|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212H9511999-06-20020 June 1999 Discusses Closeout of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, for Plant,Units 1,2 & 3.Closeout Ltr for Project Manager to Send to Licensee Encl DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205D2271999-03-24024 March 1999 Notification of 990324 Meeting with Tennessee Valley Authority in Rockville,Md to Discuss License Amend Request for Crediting Containment over-pressure ML20204D0241999-03-17017 March 1999 Notification of 990331 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal ML20199G8581999-01-19019 January 1999 Notification of 990204 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal of 981023.Background, Cost & Exposure of Current Program,Proposed Approach & Regulatory & Technical Basis for RI-IGSCC Also Discussed ML20154D5361998-10-0101 October 1998 Notification of Meeting W/Util on 981026 in Athens,Al to Allow Union of Concerned Scientists to Present Info on Issues Raised in 10CFR2.206 Petition Concerning Plants Unit 1 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl IA-98-330, Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 11998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 1 ML20197J0631998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Re Implementation of Maint Rule at Browns Ferry,Unit 1 ML20236X4251998-08-0404 August 1998 Forwards Input to SE Being Prepared for Browns Ferry Units 2 & 3 Proposed Power Uprate License Amend ML20236V8891998-07-31031 July 1998 Notifies of 980810 Meeting W/Tva in Rockville,Md to Discuss Unit 3 IPE & Unit 2 multi-unit PRA ML20236L0101998-06-30030 June 1998 Notification of 980709 Meeting W/Util in Rockville,Md to Discuss Plant,Unit 1 - Technical Working Level Discussions Re License Amend Request for Power Uprate ML20249B7691998-06-22022 June 1998 Informs That Attached Document Re Browns Ferry,Unit 1,should Be Placed in PDR ML20197J0571998-06-15015 June 1998 Partially Deleted Response to TVA Ltr Dtd 980403, Browns Ferry Nuclear Plant Unit 1 Revised Response to NRC Request Re Imlementation of Maint Rule,10CFR50.65 (URI 50-259/97-04-01) ML20197H9891998-06-15015 June 1998 Discusses Cancellation of 980616 Meeting on Plant ML20197H9781998-06-10010 June 1998 Suggests That It Would Be Best to Have Staff Position & Plan for Closure Before Having Public Meeting ML20197H9511998-06-10010 June 1998 Informs That Brian Agrees with Delaying Meeting on Plant Maint Rule ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248L1971998-06-0404 June 1998 Notification of 980616 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Unit 1 & Licensee Compliance W/ 10CFR50.65 Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants ML20197J0331998-06-0202 June 1998 Partially Deleted e-mail Informing of Scheduled Internal Meeting on 980605 Re Old Issue That Need Resolution Maint Rule Compliance at Browns Ferry,Unit 1 ML20216C8051998-05-0606 May 1998 Notification of 980508 Meeting W/Tva in Rockville,Md to Discuss General Mgt Re Plant ML20217K5861998-04-28028 April 1998 Notification of 980520 Meeting W/Tva in Rockville,Md to Have Technical Discussion W/Tva Staff Re Plant Power Uprate License Amend.Meeting Will Focus on Instrumentation Issues ML20216E8021998-04-13013 April 1998 Notification of 980414 Meeting W/Tva in Rockville,Md to Discuss Browns Ferry Nuclear Plant Improved TSs ML20217A5261998-03-20020 March 1998 Notification of 980326 & 27 Meeting W/Tva in Rockville,Md Re Technical Discussion Related to Plant Improved TSs ML20197B6201998-03-0404 March 1998 Revised Notification of 980305 Meeting W/Tva in Rockville, Maryland Re BFN Improved Sts.Meeting Cancelled ML20203L5321998-02-25025 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Improved Std TS ML20216G0501998-02-25025 February 1998 Notification of Cancellation of 980312 Meeting W/Tennessee Valley Authority in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203K7111998-02-25025 