ML20211K007
| ML20211K007 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/31/1999 |
| From: | Gramm R NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20211K012 | List: |
| References | |
| NUDOCS 9909070085 | |
| Download: ML20211K007 (23) | |
Text
',
pm4 g
4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION l
p 2
WASHINGTON, D.C. 20555-0001 s...../
TEXAS UTILITIES ELECTRIC COMPANY COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 1 DOCKET NO. 50-445 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 68 License No. NPF-87 1.
The Nuclear Regulatory Commission (the Commission) has found that:
1 A.
The application for amendment by Texas Utilities Electric Company (TU Electnc, t
the licensee) dated May 14,1999, complies with the standards and requirements i
of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's
(
rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; j
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the y
Commission's regulations; j
l D.
The issuance of this license amendment will not be inimical to the common i
defense and security or to the health and safety of the public; and I
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the 4
Commission's regulations and all applicable requirements have been satisfied.
l i
I l
9909070085 990831 PDR ADOCK 05000445 P
) l 2.
Accordingly, the license is amended by changes to Facility Operating License No.
NPF-87 as indicated in the attachment to this license amendment.
i 3.
The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
j I
FOR THE NUCLEAR REGULATORY COMMISSION i
f
-A A1 +
l Robert A. Gramm, Chief, Section 1 Project Directorate IV & Decommissioning i
Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to Facility Operating l
License No. NPF-87 Date of Issuance: August 31, 1999
p ctro p
t UNITED STATES g
j NUCLEAR REGULATORY COMMISSION
%..... /g WASHINGTON, D.C. 20t%4001 o
TEXAS UTILITIES ELECTRIC COMPANY COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 2 i
DOCKET NO. 50-446 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 68 License No. NPF-89 i
l 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Texas Utilities Electric Company (TU Electric, the licensee) dated May 14,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C,
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and i
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the 1
Commission's regulations and all applicable requirements have been satisfied.
l
{
l l
{
l
t
, 2.
Accordingly, the license is amended by changes to Facility Operating License No.
NPF-89 as indicated in the attachment to this license amendment.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION k
h Robert A. Gramm, Chief, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to Facility Operating License No. NPF-89 Date of issuance:
August 31, 1999
ATTA'CHMENT TO LICENSE AMENDMENT NOS. 68 AND 68 FACILITY OPERATING LICENSE NOS. NPF-87 AND NPF-89 DOCKET NOS. 50-445 AND 50-446 Replace the following pages of the Facility Operating Licenses NPF-87 and NPF-89 with the attached revised pages. The revised pages are identified by amendment number and contain marginallines indicating the areas of change.
Remove Insert Pages 1 - 6 Pages 1 - 6 Title page of the Title page of the Environmental Environmental Protection Plan Protection Plan Title page of the Title page the Antitrust Conditions Antitrust Conditions
4 l
i Comanche Peak Unit No.1 a
a
,..,k UNITED STATES p
j NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D.C. 2006H001 a,,, **
n TXU ELECTRIC COMPANY. ET. AL.*
l DOCKET NO. 50-445 COMANCHE PEAK STEAM ELECTRIC STATION. UNIT NO.1 FACILITY OPERATING LICENSE License No. NPF-87 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for a license filed by TXU Electric Company (TXU Electric) acting l
for itself and as agent for Texas Municipal Power Agency (licensees), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Comanche Peak Steam Electric Station, Unit No.1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-126 and the application, as amended, the provisions of the Act, and i
the regulations of the Commission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D below);
D.
There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I, except as exempted from compliance in Section 2.D below; i
- The current owners of the Comanche Peak Steam Electric Station are: TXU Electric and l
Texas Municipal Power Agency. Transfer of ownership from Texas Municipal Power Agency to TXU Electric Company was previously authorized by Amendment No. 9 to Construction Permit l
CPPR-126 on August 25,1988 to take place in 10 installments as set forth in the Agreement attached to the application for Amendment dated March 4,1988. At the completion thereof,~'
Texas Municpal Power Agency will no longer retain any ownership interest.
Amendment No. 68
4 2-E.
TXU Electric is technically qualified to engage in th'e activities authorized by this l
operating license in accordance with the Commission's regulations set forth in
- 10 CFR Chapter I; F.
The licensees have satisfied the applicable provisions of 10 CFR 140, " Financial
- Protection Requirements and indemnity Agreements," of the Commission's regulations;
. G.
The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; H.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Facility Operating License No. NPF-87 subject to the conditions for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; and l.
The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, except that an exemption to the provisions of 70.24 is granted as described in paragraph 2.D below.
