoff. Region IV Mr. T. J. Polich. NRR Hr. J. I. Tapia. Region IV Resident Inspectors. CPSES Mr. Arthur C. Tate Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin. Texas 7t04
. to TXX 97228 i
Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
4
)
-Texas Utilities Electric Company
)
Docket Nos.
50 445
)
50 446 (Comanche Peak Steam Electric
)
License Nos. NPF 87 i
Station. Units 1 & 2)
)
NPF 89 AFFIDAVIT Roger D. Walker being duly sworn, hereby deposes and says that he is Regulatory Affairs Manager of TU Electric, the licensee herein: that he is duly authorized to sign and file with the Nuclear Regulatory Commission this License Amendment Request 97 003: that-he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge. information and belief.
%h.
Roger D. Walker Regulatory Affairs Manager STATE OF TEXAS
)
)
COUNTY OF
)
Subscribed and sworn to before me, on this _2 N day of 6h 1997.
M ary Public DONALD R. WOOoLAN Nokwy Pudk:
State of To:tss s
+ * Commesion Expires 4446 J
i ATTACHMENT 2 to TXX 97228 DESCRIPTION AND ASSESSMENT l
4 4
+
i
. to TXX 97228 Page 1 of 7 DESCRIPTION AND ASSESSMENT I.
BACKGROUND Based on analyses of the core configuration for CPSES Unit 1 Cycle 7. revised core safety limit curves and Overtemperature N 16 reactor trip setpoints are required. The core safety limits are the loci of points of THERMAL POWER, Reactor Coolant System (RCS) pressure and average temperature below which either the calculated Departure from Nucleate Boiling Ratio (DNBR) is no less than the safety analysis limit value, or the average enthalpy at the vessel exit is less than the enthalpy of saturated liquid.
Important parameters used to establish these lines include the RCS flow rate, the design nuclear enthalpy rise hot channel factor (Fa), the cycle specific reference axial power shape, and the cycle specific core configuration. The core safety limits are calculated for pressures between the Pressurizer Pressure Low and Pressurizer Pressure High reactor trip setpoints and for powers up to the overpower reactor trip setpoint.
The Overtemperature N 16 reactor trip setpoint is calculated such that a reactor trip will be initiated before the core safety limits are exceeded.
The Overtemperature N 16 reactor trip function provides DNB protection from events which result in changes in power, pressure, temperature, or axial power shape. As for the core safety limits, the range over which the overtemperature reactor trip setpoint is calculated is bounded by ';he Pressurizer Pressure Low and Pressurizer Pressure High reactor tri) setpoints and the overpower reactor trip setpoint.
The operation of t1e Main Steam Safety Valves also limit the power / temperature range over which the overtemperature trip setpoint must provide DMS protection.
If an event results in an axial power shape which is more severe, from a DNB standpoint, than the reference axial power shape, the Overtemperature N-16 trip setpoint is automatically reduced in order to assure that the DNB protection afforded by the trip setpoint remains adequate.
The axial pt.wer shapes are
" recognized" by the plant instrumentation in terms of delta flux (al):
1.e.,
the difference between the currents generated by the top two excore power range neutron flux detector sutions and the currents generated by t1e bottom two detector sections. These instruments are spanned to detect axial flux imbalances in the range of i 75% al.
II.
DESCRIPTION OF TECHNICAL SPECIFICATIONS CHANGE REQUEST The core safety limits of Figure 2.1 la and the Overtemperature N 16 reactor trip function setpoints are revised to reflect the analyses performed to support operation with the Unit 1. Cycle 7 core configuration. This configuration consists of 19" fuel assemblies manufactured by Siemens Power Company and 1 fuel assembly manufactured by Westinghouse Electric Company.
The mixed core penalty is small due to only one Westinghouse fuel assembly.
The coefficients presented k the current Technical Specifications that define the overtemperature setpoint for Unit 1. Cycle 6 were revised to protect the Unit 1, Cycle 7 core safety limits.
In addition, because the Unit 1, Cycle 7 axial power distributions are calculated to be more skewed toward the top half 1
. to TXX 97228 Page 2 of 7 of the core than those calculated for Unit 1 Cycle 6, a revision to the f(al) trip reset function of the Overtemperature N 16 trip setpoint is required.
