ML20215K956
ML20215K956 | |
Person / Time | |
---|---|
Site: | 05000000, Shoreham |
Issue date: | 09/22/1986 |
From: | Wanderer P AFFILIATION NOT ASSIGNED |
To: | Atomic Safety and Licensing Board Panel |
Shared Package | |
ML20213F109 | List:
|
References | |
NUDOCS 8706250498 | |
Download: ML20215K956 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212K1241999-10-0101 October 1999
[Table view]Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2145, Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination1994-03-0808 March 1994 Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination 1999-10-01 Category:INCOMING CORRESPONDENCE MONTHYEARML20112E8911996-05-24024 May 1996
[Table view]FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2145, Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination1994-03-0808 March 1994 Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases SNRC-2157, Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site1994-02-28028 February 1994 Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site SNRC-2158, Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl1994-02-28028 February 1994 Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl SNRC-2156, Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept1994-02-25025 February 1994 Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept ML20067C9271994-02-22022 February 1994 Forwards Fitness for Duty Program Performance Data for Period of Jul-Dec 1993 SNRC-2144, Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790)1994-02-0404 February 1994 Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790) 1996-05-24 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20062C0581990-04-30030 April 1990
[Table view]Forwards Scientists & Engineers for Secure Energy,Inc Petition to Intervene & Request for Hearing,For Filing ML20062C0171990-04-20020 April 1990 Forwards Scientists & Engineers for Secure Energy,Inc Petition to Intervene & Request for Hearing,For Filing ML20062C0021990-04-18018 April 1990 Forwards Scientists & Engineers for Secure Energy,Inc Petition to Intervene & Request for Hearing,For Filing ML20006B9771990-01-0909 January 1990 Forwards Author Editorial Opinion Which Appeared in Long Island Edition of New York Times on 891126.Concerns Raised That Individuals Responsible for Making Key Decisions Re Safety & Evacuation Never Visited Eastern Long Island ML19325E9801989-11-0101 November 1989 Requests That Author Name Be Placed on Distribution List Re Schedule of Hearing in Alchemie Case.W/Certificate of Svc. Served on 891101 ML19325C2941989-08-0303 August 1989 Expresses Opposition to Dismantlement of Facility & Requests Public Hearing & Comment ML20247F8061989-07-0505 July 1989 FOIA Request for Documentation Re Incidents of Drug &/Or Alcohol Abuse During Past Five Yrs Amoung Employees or Contractors ML20247E6951989-06-27027 June 1989 Advises That Newly Formed Environ Conservation Organization Intends to Oppose Any Util Actions That Might Impact Negatively on Future Operability of Facility ML20247H3631989-06-26026 June 1989 Advises of Formation of Resources Conservation Organization. New Group Intends to Oppose Any Util Actions That Might Impact Negatively on Future Facility Operability.Ad Rossin Will Serve as Organization Coordinator ML20244B8581989-06-0505 June 1989 Expresses Concern Re Possibility of Transfer of Plant License from Lilco to State of Ny for Purposes of Decommissioning & Dismantling.Power from Plant Desparately Needed ML20247M5381989-05-25025 May 1989 Expresses Concern Re Proposed Dismantling of Plant.All Possible Actions to Force Opening of Plant Requested ML20245B3981989-05-0808 May 1989 Discusses Technical & Safety Concerns Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels at Plant ML20245B4081989-03-10010 March 1989 Requests Response to 881014 & 890119 & 23 Ltrs Re Technical & Safety Concerns at Plant ML20244B0011989-03-0808 March 1989 Lists Facts to Consider for Action to Fix or Close GE Reactors Once & for All ML20248J2211989-03-0707 