o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555
/
Docket No.: 50-293 MEMORANDUM FOR:
Paul Leech, Senior Project Manager, BWR Project Directorate #1 Division of BWR Licensing FROM:
Gus C. Lainas, Assistant D4 rector 'or BWR Division of BWR Licensing
SUBJECT:
SAFETY EVALUATION REPORT FOR PILGRIM STATION, GENERIC LETTER 83-28, ITEM 1.2 (POST-TRIP REVIEW -
DATA AND INFORMATION CAPABILITY) DOCKET N0. 50-293 Plant Name:
Pilgrim Station Docket No.:
50-293 Utility:
Boston Edison Company Licensing Status:
OR Resp. Directorate: PD #1/ DBL Project Manager:
P. Leech Review Branch:
EICSB/DPA Review Status:
Complete By letter dated November 7,1983, the Boston Edison Company responded to Generic Letter 83-28 with regard to required actions based or generic implications of Salem ATWS events. The enclosed SER and SALP were prepared by the Electrical, Instru-mentation 'and Control Systems Branch of DPA based upon TER input from its con-tractor, Scierce Applications International Corporat9 (SAIC), after having re-viewed the applicable portions of the licensee's.resonese to Generic Letter 83-28 for Pilgrim 5tation. The TER was discussed with the licensee in telephone con-
]
versations between Mr. W. Lobo, the licensee's representative, and Mr. Raj Auluck
)
and Mr. Joel Kramer of the NRC on February 12 and 26,1986.
Based on our review, we conclude that the licensee's post-trip review data and information capabilities for Pilgrim Station are acceptable.
This review has been conducted by J. J. Kramer (X28408) and SAIC. There are
)
no known dissenting professional opinions on this matter.
?I s.
s s
f, pal s'. Lhi k Assista t Director Di' vision of BWR Licensing
Enclosures:
1.
Safety Evaluation 1
2.
SALP Evaluation See a t a,cjed,l _is t cc:
/
E//r
P. Leech cc:
R. Liner, SAIC D. Gallagher, SAIC C. E. Rossi J. Zwolinski E. Adensam T. Bournia
}