Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
__.- _ - -- _. _ _ _ - -. -__ _ - - - _ _ - - _ _ - -
V:
15 m: . .,
E#
ATTACHMENT /
1 ST.HL AE J##
- t. PAGE / OF G I *
- j. .
q_ SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT t: MARCH 1989 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 f
.X djk/Ml Prepared by: /
Perf'ormanie Technician Date Reviewed by: ~
, M5/89 Performance Technician Gen. Supervisor Date Reviewed By: @
W Pfarft Sg ~neerir g Manager bate Reviewed By: L/[/o Plan't uperinterklent Date Approved By: Y 16 89
&lant Man)ger date
$$g42JggQ$$$$ e
//
8 i
dNi/
i i
ATTACHMENT /
ST HL AE- JOSG
,,_PAGE 2. OF G Monthly Summary STPEGS Unit 1 began the reporting period in a planned outage for Bottom Mounted Instrumentation inspection.
The unit returned to service 3/4/89 at 0440 and achieved 100%
reactor power on 3/5/89 at 0930 to continue normal operations.
The unit concluded the reporting period at 100% reactor power.
l
i l
.. t
. ATTACHMENT /
- ST-HL-AE- MG PAGE 3 0F G OPERATING DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE April 4, 1989 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 03/01-03/31 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAX. DEFEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net):1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE l
- 5. NUMBER OF HOURS REACTOR UAS CRITICAL....... 715.8 1128.6 3625.4 .
f
- 6. REACTOR RESERVE SHUTDOWN HOURS............. 0 0 0
- 7. HOURS GENERATOR ON LINE.................... 667.3 1065.8 3471.8
- 8. UNIT RESERVE SHUTDOWN H0URS................ 0 0 0
'9 . GROSS THERMAL ENERGY GENERATED (MWt)... 2502364.1 3870529.6 12685051
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)..... 850700 1,316,400 4308630
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)...... 786456 1189505 3980997
- 12. REACTOR SERVICE FACTOR..................... 96.2% 52.2% 69.0%
- 13. REACTOR AVAILABILITY FACTOR................ 96.2% 52.2% 69.0%
- 14. UNIT SERVICE FACT 0R....................... 89.7% 49.3% 66.0%
- 15. UNIT AVAILABILITY FACTOR................... 89.7% 49.3% 66.0%
- 16. UNIT CAPACITY FACTOR (Using MDC)........... 84.5% 44.0% 60.6%
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 84.5% 44.0% 60.6%
- 18. UNIT FORCED OUTAGE RATE.................... 0% 12.6% 11.7%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 55 day outage to begin August 4, 1989 for Refueling.
- 20. IF SHUT DOWN AT FND OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INI";I AL CRITICALITY 03/08/88 03/08/88 INITIAL ELECTRICITY 03/30/88 03/30/88 COMMERCIAL OPERATION 08/25/88 08/25/88 l
) I!i{lj il' i i\
li-
@4 N
<d3 }[ -
g4;]hC[ %o e e 9 v c ,> h y Cm )
g 8 6 i n ed e t!
9 8 t e ge h 1 7 cor at t t 7 et r t nn .
n - r u uuo mh 4 e 2 rnc ooi ot 8 K 7 ooe Mt rn 9 l 9 CiR d e a .f o 4 i . - t ecmt n m
- r 2 & ct l nonod 0 p P. 1 An uat eies 5 1 A A 5 e e d nt mt uu 3 s v eeoucno 3 8 u e htB reii 8 9 a r cn t pt v 9 1
.EEYE C P Si rssne 1 -
OMTBN aonnor - A NAA O mfIi Cp 5 3 NDDH 0 0 r EP 8 8 aT TE t KI EL n E E CN LE g E E OU PT ne A E E D M od / I I O po N 5 C mC o
C g
.n mi at m
g .rs t e A mci sd / aS x yo r E S N cc n N SC Sif o O t o i I l l a et T e
- aam.gcr C # d uuot aue U e onnt nt dh D st t h aauouet E nnr A tMMACORO R h eeo / e - - - - -
c cvp N M1 234 59 R r iE e E a L R W M O
P H D T N N 3 A O r M f o n ogt S T nc o N R di a i
W O ot e t
O P 4 a D htR n T E t u i U R eh n m H MS w a S o x D E T
I ) e )
N n s n U 2 n
i n i a e a o l c l s B p ni p a x oL x e E i E R ( t t& (
s c ee ig r n) rT rn o os u ti r) ir l r io snern eivEi t u 7 a R ai a ao .