2.
Based on the foregoing findings regarding this facility, Facility Operating License No.
NPF-87 is hereby issued to the licensees, to read as follows:
A.
Tbs license applies to the Comanche Peak Steam Electric Station, Unit No.1, a pressurized-water nuclear reactor and associated equipment (the facility), owned by the licensees. The facility is located on Squaw Creek Reservoir in Somervell County, Texas about 5 miles north northwest of Glen Rose, Texas, and about 40 miles southwest of Fort Worth in north-central Texas and is described in the licensees' Final Safety Analysis Report, as supplemented and amended, and the licensees' Environmental Report, as supplemented and amended.
B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1)
Pursuant to Section 103 of the Act and 10 CFR Part 50," Domestic Licensing and Production and Utilization Facilities," TXU Electric to l
possess, use, and operate the facility at the designated location !n Somervell County, Texas in accordance with the procedures and limitations set forth in this license; (2)
Pursuant to Section 103 of the Act and 10 CFR Part 50," Domestic Licensing and Production and Utilization Facilities," Texas Municipal Power Agency to possess the facility at the designated location in Somervell County, Texas in accordance with the procedures and limitations set forth in this license; I
Amenchamt. No. 68
=,
'.=
1
, (3)
TXU Electric, pursuant to the Act and 10 CFR Part 70, to receive, l
possess and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4)
TXU Electric, pursuant to the Act and 10 CFR Parts 30,40 and 70, to l
receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
^
(5)
TXU Electric, pursuant to the Act and 10 CFR Parts 30,40 and 70, to l
receive, possess, and use in amounts as required, any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)
TXU Electric, pursuant to the Act and 10 CFR Parts 30,40 and 70, to l
possess, but not separate, such byproduct and special nuclear materials l
as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level TXU Electric is authorized to operate the facility at reactor core power l
levels not in excess of 3411 megawatts thermalin accordance with the conditions specified herein.
(2)
Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. TXU Electric shall operate the facility in j
accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Antitrust Conditions Applicants as defined in Appendix C shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.
A-bat Ib. 68
i.
. D.
The following exemptions are authorized by law and will not endanger life or property or the common defense and security. Certain special circumstances are present and these exemptions are otherwise in the public interest.
Therefore, these exemptions are hereby granted pursuant to 10 CFR 50.12.
(1)
The facility requires a technical exemption from the requirements of 10 CFR 50, Appendix J, Section Ill.D.2(b)(ii). The justification for this exemption is contained in Section 6.2.5 of Supplement 22 to the Safety Evaluation Report dated January 1990. The staff's environmental assessment was published on November 14,1989 (54 FR 47430).
Therefore, pursuant to 10 CFR 50.12(a)(1), and 10 CFR 50.12(a)(2)(ii) and (iii), the Comanche Peak Steam Electric Station, Unit 1 is hereby granted an exemption from the cited requirement and instead, is required to perform the overall air lock leak test at pressure P. prior to establishing j
containment integrity if air lock maintenance has been performed that could affect the air lock sealing capability.
(2)
The facility was previously granted an exemption from the criticality monitoring requirements of 10 CFR 70.24 (see Materials License No.
SNM-1912 dated December 1,1988 and Section 9.1.1 of Supplement 22
)
to the Safety Evaluation Report dated January 1990). The staff's l
environmental assessment was published on November 14,1989 (54 FR 47432). The Comanche Peak Steam Electric Station, Unit 1 is hereby exempted from the criticality monitoring provisions of 10 CFR 70.24 as applied to fuel assemblies held under this license.
(3)
The facility requires a temporary exemption from the schedular requirements of 10 CFR 50.33(k) and 10 CFR 50.75. The justification for this exemption is contained in Section 20.6 of Supplement 22 to the Safety Evaluation Report dated January 1990. The staff's environmental assessment was published on November 14,1989 (54 FR 47431).
Therefore, pursuant to 10 CFR 50.12(a)(1),50.12(a)(2)(iii) and 50.12(a)(2)(v), the Comanche Peak Steam Electric Station, Unit 1 is hereby granted a temporary exemption from the schedular requirements of 10 CFR 50.33(k) and 10 CFR 50.75 and is required to submit a decommissioning funding report for Comanche Peak Steam Electric l
Station, Unit 1 on or before July 26,1990.
E.
With the exception of 2.C(2) and 2.C(3), TXU Electric shall report any violations l
of the requirements contained in Section 2.C of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Initial notification shall be made in accordance with the provisions of 10 CFR 50.72 with written follow-up in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e),
hondamt No. 68 I
)
'A s
j s '
F.