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Plant Inproved Sts.Meeting Cancelled ML20203L2211998-02-25025 February 1998 Notification of 980312 Meeting W/Util in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203E7581998-02-18018 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Issues Related to Browns Ferry Improved Std TSs ML20203B3921998-02-0303 February 1998 Notification of 980212 Meeting W/Tennessee Valley Authority in Rockville,Md Re Technical Discussions Related to Browns Ferry Improved TSs ML20198S1101998-01-14014 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Technical Discussion Re to Plant Improved TSs ML20199H4931998-01-14014 January 1998 Notification of Cancelled 980126 Meeting W/Util in Rockville,Md to Disuss Browns Ferry Improved TS ML20198M9931998-01-12012 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Implementation of 10CFR50.65 ML20197H9341998-01-0606 January 1998 Expresses Appreciation for Info Re Browns Ferry Unit 1 Maint Rule Issue.Either R Gibbs & Author or Both Will Be at 990126 Meeting ML20205M2341997-12-24024 December 1997 Forwards for Review Draft Ltr Ack Receipt of TVA Ltr & Electronic Transfer of $80,000 on 971219 in Payment for Civil Penalty Proposed by NRC in Ltr .Requests Ltr Be Forwarded to Regional Ofc ML20197J0241997-11-0606 November 1997 Refers to Re Implementation of Maint Rule for Browns Ferry Nuclear Plant Unit 1.Concludes That Scope of Unit 1 Maint Rule Program Was Inconsistent with Requirements of Rule.Memo Partially Deleted ML20217E2601997-09-30030 September 1997 Notification of 971008 Meeting W/Tva in Rockville,Md to Discuss Revs to Section 3.8 (Electrical) of Browns Ferry Improved TSs Submittal ML20217D8851997-09-30030 September 1997 Notification of 971009 Meeting W/Util in Rockville,Md to Discuss TVA Response to Staff RAI on Section 3.4 of Plant Improved TSs Submittal ML20210K1641997-08-15015 August 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Hydrodynamic & Structural Loads Evaluation for Planned Emergency Core Cooling Suction Strainer Mods ML20197H9151997-07-28028 July 1997 Informs That Region II Asked for NRR Assistance in Addressing Unresolved Item 50-259/97-04-01 Which Deals with Implementation of Maint Rule on Unit 1.Requests That Encl Draft Ltr Be Reviewed ML20197H9951997-07-25025 July 1997 Partially Deleted e-mail Requesting Response Re Browns Ferry Unit 1 Maint Rule,Within 30 Days ML20197H8851997-07-25025 July 1997 Informs That Author Plans to Send Encl Ltr to Tva,Discussing Implementation of Maint Rule on Browns Ferry Unit 1,re URI 50-259/97-04-01 ML20197J0121997-07-25025 July 1997 Partially Deleted e-mail Discussing 10CFR2.201 Which Provided Requirements for Responses to Novs.Agrees That 60 or 90 Days,Ok,As Long as Response Requested within Certain Time Frame & Not Leave Open Ended ML20197H7781997-07-25025 July 1997 Informs That Based on Input from QA & Maint Branch,Encl Ltr Which Ask TVA Which of Three Apparent Options It Intends to Pursue,Or to Propose Another Course of Action Consistent with Regulatory Requirements.Rev & Comments Requested ML20197H9011997-07-25025 July 1997 Informs That B Holland Should Concur on Browns Ferry,Unit 1 Maint Rule ML20205D9871997-07-16016 July 1997 Informs of Typographical Error in NOV EA 95-220 Which Ref Incorrect Docket & License Number.Correct License & Docket Numbers Listed ML20197H7231997-06-17017 June 1997 Discusses Region II TIA 97-015 Request to Technical Assistance with Issue of Limited Implementation of 10CFR50.65,at Plant,Unit 1.Results of Insp Are Documented in Insp Repts 50-259/97-04,260/97-04 & 296/97-04 ML20197H6501997-06-0404 June 1997 Requests Assistance in Resolving Issue of Extent of Maint Rule Implementation for Browns Ferry,Unit 1.Results of Insp Conducted on 970418,documented in Insp Rept 50-259/97-04,50-260/97-04 & 50-296/97-04 1999-06-20