Fe rtl l rH 6 c yTaap u( 7 t ngr rnx _
D nanort oE _
enit osi( _
mel ati t pt el anar 1 ninuurire e ouif gemeh p sqaeepd pt y S aEMRROAOO T e - - - - - - - -
RABCDEFGH 4
e 2 d t 1 e a 0 l D 9 d u 8 ed c e rh 4 oc
. 0 FS o -
N 9 : :
8 FS I
l!flljf!:
l -'
':)..
. C
J e . .
ATTACHMENT 1 ST-HL AE Jor/# z PAGE # 0f h.._-. _
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498
.T UNIT 1
.DATE April 4, 1989
! '- COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 1
. MONTH March DAY AVERAGE DAILY POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 1213 i-2 0 18 1218
'3 0 19 1217
'4 279 20 1214 5 1139 21 1212 6 1217 22 1213 7 1216 23 1227
'8 1210 24 1218 9 1217 25 1217 10 1217 26 1214 11- 1213 27 1217 12 1210 28 1216 13 1211 29 1208 14 1207 30 1210 15 1205 31 1202 16 1213 ~~
E.
I.
I
' ATTACHMENT /
ST HL AE 105~G' l PAGE 6 OF G l
PORVs and .3afety Valves Summary No PORVs or Safety Valves were challenged during this reporting period.
l l
- ,. .< l g.,< l
. s
-- 4
.j, ATTACHMENT %
'T-HL AE 3 0Sfo -
., 9GE- / OF 6
, l I
d l i-i SOUTH TEXAS PROJECT l.
I ELECTRIC GENERATING STATION ~
y I' UNIT'2 MONTHLY OPERATING REPORT HAFCH 1989 'l HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Prepared by: < 4 N Perfo"rmance Technician Date Reviewed by: .
4/5M Performance Technician Gen. Supervisor Date Reviewed By: .44 yh7 7 Pldnf Engineering Manager V bat'e j Reviewed By: ,- d/1/f7 P'lant Superis(tendent Date' Approved By: .
to 49
'Pla'nt Manhger '
iDate
ATTACHMENT 2. --'
ST-HL AE.JorG-PAGE 2.OF G Monthly Summary i
STPEGS Unit 2 began the reporting period in Mode 3 at normal ope.ating temperature and pressure.
On 3/12/89 at 0429 the unit entered Mode 2.
Initial criticality was achieved on 3/12/89 at 2050 and the unit began low-power physics testing.
A full-power operating license was issued to STPEGS Unit 2 by the Nuclear Regulatory Commission on 3/28/89 at 1425. The unit achieved Mode 1 at 1813 on 3/28/89.
The report period was concluded with low-power physics testing ongoing.
i l
l 1
' ATTACHMENT Z.
ST HL-AE.JoM PAGE J OF 62 OPERATING DATA REPORT DOCKET NO. 50-499 UNIT 2 DATE April 4, 1989._
COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 03/01-03/31 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net): Not Determined DESIGN ELECTRICAL RATING (MWe-Net):1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY): N/A 1
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL...... 411.2 411.2 411.2
- 6. REACTOR RESERVE SHUTDOWN HOURS......... ... 0 0 _0
- 7. HOURS GENERATOR ON LINE................... 0 0 0
- 8. UNIT RESERVE SHUTDOWN HOURS................___0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWt)...... 20520.2 20520.2 20520.2
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)..... 0 0 0 _
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)...... 0 0 __0
- 12. REACTOR SERVICE FACTOR..................... N/A N/A N/A
- 13. REACTOR AVAILABILITY FACTOR................ N/A N/A N/A
- 14. UNIT SERVICE FACT 0R........................ N/A N/A N/A
- 15. UNIT AVAILABILITY FACTOR................... N/A N/A N/A
- 16. UNIT CAPACITY FACTOR (Using MDC)........... N/A N/A N/A
- 17. UNIT CAPACITY FACTOR (Using Design MWe).... N/A N/A N/A
- 18. UNIT FORCED OUTAGE RATE.......... ......... N/A N/A N/A
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STALTUP: N/A
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED >
INITIAL CRITICALITY 03/10/89 3/12/89 INITIAL ELECTRICITY 04/08/89 COMMERCIAL OPERATION 06/30/89 i
9 8 t e J
1 7 c r t7 e r
, n - r u 4 e2 r" c A 9 K7 o e /
m 9 4
l i .
