ML20235B960

From kanterella
Jump to navigation Jump to search
Requests That Tech Spec Requirement for Isolation Valve Exercising Be Waived,Allowing Full Load Operation of Plant Over 721209-10 Weekend
ML20235B960
Person / Time
Site: Monticello, 05000000
Issue date: 12/07/1972
From: Mayer L
NORTHERN STATES POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709240300
Download: ML20235B960 (1)


Text

- _ _ _ _ _ _

j m,mi m,,

(

,,, cy,

.;w A

^'

-g MSRB

~

nonensan svar a s.p o w a n COMPANY

u. -. -....-=..

hcomber 7, 1972 50-263

=

'9 4

e W

\\

Mr A osambusso DEOO W d

O h

(4eO I

Attention: Mr J J aban Deputy DLrector for Resetor Projects Directorate of Licensing

~ United States Atomic Energy Commission hahington, D.C.

\\

Dear Mr Diambusso MueTICELLO NUCLEAR GMERATING PIANT Idcense Eo. IIR-22 Waiver of hchnical Specification Requirement 4 7.D.I.d Mrsuant to a conversation with Mr J J Shea, ABC-!E, this afternoco, the h

Northern States 7bwer 00sqpany system geneysting capability-to'leset' projected loads over the next seveml days has been greatly reduced due to genenting equissent failu m s.

Monticello Plant 'Elechnical Specification 4.7.D.1.d, IE422, requims a once per voek exercising of the main s+=amm ' power

(

e opeisted isolation valves. Isolation valve exercising requires a load re-ductica to &$ of full load. 2 bis load reduction, valve exercising, and load recovery is routinely scheduled over the weekend and results in reduced load for a period or about 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.

'Ibe four main steam isolation valves have been exercised weekly for over one and one-half years with no findicatiott of b1 Ming onany single test. In view of the abnomal system electrical capabilit;r conditions and the excellent surveillance test results, it is requested that the Te&nical Specification requirement for isolation valve exercising, k.7.D.1.d, be waived for this

, eekend tbus allowing full load operation of the Monticello Plant over the w

December 9-10, 1972 weekend.

4.

3, Yours Very truly, he

\\

i' L 0 Mayer, P..

Director of helear Sapport Services l

B709240300 B709211 J

PDR FOIA L

MENIB7-111 FDR j

vo

_