ML20133Q091

From kanterella
Jump to navigation Jump to search

Forwards Review of Licensee Responses to NRC Generic Ltr 83-28...for Point Beach Nuclear Plant Units 1 & 2.... Util Response Incomplete.Supporting Info for Preparation of Addl Info Required Also Encl
ML20133Q091
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/22/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20133Q093 List:
References
GL-83-28, TAC-52786, TAC-52787, NUDOCS 8511010379
Download: ML20133Q091 (2)


Text

l October 22, 1985

[$

Docket Nos. 50-266 C and 50-301 Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company j 231 West Michigan Street, Room 308 i Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

GENERIC LETTER 83-28, ITEM 1.2 " POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR THE P0 INT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2. For the Point Beach Nuclear Plant, Units 1 and 2, your response was found to be incomplete in four of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.

In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review. It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the TER. Your project manager will be workir) with you to arrange an acceptable time to conduct the necessary conference calls.

Enclosure 2 contains supporting information in preparation for the telecon.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, 6/

Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing

Enclosure:

1. TER on Salem ATWS Item 1.2
2. Supporting information for telecon 8511010379 851022 cc w/ enclosure: ADOCK 050 6 See next page fDR Distribution:

Docket File BGrimes NRC & L PDRs EJordan HThompson DLasher OELD FRosa ACRS 10 RWHouston PKreutzer Branch Files TColburn ORB #3:DL (pC ORB #3:DLyg OREHr3[J TColburn;ef EBdtcuer PKreutzer {

p/g/85 /o /p//85 jo /J /85 i~, - ~

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W. '

Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant ,

Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 l Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l

l S