MONTHYEARML20081M3421983-11-0707 November 1983 Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Response Addresses Status of Current Conformance W/Positions in Generic Ltr Project stage: Other ML20244D3101985-04-18018 April 1985 Forwards SER & SALP Input for Util 831107 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Deficiencies in Response Noted.Recommends That Util Take Necessary Action to Correct Deficiencies Project stage: Approval BECO-85-148, Forwards Rev 1 to Procedure 1.3.37, Post-Trip Reviews, in Response to 850617 Request for Addl Info Re Generic Ltr 83-28,Item 1.1, Post-Trip Review1985-08-13013 August 1985 Forwards Rev 1 to Procedure 1.3.37, Post-Trip Reviews, in Response to 850617 Request for Addl Info Re Generic Ltr 83-28,Item 1.1, Post-Trip Review Project stage: Request ML20244D4521985-09-0303 September 1985 Forwards Revised SER Re Util 850813 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review,(Program Description & Procedure). Program & Procedure Acceptable.Salp Evaluation Also Encl Project stage: Other ML20135G1141985-09-10010 September 1985 Provides Addl Info Re Item 1.1 of Generic Ltr 83-28 Concerning post-trip Reviews,Per 850729 Request.Initial post-trip Investigation Is Responsibility of Duty Technical Advisor & Duty Shift Superintendent Project stage: Other ML20133Q0961985-10-22022 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2...for Point Beach Nuclear Plant, Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20133Q0911985-10-22022 October 1985 Forwards Review of Licensee Responses to NRC Generic Ltr 83-28...for Point Beach Nuclear Plant Units 1 & 2.... Util Response Incomplete.Supporting Info for Preparation of Addl Info Required Also Encl Project stage: Approval 1985-04-18
[Table View] |
Text
h h
y nauq'o UNITED STATES
, 4,'
=
g NUCLEAR REGULATORY COMMISSION f
g
. l WASHINGTON, D. C. 20555 N '.. /
SEP 031985 MEMORANDUM FOR:
Gus C. Lainas, Assistant Director for Operating Reactors Division of Licensing FROM:
Dennis L. Ziemann, Acting Deputy Director Division of Human Factors Safety
SUBJECT:
REVISED SAFETY EVALUATION REPORT FOR PILGRIM STATION, GENERIC LETTER 83-28, ITEM 1.1 (POST-TRIP REVIEW)
(TACN0.52786)
Reference:
Memorandum from D. Beckham to D. Crutchfield, " Safety Evaluation Report for Pilgrim Station, Generic Letter 83-28, Item 1.1 (Post-Trip Review)," dated April 18, 1985.
By the above referenced memorandum, we forwarded the LQB SER with regard to Pilgrim Station.
In our SER, we stated that the licensee's response did not meet the guidelines developed for post-trip review in the following areas:
1.
The criteria for determining the need for independent assessment of the event.
2.
The method and criteria for comparing the event with expected plant performance.
3.
A systematic safety assessment program to assess unscheduled reactor trips.
By letter dated August 13, 1985, the licensee provided responses for the above cited open issues. We have reviewed the licensee's responses and find that the above open issues have been resolved.
Thus, we conclude that the Post-Trip Review Program and Procedures for Pilgrim Station are acceptable.
Our revised SER and SALP evaluation are enclosed.
a on
t Gus C. Lairas This review has bean conducted by D. Shum (x24906).
There are no known dissenting professional opinions on this matter.
}bhm l'
' d r%%
A-DennisL.Ziemann,ActMgDeputyDirector Division of Human Factors Safety