In order to ensure that TXU Electric will exercise the authority as the surface l
}
landowner in a timely manner'and that the requirements of 10 CFR Part 100.3 (a) are satisfied, this license is subject to the additional conditions specified below: (Section 2.1.1, SER) l (1)
For that portion of the exclusion area which is within 2250 ft of any i
seismic Category I building or within 2800 ft of either reactor containment building, TXU Electric must prohibit the exploration and/or exercise of l
subsurface mineral rights, and if the subsurface mineral rights owners attempt to exercise their rights within this area, TXU Electric must l
i immediately institute immediately effective condemnation proceedings to obtain the mineral rights in this area.
(2)
For the unowned subsurface mineral rights within the exclusion area not covered in item (1), TXU Electric will prohibit the exploration and/or l
exercise of mineral rights until and unless the licensee and the owners of the mineral rights enter into an agreement which gives TXU Electric l
absolute authority to determine all activities --including times of arrival and locations of personnel and the authority to remove personnel and j
equipment --in event of emergency. If the mineral rights owners attempt to exercise their rights within this area without first entering into such an
]
agreement, TXU Electr!c must institute immediately effective l
i condemnation proceedings to obtain the mineral rights in this area.
(3)
TXU Electric shall promptly notify the NRC of any attempts by subsurface l
mineral rights owners to exercise mineral rights, including any legal proceeding initiated by mineral rights owners against TXU Electric.
G.
TXU Electric shall implement and maintain in effect all provisions of the approved l
fire protection program as described in the Final Safety Analysis Report through Amendment 78 and as approved in the SER (NUREG-0797) and its supplements through SSER 24, subject to the following provision:
TXU Electric may make changes to the approved fire protection program l
without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
H.
TXU Electric shall fully implement and maintain in effect all provisions of the l
physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21,'are entitled:" Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through November 28,1988;" Comanche Peak Steam Elactric Station Security Training and Qualification Plan" with revisions submitted inrough November 28,1988; and " Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through January 9,1989.
A=na-nt No. 68
s.
r e
6-1.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall reauire in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
J.
Amendment No. 9 to Construction Permit CPPR-126, issued August 25,1988, authorized the transfer of 6.2% ownership interest in the facility from Texas Municipal Power Agency to TXU Electric, such transfer to take place in 10 l
installments as set forth in the Agreement attached to the application for amendment dated March 4,1988. At the completion of such transfer of interest, Texas Municipal Power Agency shall no longer be a licensee under this license and all references to " licensees" shall exclude Texas Municipal Power Agency.
K.
This license is effective as of the date of issuance and shall expire at Midnight on February 8,2030.
FOR THE NUCLEAR REGULATORY COMMISSION original signed by:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments / Appendices:
- 1. Appendix A - Technical Specifications (NUREG-1399)
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Antitrust Conditions Date of issuance:
April 17,1990 i
i Anenanmt Ib. N I
s.
1 s
4 APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-87 1
TXU ELECTRIC COMPANY l
COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 DOCKET NO. 50-445 l
ENVIRONMENTAL PROTECTION PLAN (NON RADIOLOGICAL) i Asenanmt No. 68
i.
1 APPENDIX C 1
TO 1
l FACILITY OPERATING LICENSE NO. NPF-87 COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 TXU ELECTRIC COMPANY l
DOCKET NO. 50-445 ANTITRUST CONDITIONS
- LICENSE CONDITIONS FOR COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO.1
- These are the Conformed Settlement License Conditions filed in December 1980 which were approved May 6,1982 by the administrative law judge presiding over the consolidated antitrust proceedings for Comanche Peak Steam Electric Station. Although the text is identical, the sections have been renumbered for convenience.
{
i Amerrheet No. 68
)
c-Comanche Peak Unit No. 2
,m,m---c.a. - - +
n s.
gMt:
k
.g UNITED STATES j
NUCLEAR REGULATORY COMMISSION t
WA8HINGTON, D.C. 2066H001 TXU ELECTRIC COMPANY. ET. AL.*
l DOCKET NO. 50-446 COMANCHE PEAK STEAM ELECTRIC STATION. UNIT NO. 2 FACILITY OPERATING LICENSE License No. NPF-89 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for a license filed by TXU Electric Company (TXU Electric) acting l
for itself and as agent for Texas Municipal Power Agency (licensees), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Comanche Peak Steam Electric Station, Unit No. 2 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR 127 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D below);
D.
The,e is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I, except as exempted from compliance in Section 2.D. below; E.
