PNO-I-86-056, on 860724 Plant Shut Down Due to Open let- Down Sys Relief Valve.While Shut Down,Reactor Tripped on Low Steam Generator Level.Caused by Level Swings Due to Malfunctioning Valve Operators

From kanterella
Jump to navigation Jump to search
PNO-I-86-056:on 860724 Plant Shut Down Due to Open let- Down Sys Relief Valve.While Shut Down,Reactor Tripped on Low Steam Generator Level.Caused by Level Swings Due to Malfunctioning Valve Operators
ML20207J993
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/25/1986
From: Mccabe E, Shedlosky J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-86-056, PNO-I-86-56, NUDOCS 8607290312
Download: ML20207J993 (1)


DCS No: 50423860724 Date: July 25, 1986 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-I-86-56 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verifi n tion or evaluation, and is basically all that is known by the Region I staff ca this date.

Facility: Northeast Nuclear Energy Company Licensee Emergency Classification:

Millstone Unit 3 Notification of Unusual Event Docket No. 50-423 Alert Waterford, CT Site Area Emergency General Emergency X Not Applicable

Subject:

UNSCHEDULED SHUTDOWN GREATER THAN 48 HOURS The licensee shut down the plant on July 24, 1986 due to a stuck open let-down system relief valve. The valve was inaccessible due to being in the containment which is maintained under vacuum. Containment oxygen concentration was less than 19 percent and personnel access was prohibited for personnel safety reasons.

The plant shutdown was routine until 11:03 p.m., when a reactor trip occurred on low steam generator level. The cause was level swings induced while the operators were shifting from the operating to the startup feedwater regulating valves. Stable hot shutdown conditions were established. The plant is being taken to cold shutdown.

There was no release of radioactivity.

During the outage, the licensee intends to perform various cold shutdown work items in or' der to eliminate a mid-cycle outage previously planned for early next year. Planning for this outage is presently in progress. The outage duration is expected to exceed two weeks.

The State of Connecticut has been informed. Media interest has occurred.

CONTACT: J. Shediosky E. McCabe 203-442-5357 215-337-5231 DISTRIBUTION:

H. St. MNBB Phillips E/W Willste Mail: ADM:DMB

, Chairman Zech EDO NRR IE NMSS DOT:Trans only PA OIA RES Comm. Bernthal ELD AE00 Comm. Roberts Comm. Asselstine ACRS Air Rights INPO----

SECY SP NSAC----

CA PDR Regional Offices TMI Resident Section RI Resident Office j Licensee:

(Reactor Licensees)