ML20244D310

From kanterella
Jump to navigation Jump to search

Forwards SER & SALP Input for Util 831107 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Deficiencies in Response Noted.Recommends That Util Take Necessary Action to Correct Deficiencies
ML20244D310
Person / Time
Site: Pilgrim
Issue date: 04/18/1985
From: Beckham D
Office of Nuclear Reactor Regulation
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML20149B797 List:
References
FOIA-87-644 GL-83-28, TAC-52786, NUDOCS 8504290261
Download: ML20244D310 (2)


Text

- ___-

, . . ,, u.

d) hh

. DISTRIR7TICN

., ICB R/F AFh 161985 DHFS R/F (2) isocher Irrccker DShum f(MORANDtM FOR: Dennis Crutchfield. Assistant Director for Safety Assessmert Division of Licensing FROM: Don H. Reckham, Acting Deputy Director Division of Human Factors Safety

SUBJECT:

SAFETY EVALUAT!DN REPDRT FOR PILGRIM STAT!0ft, GEtlERIC LETTER 83-28, ! TEM 1.1 (POST-TRIP REVIEW) (TAC NO. 52786)

Ry letter dated Nnvenber 7, 1983, the licensee of Pilgrim Station responded to Generic letter 83-28 with regard to reouired actions based on generic implications nf Salem ATWS events. The enclosed SER and SALP were prepared by the Licensee Qualifications Branch based upon TFR input from its contractor, Science Applications International Corporation (SAI), af ter having reviewed tha applicable portions of the licensee's response to Cereric Letter 83-2R.

l We find that the licensea's response does not meet the guidelines developed for post-trip review in the following arees:

1. The criteria for deteminino the need for indepevant asseesment cf the event.

?. The mathnd and criteria for renoari.No the ovent with expected plant perfoma rca.

3. A systenatic safety assassrwnt progran to assets unscheduled reactor trips.

We recorryrd that the licensee take necessary action to enrrect the deficiencies noted above, which are discussed in creater detail in 5 action 111 ef the SER.

Acceptable responses to the 9 hove noted deficiencies are required be' ore wn can complete nur review of the licensco's Post-Trip Raview Pronran and Procedure for Pilgrin Station. We will review thasa resonnses whnn received i and rrport our findingt in a supplment to this SER.

l k l x' w ~ __ _. ./-

DHS6/MDC itR CWIrli,PIIERIM /,/pA ome < > .ICB ,

. .ISB.}

. . QIt D1E(,y j ,

e** =* >, , Dshum: L IrrccKer. IDxhcr. . Dlackh n:/OD i .

I -

oa">! .4/ ,)k . /E5 9/ .li ./85 4/'.7./89 4/ j . /85

.e o U ,

JE ~~6FFICI A L REdOR D COPY

~ . -

  • " 'M); * #

D. Crutchfield 2 APR 18 Ik i

l This review hat been conducted by D. Shum (x28906) and SAI, There are no known dissenting professional opinions on this matter.

Don /9 Ar. ting Deputy Director H Beckham, Divis on of Human factors Safety

Enclosures:

1. Safety Evaluation
2. SALP Evaluation ec: A Bournia J. Zwolinski G. Holahan