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212H9511999-06-20020 June 1999 Discusses Closeout of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, for Plant,Units 1,2 & 3.Closeout Ltr for Project Manager to Send to Licensee Encl DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205D2271999-03-24024 March 1999 Notification of 990324 Meeting with Tennessee Valley Authority in Rockville,Md to Discuss License Amend Request for Crediting Containment over-pressure ML20204D0241999-03-17017 March 1999 Notification of 990331 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal ML20199G8581999-01-19019 January 1999 Notification of 990204 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal of 981023.Background, Cost & Exposure of Current Program,Proposed Approach & Regulatory & Technical Basis for RI-IGSCC Also Discussed ML20154D5361998-10-0101 October 1998 Notification of Meeting W/Util on 981026 in Athens,Al to Allow Union of Concerned Scientists to Present Info on Issues Raised in 10CFR2.206 Petition Concerning Plants Unit 1 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl IA-98-330, Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 11998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 1 ML20197J0631998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Re Implementation of Maint Rule at Browns Ferry,Unit 1 ML20236X4251998-08-0404 August 1998 Forwards Input to SE Being Prepared for Browns Ferry Units 2 & 3 Proposed Power Uprate License Amend ML20236V8891998-07-31031 July 1998 Notifies of 980810 Meeting W/Tva in Rockville,Md to Discuss Unit 3 IPE & Unit 2 multi-unit PRA ML20236L0101998-06-30030 June 1998 Notification of 980709 Meeting W/Util in Rockville,Md to Discuss Plant,Unit 1 - Technical Working Level Discussions Re License Amend Request for Power Uprate ML20249B7691998-06-22022 June 1998 Informs That Attached Document Re Browns Ferry,Unit 1,should Be Placed in PDR ML20197H9891998-06-15015 June 1998 Discusses Cancellation of 980616 Meeting on Plant ML20197J0571998-06-15015 June 1998 Partially Deleted Response to TVA Ltr Dtd 980403, Browns Ferry Nuclear Plant Unit 1 Revised Response to NRC Request Re Imlementation of Maint Rule,10CFR50.65 (URI 50-259/97-04-01) ML20197H9781998-06-10010 June 1998 Suggests That It Would Be Best to Have Staff Position & Plan for Closure Before Having Public Meeting ML20197H9511998-06-10010 June 1998 Informs That Brian Agrees with Delaying Meeting on Plant Maint Rule ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248L1971998-06-0404 June 1998 Notification of 980616 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Unit 1 & Licensee Compliance W/ 10CFR50.65 Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants ML20197J0331998-06-0202 June 1998 Partially Deleted e-mail Informing of Scheduled Internal Meeting on 980605 Re Old Issue That Need Resolution Maint Rule Compliance at Browns Ferry,Unit 1 ML20216C8051998-05-0606 May 1998 Notification of 980508 Meeting W/Tva in Rockville,Md to Discuss General Mgt Re Plant ML20217K5861998-04-28028 April 1998 Notification of 980520 Meeting W/Tva in Rockville,Md to Have Technical Discussion W/Tva Staff Re Plant Power Uprate License Amend.Meeting Will Focus on Instrumentation Issues ML20216E8021998-04-13013 April 1998 Notification of 980414 Meeting W/Tva in Rockville,Md to Discuss Browns Ferry Nuclear Plant Improved TSs ML20217A5261998-03-20020 March 1998 Notification of 980326 & 27 Meeting W/Tva in Rockville,Md Re Technical Discussion Related to Plant Improved TSs ML20197B6201998-03-0404 March 1998 Revised Notification of 980305 Meeting W/Tva in Rockville, Maryland Re BFN Improved Sts.Meeting Cancelled ML20216G0501998-02-25025 February 1998 Notification of Cancellation of 980312 Meeting W/Tennessee Valley Authority in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203L5321998-02-25025 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Improved Std TS ML20203L2211998-02-25025 February 1998 Notification of 980312 Meeting W/Util