ML20244D774

From kanterella
Jump to navigation Jump to search

Forwards SALP Input & Sser Supporting Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing Per Review of Encl Eg&G Idaho,Inc Rept, Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3..
ML20244D774
Person / Time
Site: Pilgrim
Issue date: 04/01/1986
From: Lainas G
Office of Nuclear Reactor Regulation
To: Leech P
Office of Nuclear Reactor Regulation
Shared Package
ML20149B797 List:
References
FOIA-87-644 GL-83-28, TAC-53029, TAC-53868, NUDOCS 8604080135
Download: ML20244D774 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

6 /g/ M 4

.p

.4 pm arg f

fI Io,,

UNITED STAT ES e'

g NUCLEAR REGULATORY COMMISSION l'

{d i

APR 1 mo e

WASHING TON, D. C. 2{l$)s l

gv f l-

....+

MEMORANDUM FOR:

.F. Leech, Project Manacer, Prniact Directorate #1 Division of BWR Licensing FROM:

Gut C. Lainas, Assistant Director 'ne WD l

nivision of BWR Licensina j

l i

SUB.1ECT:

SACETY EVALUATION REDORT FOR GENERIC '_E'TER A3-?R, f

ITEMS 3.1.3 ANO 3.9.3 / POST MAINTENAME TESTING) FnR DILGRIM NUCLEAR POWED STATION, IP !T 1 1

Plant Name:

Pilgrim Nuclear Dower Statinn, Urit 1

'lltility:

Roston Edison Co.

Docket No.:

50-293 Licensing Status:

OR Resp. Directorate:

PO *1 Proiect Manager:

P. Leech Review Branch:

EICSB/DPA TAC Nos:

530?9 (3.1.3); 53868 (3.?.3)

Review Status:

Comolate The licensae was requirad bv Generic Letter R3-28 It-ns 3.1.3 and 3.2.3 to review their existino Technical Specifications for cost maintenance testing requirements that -av degrade rathar than anhance sa'etv.

The licensee has resoonded and our review of the resonnses as documer.ed 4 -he enclosed con-tractor's report (EG M EA-6918) #inds tha licensaa's restonses to G.L. 93-?8

{

ltens 3.1.3 and 3.?.? to be-accentable.

The enclnsad SE dmcumants our con-a currence with the enetractne's findinas and also finds t*e 'icensee's resonnses for these items to be acceptable.

Wa tharafore consider tFase items and j

TAC Numbers 530?9 and 53868 to be closed by this action. Enclosed is the SALP

{

inout for the review n' G.L. 83 9P, Items 3.1.3 and 3.'.?.

j

/

{! l-f' ius C.Nj. -inas, Assistant Director for PWR Division of BWR Licemina i

Enclosures:

j As stated cc: ' R. W. Houston T. Novak C. E. Rnssi

1. Zwnlinski M. Srinivasan 1

Contact:

)

r

n. Lasher, ETCS8/00A i

X?7200

.e Kopfl35jTk' nw