9 2
C R t
N 0 rp P. 1 n 52 AA5 e e 3 s v 3 m
8 u e 8 9 a r 9 1
.EEYE C P 1 -
OMTBN - A NAA O 5 3 NDDH 0 0 u T ET EP TE t 8 8 KI EL n E E CN m OU D
LE P T M
g n*
o /
A E
E I
E E
I O p N 4 C m o
m.
C g
. n mi at m ,
rs g A mci t * / aS x s
y N r E S
S cc n N S if o O t o i I l l a e t T e #
- aam . g c r C e d uuot a ue U s t A onnt nt dh D n" r /
h a a uou et E e
N e - - - - - -
c c M1 23 4 5 9 R r i e 3 E a L R W M O
P H D T N N 3 A O r M f o n S T og t n c o N R di a i
W O ot e A t a
O P ht R /
D N n T E t u i U R eh n m l MS w a I
S o x D E T )
I e )
N n s n U i n i n a e a o A l c l s / p ni p a x oL x e N E i E R ( t t & (
s c e e i g r rT rn o n) u t i r) os l r s ne rn i r i o ei vEi t u A a R ai a
/
a o N F e rt l l rH c yT a a p u( t ngr rnx D na nort oE e nit osi(
me1 at i t
- pt el a na r ninuuri re e A ouif ge meh p / s qa e e pd pt y N aEMRROAOO T e - - - - - - - -
2 RABCDEFGH e A d t / e a N l D d u ed c e rh oc A FS o /
N N : :
FS l 1 fl' l l ll
i; ..
..s ,,
pJ, ATTACHMENT 2-
~
ST-HL-AE- JO SG' PAGP 70F 6 AVERAGE DAILY UNIT POWER LEVEL h'
l DOCKET NO. 499
-UNIT 2
, DATE April 4, 1989 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 L
MONTH March DAY AVERAGE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0- 17 0-2 0 18 0 3 0 19 0 4 0 20 -0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 l
10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 l
ATTACHMENT 7--
- ST HL AE .709G PAGE 6 OF G PORVs and Safety Valves Summary On March 23, 1989 during the performance of the Natural !
Circulation Verification Test there was a momentary lift of pressurizer PORV 655A.
Reactor power had been stabilized at approximately 3% as indicated by RCS loop delta-T when all four reactor coolant pumps (RCPs) were tripped for the test. Approximate ~1y two minutes after tripping the RCPa the motive force for pressurizer spray was lost.
With the backup heaters in the manual operation mode still providing heat, the pressurizer pressure started to rise. The PORV automatic controller attempted to compensate by increasing its output signal.
The controller signaled for the spray valves to go to the full open position and the valves went to full open, but without the RCPs there was no flow. With pressure still increasing, the controller eventually reached the FORV setpoint for this condition and the PORV opened.
This actuation had no impact on achieving natural circulation or the subsequent test results. A Test Deficiency Report was initiated to document the FORV lift event and a work request was performed which verified proper functioning of the FORV and the associated control circuits.
. e .:
The Light company ""* "' ', k liouston Lighting & Power- - -
April 14, 1989 ST-HL-AE-3056 File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50-498 & 50-499 Monthly Operating Reports for March, 1989 Pursuant to 10CFR50.71(a) and the South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for March, 1989.
If you should have any questions on this matter, please contact Mr. C. A..Ayala at (512) 972-8628, 7
$btab4Gf '
. A. McBurnett Manager, Operations Support Licensing MAM/CAA/n1 Attachments: 1) STPEGS Unit 1 Monthly Operating Report - March, 1989
- 2) STPEGS Unit 2 Monthly Operating Report - March, 1989 ll NL.NRC.R. MON.LT A Subsidiary of liouston Industries Incorporated
A llouston 1,ighting & Power Company ST-HL-AE-3056 File No.: G02 Page 2
- j. ..
- cc Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 F. G. Box 1700 Houston, TX 77001 George Dick, Proj ect Manager U. S. Nuclear Regulatory Commission INPO Washington, DC 20555' Records Center 1100 Circle 75 Parkway Jack E. Bess Atlanta, Ga. 30339-3064 Senior Resident Inspector-Unit I c/o U. S. Nuclear Regulatory Commission Dr. Joseph M. Hendrie P. O. Box 010 50 Be11 port Lane Bay City, TX 77414 Be11 port, NY 11713 J. I. Tapia Senior Resident Inspector-Unit 2 c/o U. S. Nuclear Regulatory Commission P..O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire.
Newman & Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)