hcomber 7, 1972 50-263
=
'9 4
e W
\\
Mr A osambusso DEOO W d
O h
(4eO I
Attention: Mr J J aban Deputy DLrector for Resetor Projects Directorate of Licensing
~ United States Atomic Energy Commission hahington, D.C.
\\
Dear Mr Diambusso MueTICELLO NUCLEAR GMERATING PIANT Idcense Eo. IIR-22 Waiver of hchnical Specification Requirement 4 7.D.I.d Mrsuant to a conversation with Mr J J Shea, ABC-!E, this afternoco, the h
Northern States 7bwer 00sqpany system geneysting capability-to'leset' projected loads over the next seveml days has been greatly reduced due to genenting equissent failu m s.
Monticello Plant 'Elechnical Specification 4.7.D.1.d, IE422, requims a once per voek exercising of the main s+=amm ' power
(
e opeisted isolation valves. Isolation valve exercising requires a load re-ductica to &$ of full load. 2 bis load reduction, valve exercising, and load recovery is routinely scheduled over the weekend and results in reduced load for a period or about 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.
'Ibe four main steam isolation valves have been exercised weekly for over one and one-half years with no findicatiott of b1 Ming onany single test. In view of the abnomal system electrical capabilit;r conditions and the excellent surveillance test results, it is requested that the Te&nical Specification requirement for isolation valve exercising, k.7.D.1.d, be waived for this
, eekend tbus allowing full load operation of the Monticello Plant over the w
December 9-10, 1972 weekend.
4.
3, Yours Very truly, he
\\
i' L 0 Mayer, P..
Director of helear Sapport Services l