TXU Electric is technically qualified to engage in the activities authcrized by this l
operating license in accordance with the Commission's regulations set forth in 10 CFR Chapter I;
- The current owners of the Comanche Peak Steam Electric Station are: TXU Electric Company l
and Texas Municipal Power Agency. Transfer of ownership from Texas Municipal Power Agency to TXU Electric Company was previously authorized by Amendment No. 8 to l
Construction Permit CPPR-127 on August 25,1988 to take place in 10 installments as set forth in the Agreement attached to the application for Amendment dated March 4,1988. At the completion thereof, Texas Municipal Power Agency will no longer retain any ownership interest.
Anordnerat No. 68
f i.
f -
F.
The licensees have satisfied the applicable provisions of 10 CFR 140, " Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G.
The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public;
(
H.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available j
alternatives, the issuance of Facility Operating License No. NPF-89 subject to j
the conditions for protection of the environment set forth herein, is in accordance I
with 10 CFR Part 51 of the Commission's regulations and all applicable j
requirements have been satisfied; and i
1.
The receipt, possession, and use of source, byproduct, and special nuclear j
material as authorized by this license will be in accordance with the l
Commission's regulations in 10 CFR Parts 30,40, and 70, except that an f
exemption to the provisions of 70.24 is granted as described in paragraph 2.D j
below.
J 2.
Pursuant to' approval by the Nuclear Regulatory Commission at a meeting on April 6, 1993, the License for Fuel Loading and Low Power Testing, License No. NPF-88, issued on February 2,1993, is superseded by Facility Operating License No. NPF-89 hereby
- Issued to the licensees, to read as follows:
A.
This license applies to the Comanche Peak Steam Electric Station, Unit No. 2, a pressurized-water nuclear reactor and associated equipment (the facility), owned by the licensees. The facility is located on Squaw Creek Reservoir in Somervell County, Texas about 5 miles north-northwest of Glen Rose, Texas, and about 40 miles southwest of Fort Worth in north-central Texas and is described in the licensee's Final Safety Analysis Report, as supplemented and amended, and the licensee's Environmental Report, as supplemented and amended.
B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1)
Pursuant to Section 103 of the Act and 10 CFR Part 50," Domestic Licensing of Production and Utilization Facilities," TXU Electric to l
possess, use, and operate the facility at the designated location in Somentell County, Texas in accordance with the procedures and limitations set forth in this license; (2)-
Pursuant to Section 103 of the Act and 10 CFR Part 50," Domestic Licensing of Production and Utilization Facilities," Texas Municipal Power l
Agency to possess the facility at the designated location in Somervell County, Texas in accordance with the procedures and limitations set forth in this license; 1
Wt No. 68 i
,m e
3-(3)
TXU Electric, pursuant to the Act and 10 CFR Part 70, to receive, l
possess and use at any time, special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, and described in the Final Safety Analysis Report, as supplemented and amended; (4)
.TXU Electric, pursuant to the Act and 10 CFR Parts 30,40 and 70, to l
' receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)
TXU Electric, pursuant to the Act and 10 CFR Parts 30,40 and 70, to l
receive, possess, and use in amounts as required, any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)
TXU Electric, pursuant to the Act and 10 CFR Parts 30,40 and 70, to l
possess, but not separate, such byproduct and soecla! nuclear materials as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to i
all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level TXU Electric is autilorized to operate the facility at reactor core power l
levels not in excess of 3411 megawatts thermalin accordance with the conditions specified herein.
(2)
Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. TXU Electric shall operate the facility in l
accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Antitrust Conditions Applicants as defined in Appendix C shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.
A=- wntIb.68
i.
4 4
D.
The following exemptions are authorized by law and will not endanger life or property or the common defense and security. Certain special circumstances are present and these exemptions are otherwise in the public interest.
Therefore, these exemptions are hereby granted:
(1)
The facility requires a technical exemption from the requirements of 10 CFR 50, Appendix J, Section Ill.D.2(b)(ii). The justification for this exemption is contained in Section 6.2.5.1 of Supplement 26 to the Safety Evaluation Report dated February 1993. The staff's environmental assessment was published on January 19,1993 (58 FR 5036).
Therefore, pursuant to 10 CFR 50.12(a)(1),10 CFR 50.12(a)(2)(ii) and j
(iii), the Comanche Peak Steam Electric Station, Unit 2 is hereby granted j
an exemption from the cited requirement and instead, is required to 1
perform the overall air lock leak test at pressure P, prior to establishing containment integrity if air lock maintenance has been performed that could affect the air lock sealing capability.
