Forwards Insp Rept 50-358/73-01 on 730118-19.No Violations Noted.Confirmation of AEC Understanding of Listed quality- Related Activities Util Plans to Initiate Requested
ML20235B810
Person / Time
Site: 05000000, Zimmer
Issue date: 02/05/1973
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dickhoner W
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709240235
Download: ML20235B810 (2)


See also: IR 05000358/1973001

Text

. _ _ - - _

_

_ _ ~ -

,

-

El

'I

)

.

'

>

e-

g

i

%

UNITED STATES

,L.j

-

J. '

I

ATOMIC ENERGY COMMISSION

.

3

DIRECTORATE-OF REGULATORY OPERATIONS

.(

REGION lli

']

799 ROOSEVELT ROAD -

g w goug

?

GLEN ELLYN, ILLINOIS 6o137

(312) 858-2660

i

February 5, 1973

Cincinnati Cas and Electric Company

.

Docket No. 50-358

ATIN: Mr. W. B. Dickhonor, Vice President

Engineering and Electrical Production

139 East 4th Street

Cincinnati, Ohio

45201

Gentlemen:

't

'

This refers to the inspection conducted by Mr. Sutton of this office

on January 18 - 19, 1973 of quality assurance and site construction

activities at the Zimmer site. authorized by AEC' Construction Permit

No. CPPR-88 and to the discussion of our findings at the conclusion

of the inspection with you and Messrs. Flynn'and Pandorf of your staff.

Areas examined during this inspection are identified in the enclosed

. inspection report. . Within these areas, the inspection consisted of

selective examination of procedures and representative records,

interviews with site personnel, and observations by the inspector.

No violations of AEC requirer.ents were identified within the areas

examined during this inspection.

Ly way of this letter, va wish to confirn our understanding, based on

discussions during this inspection, with regard to certain quality related

activities you plan to initiate. These activities are as follows:

1.

Your WSS system supplier is to be informed of a need for prompt

receipt (at the storage site) of storage instructions necessary

to assure proper storage an. maintenance of received components

and equipment.

2.

Discussions are to be held with your AE relative to concrete

specification No. H-2174. Revision R3, Section b.2.3., Chapter 14

(Mass Concrete) to clarify the intent and application of the

specification during plant construction.

3.

The Zimmer Quality Assurance Manual, Criterion II, Section 2.6,

Control, is to be revised to require that a review of quality

.

8709240235 870921

~

.

ZB

i

P.DR

-

_

_ - - _ _ _ _ - _ - _ - _ _ _ _ - - - - - - - - _ - - - - - - - - - - - - - - - - - -

- - - - - - - - - -

_

_ _ _ _ _

_ _ _ _ _ _ _ _ _

_ _ _ _ _

.

'

-k

.

-

,

a-

Cincinnati Gas and

Electric Company

-2-

February 5, 1973

assurance programs and purchase specifications are

N

properly documented by the Zimmer Quality Assurance Section

before issuance of a purchase order.

We will examine your action relative to these matters during subsequent

inspections.

A copy of our report of this inspection is enclosed and, in accordance

with Section 2.790 of the AEC's " Rules of Practice", Part 2, Title

10. Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the AEC's Public Document Room.

If the inspection report contains information which you or your

contractors believe to be proprietary,2it is necessary that you

submit a written application to this office,'within 20 days of the

date of this letter, requesting that such information be withheld

from public. disclosure.

If such an application is submitted, it must

identify the basis for which information'is claimed to be proprietary

and should be prepared so that proprietary information identified is

contained in a separate part of the document, since the application..

excluding this separate part, will also be placed in the Public

Document Room.

If we do not receive'an application to withhold

information, or are not otherwise contacted within the specified time

period, the enclosed report will be placed in the Public Document

Room with a copy of this letter.

- Unless you wish to make ' application to withhold information, no reply

to this letter in uc.cenetry; hn:v.ar, should you have quuations

concerning enis inspection, we will be glad to discuss them with you.

Sincerely yours,

Boyce E. Grier

Regional Director

Enclosure

R0 Inspection Report No. 050-358/73-01

bec: RO Chief, RCB

RO:HQ (4)

Licensing (4)

DR Central Files

PDR

Local PDR

NSIC

DTIE

Regions I, II & V

_ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ __

_

._

-

1