For this cycle, it was determined that no trip setpoint reduction was required for those bottom skewed axial power differences (61 < 0.0) over the span of the al instrumentation.
In addition, the core safety limits and the Overtemperature N 16 trip setpoint are revised to reflect the Unit 1 Cycle 7 core configuration by:
A.
Using the methodologies specified in Technical Specification 6.9.1.6b, calculations and analyses have been performed to identify the new reactor core safety limit curves for Unit 1.
Technical Specification Figure 2.1 la has been revised to replace the old curves with the new reactor core safety limit curves.
B.
Using the new reactor core safety limit curves from "A" above and the methodologies specified.in Technical Specification 6.9.1.6b, calculations and analyses have been performed to determine the appropriate values of the K, K, and K overtemperature setpoint and the f(AI)3 coefficients of the i
trip reset function as noted below:
In Technical Specification Table 2.2 1, Note 1 for the Overtemperature N 16 Trip Setpoint, the following Terms will be changed as noted:
K, revised from 0.0173 to 0.0148/'F K3 revised from 0.000890 to 0.00080/psig o
l qcq, range from 65% and +4.6% to 65% and +5.0%
=
Automatic Overtemperature N 16 setpoint reduction for each percent o
that the magnitude of qcq exceeds +5.0% (current value +4.6%) is decreased from 3.04% to 2.15%.
In Technical Specification Table 2.21, Note 2, for the Overtemperature N 16 Allowable Value, the maximum amount by which the Trip Setpoint is allowed to exceed the computed Trip Setpoint, is decreased from 3.64% to 1.72%.
SUMMARY
To summarize, TU Electric proposes changing the reactor core safety limits in CPSES Unit-1. Cycle 7. -As a result of the new reactor core safety limits, the Overtemperature N 16 trip setpoints have been recalculated. The Unit 1. Cycle 7 analyses-have been performed using methodologies which are NRC approved and satisfy the applicable safety analyses limits, These changes are consistent with the Westinghouse Improved Standard Technical Specifications (NUREG 1431.
Revision 1).
III. ANALYSIS The core safety limits were recalculated based on the Unit 1. Cycle 7 core configuration.
The changes relative to the limits in the current Technical Specification are based on axial power distributions that are predicted to be more top skewed than for the previous core configuration.
The NRC approved methodologies used by TV Electric to determine the reactor core safety limits l
o
~~
\\
' to TXX 97228 Page 3 of 7 are wholly consistent with and represent no change to the Technical Specification 2.1 BASES for Safety Limits.
~
The Reactor Trip System setpoint limits specified in Technical Specification 2.2. Table 2,21 are the nominal values at which the reactor trips are set for each functional trip.
The trip setpoints have been selected to ensure that the core and Reactor Coolant System (RCS) are prevented from exceeding their safety limits during normal operation and design basis anticipated operational occurrences.
The Overtemperature N 16 trip function initiates a reactor trip which protects the core from exceeding any safety limits.
The Overtemperature N 16 trip provides core protection to prevent DNB and vessel exit saturation for all combinations of pressure, power, coolant temperature, and axial power distribution, provided that: the transient is slow with respect to piping delays from the core to the N 16 detectors; the pressure is within the range between the Pressurizer High and Low pressure reactor trip setpoints: and the power is less than the Overpower N 16 trip 5
setpoint, The Overtemperature N 16 reactor trip setpoint is automatically varied with coolant temperature, pressurizer pressure, and axial power distribution.
With a typical axial power distribution, the Overtemperature N 16 reactor trip limit is always below the reactor core safety limits.
If the axial flux difference is greater' than that of the reference distribution, as indicated by the difference between top and bottom power range neutron flux detectors, the Overtemperature N 16 reactor tri) setpoint is automatically reduced according to the notations (Note 1) in Tec1nical Specification 2.2. Table 2.21.
This reduction provides protection consistent with the reactor core safety limits.
