MEMORANDUM FOR:
.F. Leech, Project Manacer, Prniact Directorate #1 Division of BWR Licensing FROM:
Gut C. Lainas, Assistant Director 'ne WD l
nivision of BWR Licensina j
l i
SUB.1ECT:
SACETY EVALUATION REDORT FOR GENERIC '_E'TER A3-?R, f
ITEMS 3.1.3 ANO 3.9.3 / POST MAINTENAME TESTING) FnR DILGRIM NUCLEAR POWED STATION, IP !T 1 1
Plant Name:
Pilgrim Nuclear Dower Statinn, Urit 1
'lltility:
Roston Edison Co.
Docket No.:
50-293 Licensing Status:
OR Resp. Directorate:
PO *1 Proiect Manager:
P. Leech Review Branch:
EICSB/DPA TAC Nos:
530?9 (3.1.3); 53868 (3.?.3)
Review Status:
Comolate The licensae was requirad bv Generic Letter R3-28 It-ns 3.1.3 and 3.2.3 to review their existino Technical Specifications for cost maintenance testing requirements that -av degrade rathar than anhance sa'etv.
The licensee has resoonded and our review of the resonnses as documer.ed 4 -he enclosed con-tractor's report (EG M EA-6918) #inds tha licensaa's restonses to G.L. 93-?8
{
ltens 3.1.3 and 3.?.? to be-accentable.
The enclnsad SE dmcumants our con-a currence with the enetractne's findinas and also finds t*e 'icensee's resonnses for these items to be acceptable.
Wa tharafore consider tFase items and j
TAC Numbers 530?9 and 53868 to be closed by this action. Enclosed is the SALP
{
inout for the review n' G.L. 83 9P, Items 3.1.3 and 3.'.?.
j
/
{! l-f' ius C.Nj. -inas, Assistant Director for PWR Division of BWR Licemina i
Enclosures:
j As stated cc: ' R. W. Houston T. Novak C. E. Rnssi