March 1989 FOIA Request for Records Re Issuance of Full OL for Facility ML20244C8401989-03-0202 March 1989 Requests That Util Be Denied OL Due to Inadequacy of Plant Emergency Evacuation Plan.Related Correspondence ML20245B4091989-01-23023 January 1989 Refers to Re Corrosion Inhibitors in Closed Water Sys at Plant.Last Sentence on First Page of Ltr Should Be Changed to Read One Example Is Loss of Air Cooling to Shutdown Board Rooms at Sequoyah ML20245B4101989-01-19019 January 1989 Requests That Jg Partlow Pursue Completion of Engineering Assignment of ED Buggs at Plant Concerning Corrosion Inhibitors for Closed Water Sys.Draft Engineering Rept Recommending Corrosion Inhibitors for Closed Water Sys Encl ML20206D8951988-10-15015 October 1988 Expresses Opinion That Plants Should Remain Closed Until Converted to Alternative Fuel Source ML20245B4121988-10-14014 October 1988 Informs of Several Technical Concerns Expressed While at Util & Requests That Jg Partlow Pursue Resolution of Listed Concerns ML20206D9711988-09-0808 September 1988 Forwards Ltrs Exchanged Between NRC & Author in 1984 Re Problems in Commercial Nuclear Power Field & Change in Federal Regulations to Allow Senior Reactor Operator to Deviate from Tech Specs in Emergency ML20206D9451988-08-12012 August 1988 Annotated Ltr Expressing Appreciation for Reply to & Assurance in Response to Concerns Pertaining to Operation of Ref Plants ML20245D6611988-08-0808 August 1988 Submits Listed Comments in Response to Re Safety Practice to Schedule Nuclear Plant Operating & Maint Personnel for 16 H Shifts &/Or Excessive Overtime ML20206E0281988-07-0707 July 1988 Advises That Nuclear Industry Overlooked Most Important Lesson Resulting from TMI Accident,To Wit,That Station Operator/Mgt Official Stationed in Control Room Would Have Prevented Accident ML20150A7961988-06-30030 June 1988 Comments on Util 880616 Request to Suspend Antitrust License Condition.Economic Advantages for Util Owning Nuclear Power Plants Have Failed to Materialize ML20155B6651988-06-16016 June 1988 FOIA Request for plant-specific Documents Re Fire Protection Requirements,Insp repts,hardware-specific Deficiencies & NRC Communications W/Util ML20155G3581988-06-0808 June 1988 Expresses Displeasure Over Delay in Operation of Plant & Burden to Stockholders.Nrc Should License Plant Since No One Will Loose Out But Politicians ML20206E0361988-04-29029 April 1988 Opines That 10CFR50.54(x) & (Y) Superfluous & Dangerous.Nrc Should Instruct Operators Not to Depart from Tech Specs in Emergency.Author Resume Detailing Experience in Commercial Nuclear Power Field Encl ML20155A7431988-02-24024 February 1988 Discusses Safety Problems at Comm Ed Nuclear Power Plants Re Risking Fuel Meltdown by Turning Off Safety Sys as Directed by Util Policy in Emergency If Core Cooling Is Adequate. Vice President Instruction Encl ML20148G9001988-02-0101 February 1988 FOIA Request for Documents Re 10CFR50,App R Insps & Enforcements ML20206E0431988-01-29029 January 1988 Expresses Concern Re Two Hazardous Practices at Ref Plants, Including Risking Meltdown by Authorizing Operators to Turn Off Nuclear Plant Safety Sys During Emergency ML20149G1051987-12-18018 December 1987 Opposes NRC Reduction at TMI-2.Reducing Staff Prior to Completion of Core Removal Inappropriate & Misguided Move. Recent Shutdown of Oyster Creek for Incident Re Destruction of Data Decreases Util Standing W/Local Residents ML17303A6161987-09-30030 September 1987 Forwards Scenario Review for Rancho Seco Emergency Preparedness Exercise,871104. Incomplete Scenario Provided for Review.Plant data,in-plant Chemistry & Radiological Data & Controller Info to Support Fire Drill Missing Elements ML20235T7341987-09-0101 September 1987 Requests That EIS Documents Re Meltdown Prepared by Impartial Sources Be Made Available to Public.Observation of Plant Life Indicates Level of Contamination of General Environ Causing Widespread Severe Damage ML20238A0871987-08-21021 August 1987 FOIA Request for Complete Listing of All