The f(a!) overtemperature trip reset function is designed to automatically reduce the 0vertemperature reactor trip setpoint if an axial power shape is detected which is more severe, with respect to DNB, than the reference shape used in the development of the core safety limits. The range for which no trip reset is required is extended from a al of +4.6% to +5.0t.
In addition, y
no trip reset is required for negative flux imbalances.
The FSAR Chapter 15 event most affected by the change in the Overtemperature trip setpoint is the rod withdrawal at power event presented in FSAR Section
.15.4.2.
Using NRC approved methodologies, this event was reanalyzed using the revised Overtemperature trip setpoint. All relevant event acceptance criteria were determined to be satisfied.
Therefore, this change does not result'in any reduction in any margin of safety. The other less limiting events in which the Overtemperature setpoint is used will be evaluated prior to Unit 1 Cycle 7 operation through the Reload Safety Evaluation performed in accordance with 10CFR50.59. This safety evaluation will be contingent upon the NRC approval of the Overtemperature setpoint change.
~.
. to TXX 97228 Page 4 of 7 All analyses of the core safety limits, the overtemperature N 16-trip setpoint, and the Rod Withdrawal at Power event were aerformed in accordance 1
with the NRC approved methodologies listed in the Tec1nical Specification 6.9.1.6b, Items 9, 10, 11, 12, 13 and 14.
IV SIGNIFICANT HAZARDS CONSIDERATIONS ANALYSIS TU Electric has evaluated whether or not a significant hazards consideration is involved with the proposed changes by focusing on the three standards set forth in 10CFR50.92(c) as discussed below:
1.
Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
A.
Revision to the Unit 1 Core Safety Limits Analyses of reactor core safety limits are required as part of reload calculations for each cycle.
TV Electric has performed the analyses of the Unit 1. Cycle 7 core configuration to determine the reactor core safety limits. The methodologies and safety analysis values result in new operating curves which, in general, permit )lant operation over a similar range of acceptable conditions. This clange means that if a transient were to occur with the plant operating at the limits of-the new curve, a different temperature and power level might be attained than if the plant were operating within the bounds of the old curves.
However, since the new curves were developed using NRC approved i
methodologies which are wholly consistent with and do not represent a change in the-Technical Specification BASES for' safety limits, all applicable postulated transients will continue to be properly mitigated.
As a result, there will be no significant increase in the consequences, as determined by accident analyses, of any accident previously evaluated.
B.
Revision to Unit 1 Overtemperature N 16 Reactor Trip Setpoints As a result of changes discussed, the Overtemperature reactor trip setpoint has been recalculated. These trip setpoints help ensure that the core safety limits are protected and that all applicable-liuits of the safety analysis are met.
Based on the calculations performed, no significant changes to the safety analysis values for Overtemperature reactor trip setpoint were required.
The f(AI) trip reset function was revised due to more top-skewed axial power distributions predicted for this cycle.
The analyses performed show that, using the TU Electric methodologies, all applicable limits of the safety analysis are met. This setpoint provides a trip 4
function which allows the mitigation of postulated accidents and has no impact on accident initiation. Therefore, the changes in safety analysis values do not involve an increase in the probability of an accident and, based on satisfying all applicable safety analysis limits, f
. to TXX 97228 Page 5 of 7 4
there is no significant increase in the consequences of any accident previously evaluated.
In addition, sufficient operating margin has been maintained in the overtemperature setpoint such that the risk of turbine runbacks or reactor trips due to upper plenum flow anomalies or other o)erational transients will be minimized, thereby, reducing potential cla11enges to the plant safety systems.
SUMMARY
l The changes in the amendment request applies NRC approved methodologies to enanges in safety analysis values, new core safety limits and new N-16 setpoint and )arameter values to assure that all applicable safety analysis limits lave been met. The potential for an operational transient to occur has not been affected and there has been no significant impact on the consequences of any accident previously evaluated.
2.
Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
The proposed changes involve the calculation of new reactor core safety limits and overtemperature reactor trip setpoint resets. As such, the changes play an important role in the analysis of )ostulated accidents but none of the changes effect plant hardware or tie operation of plant systems in a way that could initiate an accident.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
3.
Do the proposed changes involve a significant reduction in a margin of safety?
