ML20235F082

From kanterella
Jump to navigation Jump to search
Requests Info Re Operating Experience for HPCI Sys of Operating BWR Plants,Including Number of Times Necessary to Remove Sys from Svc & Total Number of Days HPCI Sys Has Been out-of-svc
ML20235F082
Person / Time
Site: Monticello, 05000000
Issue date: 08/09/1972
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Dienhart A
NORTHERN STATES POWER CO.
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709280403
Download: ML20235F082 (2)


Text

-

.t-

  • ~ ~ ~
  • ~ = - - * * -, * ~ *

, - ~ * *

-it-4,g

{p.263 7

p-at. - {

. -n.-;

i -l

'AUG 91972

-l*

l l'

Mr. A. V. Dienhart V. P. Engineering 414 'ficollct Ave.

'Minncopolis, Minnesota 55401 Door Mr. Dionhart This is to request operating experience information recording the IliEh Pressure Coolant Injection (IIPCI) systems of operating EG plants. We rtre particularly interested in the availability and reliability of the UICI syste:n at the Monticello nuclear unit following completion of toctins of the system durin$ the startup test programs and request that you provide the following information:

1 1.

The number of times that it has' been necessary to remove the HPCI l' -

oyaton from service.

2.

The total number of days that the HPCI system has been out of service.

During testing)of Ole IIPCI system, the number 3

system has, (a failed to function in accordance with design. For(b picose dcocribe the malfunction and the ciretristances involved. In those instances where incident or unusual occurrenco reports have previously been submitted to the AEC, the description may be incorporated by reference to these reports.

4.

During rme+or oneration the number of times the 11PCI system has received a signal to operato, (c) when the HPCI system was in service, and (b) when the HPCI system was removed from service and incapable of operation.

/

5 D:trinc reactor operation, the number of times the HPCI system received a cicanl to operate and failed to function in accordance with design. Picane provide a description of any malfunction and the circumstances under which they occurred.

7_ff B709280403 870921 PDR FOIA g( 7dj%dN MENZ87-111 PDR q

(k i

-$4

)

{';.

Northern States Power Company

-2

.1

b. 'i In those instances where incident or unusual occurrenco reports have previously been submitted to the AW, the description may

~

be ince.yend,ed by reference to these reports.

,j We' would appreciste your response to these questions within 15 days

~i, of receipt of.this letter. If this is.'not fossible, please let us know.

l

.'l Sincerely,

~j

  • h

$ G. '2n. M

~'

Peter A. Morris, Director Office'of Operations Evaluation.

Directorate of Regulatory Operations bcci A. Giambusso j

J. Hendrie

'l D. J. Skovholt R.-8. Boyd R..H. Engelken i 1 i s'

. i /

- 1 I

i I

i I

i 1

R0:0E RO:0E L,

L SRWilson:kmf PAMorris AGisabusso JHendrie 7/n/72 i

,.d.1

~, _, _ -

..~

.