Available Documents Re NRC Review of Shoreham Mark II Containment During 680515-700220,including Memoranda,Internal & External Correspondence & Repts ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML20238E0261987-07-15015 July 1987 Responds to Recipient 870528 Response to Bg Strout Re Maine Yankee & Pilgrim.Author Distressed by NRC Answers & Requests Addl Response to Listed Questions ML20235L7061987-07-0808 July 1987 Opposes Util Application for Amends to Licenses,Allowing New Ownership & Financing Arrangement.Nshc Should Not Be Made W/O Public Hearings on Serious Financial Qualifications Questions ML20235K0421987-07-0202 July 1987 FOIA Request for List of All Licensed Reactor Operators & Senior Reactor Operators for Facilities ML20235F7451987-06-30030 June 1987 FOIA Request for Documents Re Safeteam Programs Being Used at Listed Facilities ML20215L5051987-06-23023 June 1987 Provides Brief Updated Rept on Status of Comm Ed Proposal Before State of Il Commerce Commission to Restructure Ownership & Other Financial Arrangements Re Facilities.Urges NRC Not to Make Finding Prior to Hearing ML20215L4871987-06-23023 June 1987 Urges NRC Not to Approve Comm Ed Request for Amend of Any OL Re Braidwood 1 & 2 & Not to Determine No Significant Hazard Exists W/O First Holding Adjudicatory Hearings on Serious Financial Qualifications Issues ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML20215J8911987-05-31031 May 1987 Comments on Operation of Facility.If Approved,Nrc Rationale Should Be Given Fullest Publicity & Severe Penalties Should Be Levied Against Those Interfering W/Orderly Plant Operation ML20236H1481987-05-30030 May 1987 Discusses Varga Reply to 870428 Mailgram Re Proof That LOCA Could Not Occur in Reactor Core at Plants.Evidence in Files of Repeated AEC & NRC Repression & Ignorance of Legitimate ACRS Concerns Cited.Congressional Hearings Requested ML20215K8391987-04-22022 April 1987 Opposes Licensing of Facilities for All the Same Old Reasons ML20214E2281987-04-16016 April 1987 FOIA Request for PRAs for Listed Plants Be Placed in PDR ML20215M0421987-04-13013 April 1987 Comments Opposing Shoreham Nuclear Plant Because Nuclear Energy Uneconomic,Plant Economic Disaster Due to Excessive Bldg Costs & Nuclear Waste Would Be Transported Through New York City Area ML20210C0071987-04-0909 April 1987 Requests That Public Be Provided W/Opportunity to Make Limited Appearance Statements Re Issues in Upcoming Reception Ctr Hearing.Proposed Reception Ctrs Entirely Inappropriate for Planned Plant Uses ML20205Q3911987-04-0303 April 1987 Supports Licensing of Facility Due to Need for More Energy. Cooperation in Any Emergency Is Required from Police & Fire Depts 1990-04-30 |
Text
.
t e .I
- {
20 Harvard Rd. .
Shoreham, N.Y.
Sept. 22, 1S86. ,
Nuclear Regulatory Commission i Atomic Safety and Licensing Board for -
the Shoreham Reactor W;' ngton, D.C. >
Gantlemen: 1 I am writing you in regard to your call for statements from the public about evacuation planning for the'Shoreham Reactor. Unfortunately,;
I will be away during the time you have set for public hearings, so I
.: sm writing you instead. I am a resident of Shoreham and live one mile from the reactor. .I am not an employee of LILCO nor do I own any stock. 1 1
in LILCO. .
l I have lived in Shoreham for ten years.and have followed the construction
, of the reactor closely during that time, since.my family and I live so cloce to it. Although I am not a reactor expert, I have concluded that i
the reactor can be safely operated because the scrutiny by the NRC and
' local governments has been so close. In particular,,I am prepared to
, er t your judgement with respect to the feasibility.of an evacuation
- pi from LILCO. I might add that I have never'seen any good reason .
why the area cannot be evacuated within the NRC specifications.
Thank you for your consideration of this statement. ,
i Sincerely ours,
/ Eat Gvvb ,
Peter Wanderer f
- j. ,
1
, c'l f
. LJ !
~
8706250498 8706$2
PDR CONHS NRCC "
CORRESPONDENCE PDRh, '
'T g l