In reviewing and approving the methods used for safety analyses and calculations, the NRC has approved the safety analysis limits which establish the margin of safety to be maintained. Wnile the actual impact on safety is discussed in response to question 1, the impact on margin of safety is discussed below:
A.
Revision to the Unit 1 Reactor Core Safety Limits The NRC approved TU Electric reload analysis methods have been used to determine new reactor core safety limits. All applicable safety analysis limits have been met. The methods used are wholly consistent with Technical Specification BASES 2.1 which is the bases for the safety limits.
In particular, the curves assure that for tinit 1, Cycle 7. the calculated DNBR is no less -than the safety analysis limit and the average enthalpy at the vessel exit is less than the'enthalpy of saturated liquid. The acceptance criteria remains valid and continues to be satisfied; therefore, no change in a margin of safety occurs.
. to TXX 97228 Page 6 of 7 B.
Revision to Unit 1 Overtemperature N 16 Reactor Trip Setpoints Because the reactor core safety limits for CPSES Unit 1. Cycle 7 are recalculated, the Reactor Trip System instrumentation setpoint values for-the Overtemperature N 16 reactor trip setpoint which protect the reactor core safety limits must also be recalculated. The Overtemperature N 16 reactor trip setpoint helps prevent the core and Reactor Coolant System from exceeding their safety limits during normal operation and design basis anticipated o)erational occurrences.
The most relevant design basis analysis in Clapter 15 of the CPSES Final Safety Analysis Report (FSAR) which is affected by the Overtemperature reactor trip setpoint is the Uncontrolled Rod Cluster Control Assembly Bank Withdrawal at Power (FSAR Section 15.4.2),
This event has been analyzed with the new safety analysis value for the Overtemperature reactor trip setpoint to demonstrate compliance with event specific acceptance criteria.
Because all event acceptance criteria are satisfied, there is no degradation in a margin of safety.
The nominal Reactor Trip System instrumentation setpoints values for the Overtemperature N 16 reactor trip setpoint (Technical Specification Table 2,21) are determined based on a statistical combination of all of the uncertainties in the channels to arrive at a total uncertainty.
The total uncertainty plus additional margin is applied in a conservative direction to the safety analysis trip setpoint value ;o arrive at the nominal and allowable values presented in Technical Specification Table 2.2 1.
Meeting the requirements of Technical Specification Table 2.21 assures that the Overtemperature reactor trip setpoint assumed in the safety analyses remains valid, The CPSES Unit 1, Cycle 7 Overtemperature reactor trip setpoint is not significantly different from the previous cycle, and thus provides operational flexibility to withstand mild transients without initiating automatic protective actions. Although the value of the f(al) trip reset function set)oint is different, the Reactor Trip System instrumentation setpoint va'ues-for the Overtemperature N 16 reactor trip setpoint are consistent with the safety analysis assumptions which have been analytically demonstrated to be adequate to meet the applicable event acceptance criteria. Thus, there is no reduction in a margin of safety.
Using the NRC approved TU Electric methods, the reactor core safety limits are determined such that all applicable limits of the safety analyses are met.
Because the applicable event acceptance criteria continue to De met, there is no significant reduction in the margin of
- safety, Based on the above evaluations, TV Electric concludes that the activities associated with the above described changes present no significant hazards consideration under the-standards set forth in 10CFR50.92(c) and, accordingly, a finding by the NRC of no significant hazards consideration is justified.
' Attachment 2 to TXX 97228 Page 7 of 7 V,
ENVIRONMENTAL; EVALUATION
.TU Electric has determined that the proposed amendment would change requirements with respect to the instaliation or use of a facility component located within the restricted area, as defined in 10CFR20, or would change an inspection or surveillance requirement.
TU Electric has evaluated the proposed changes and has determined that the changes do not involve (1) a-1 significant hazards consideration, (ii) a significant change in ti ' types or significant increase in the amounts of any effluent that may be r,' eased offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed changes meet the eligibility criterion for categorical exclusion set forth in 10CFR51.22(c)(9).
Therefore, pursuant to 10CFR51.22(b), an environmental assessment of proposed-change is not required.
u