(2)
The facility was previously granted exemption from the criticality monitoring requirements of 10 CFR 70.24 (see Materials License No.
SNM-1986 dated April 24,1989 and Section 9.1.1 of SSER 26 dated j
February 1993.) The staff's environmental assessment was published on
{
January 19,1993 (58 FR 5035). The Comanche Peak Steam Electric Station, Unit 2 is hereby exempted from the criticality monitoring provisions of 10 CFR 70.24 as applied to fuel assemblies held under this license.
E.
With the exception of 2.C(2) and 2.C(3), TXU Electric shall report any violations l
l of the requirements contained in Section 2.C of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Initial notification shall be made in accordance with the provisions of 10 CFR 50.72 with written followup in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).
F.
In order to ensure that TXU Electric will exercise the authority as the surface l
landowner in a timely manner and that the requirements of 10 CFR 100.3 (a) are satisfied, this license is subject to the additional conditions specified below:
(Section 2.1, SER)
(1)
For that portion of the exclusion area which is within 2250 ft of any seismic Category I building or within 2800 ft of either reactor containment building, TXU Electric must prohibit the exploration and/or exercise of l
subsurface mineral rights, and if the subsurface mineral rights owners attempt to exercise their rights within this area, TXU Electric must l
Immediately institute immediately effective condemnation proceedings to obtain the mineral rights in this area.
Ammbnt No. 68
Eg
,7 i.
. (23 For the unowned subsurface mineral rights within the exclusion area not covered in item (1), TXU Electric will prohibit the exploration and/or l
j exercise of mineral rights until and unless the licensee and the owners of 1
the mineral rights enter into an agreement which gives TXU Electric l
absolute authority to determine all activities -including times of arrival and locations of personnel and the authority to remove personnel and
{
equipment --in event of emergency. If the mineral rights owners attempt to exercise their rights within this area without first entering into such an agreement, TXU Electric must immediately institute immediately effective l
condemnation proceedings to obtain the mineral rights in this area.
(3)
TXU Electric shall promptly notify the NRC of any attempts by subsurface l.
mineral rights owners to exercise mineral rights, including any legal l
proceeding initiated by mineral rights owners against TXU Electric.
l
]
1 G.
TXU Electric shall implement and maintain in effect all provisions of the approved l
fire protection program as described in the Final Safety Analysis Report through Amendment 87 and as approved in the SER (NUREG-0797) and its supplements i
through SSER 27, subject to the following provision:
)
TXU Electric may make changes to the approved fire protection program l
without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the i
event of a fire.
H.
TXU Electric shall fully implement and maintain in effect all provisions of the l
l physical security, guard training anc qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: " Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through January 14,1993;" Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through June 10,1991; and " Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through December 1988.
l.
. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
A-ne==* no. 68
i.
, J.
Amendment No. 8 to Construction Permit CPPR-127, issued August 25,1988, authorized the transfer of 6.2% ownership interest in the facility from Texas Municipal Power Agency to TXU Electric, such transfer to take place in 10 l
Installments as set forth in the Agreement attached to the application for amendment dated March 4,1988. At the completion of such transfer of interest, Texas Municipal Power Agency shall no longer be a licensee under this license and all references to " licensees" shall exclude Texas Municipal Power Agency.
K.
This license is effective as of the date of issuance and shall expire at Midnight on February 2,2033.
FOR THE NUCLEAR REGULATORY COMMISSION original signed by:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments / Appendices:
- 1. Appendix A - Technical Specifications (NUREG-1468)
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Antitrust Conditions Date of issuance:
April 6,1993 Amerxhent It). 68
l I
APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-89 TXU ELECTRIC COMPANY l
COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 i
DOCKET NOS. 50-445 AND 50-446 ENVIRONMENTAL PROTECTION PLAN (NON RADIOLOGICAL)
]
APRIL 6,1993 i
1
(
Anerdnet No. 68
r APPENDIX C TO FACILITY OPERATING LICENSE NO. NPF-89 COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 TXU ELECTRIC COMPANY l
DOCKET NO. 50-446 ANTITRUST CONDITIONS
- LICENSE CONDITIONS FOR COMANCHE PEAK STEAM ELECTRIC STATION, UNIT NO. 2
- These are the Conformed Settlement License Conditions filed in December 1980 which were approved May 6,1982 by the administrative law judge presiding over the consolidated antitrust proceedings for Comanche Peak Steam Electric Station. Although the text is identical, the sections have been renumbered for convenience.
Ammxknent No. 68
,,,,....