in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203K7111998-02-25025 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Plant Inproved Sts.Meeting Cancelled ML20203E7581998-02-18018 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Issues Related to Browns Ferry Improved Std TSs ML20203B3921998-02-0303 February 1998 Notification of 980212 Meeting W/Tennessee Valley Authority in Rockville,Md Re Technical Discussions Related to Browns Ferry Improved TSs ML20198S1101998-01-14014 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Technical Discussion Re to Plant Improved TSs ML20199H4931998-01-14014 January 1998 Notification of Cancelled 980126 Meeting W/Util in Rockville,Md to Disuss Browns Ferry Improved TS ML20198M9931998-01-12012 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Implementation of 10CFR50.65 ML20197H9341998-01-0606 January 1998 Expresses Appreciation for Info Re Browns Ferry Unit 1 Maint Rule Issue.Either R Gibbs & Author or Both Will Be at 990126 Meeting ML20205M2341997-12-24024 December 1997 Forwards for Review Draft Ltr Ack Receipt of TVA Ltr & Electronic Transfer of $80,000 on 971219 in Payment for Civil Penalty Proposed by NRC in Ltr .Requests Ltr Be Forwarded to Regional Ofc ML20197J0241997-11-0606 November 1997 Refers to Re Implementation of Maint Rule for Browns Ferry Nuclear Plant Unit 1.Concludes That Scope of Unit 1 Maint Rule Program Was Inconsistent with Requirements of Rule.Memo Partially Deleted ML20217E2601997-09-30030 September 1997 Notification of 971008 Meeting W/Tva in Rockville,Md to Discuss Revs to Section 3.8 (Electrical) of Browns Ferry Improved TSs Submittal ML20217D8851997-09-30030 September 1997 Notification of 971009 Meeting W/Util in Rockville,Md to Discuss TVA Response to Staff RAI on Section 3.4 of Plant Improved TSs Submittal ML20210K1641997-08-15015 August 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Hydrodynamic & Structural Loads Evaluation for Planned Emergency Core Cooling Suction Strainer Mods ML20197H9151997-07-28028 July 1997 Informs That Region II Asked for NRR Assistance in Addressing Unresolved Item 50-259/97-04-01 Which Deals with Implementation of Maint Rule on Unit 1.Requests That Encl Draft Ltr Be Reviewed ML20197J0121997-07-25025 July 1997 Partially Deleted e-mail Discussing 10CFR2.201 Which Provided Requirements for Responses to Novs.Agrees That 60 or 90 Days,Ok,As Long as Response Requested within Certain Time Frame & Not Leave Open Ended ML20197H9011997-07-25025 July 1997 Informs That B Holland Should Concur on Browns Ferry,Unit 1 Maint Rule ML20197H7781997-07-25025 July 1997 Informs That Based on Input from QA & Maint Branch,Encl Ltr Which Ask TVA Which of Three Apparent Options It Intends to Pursue,Or to Propose Another Course of Action Consistent with Regulatory Requirements.Rev & Comments Requested ML20197H8851997-07-25025 July 1997 Informs That Author Plans to Send Encl Ltr to Tva,Discussing Implementation of Maint Rule on Browns Ferry Unit 1,re URI 50-259/97-04-01 ML20197H9951997-07-25025 July 1997 Partially Deleted e-mail Requesting Response Re Browns Ferry Unit 1 Maint Rule,Within 30 Days ML20205D9871997-07-16016 July 1997 Informs of Typographical Error in NOV EA 95-220 Which Ref Incorrect Docket & License Number.Correct License & Docket Numbers Listed ML20197H7231997-06-17017 June 1997 Discusses Region II TIA 97-015 Request to Technical Assistance with Issue of Limited Implementation of 10CFR50.65,at Plant,Unit 1.Results of Insp Are Documented in Insp Repts 50-259/97-04,260/97-04 & 296/97-04 ML20197H6501997-06-0404 June 1997 Requests Assistance in Resolving Issue of Extent of Maint Rule Implementation for Browns Ferry,Unit 1.Results of Insp Conducted on 970418,documented in Insp Rept 50-259/97-04,50-260/97-04 & 50-296/97-04 1999-06-20
[Table view] |
Text
_ _ _ _ _ _ _ _ _ - - _ - __ _- _ - ._ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ ___
i ,
, ~ t, Dl4 o
l 6 e
. Sb. r
[*1 L
i Yc m /.. .Ucarc, /.ns:in:.rrt "Irc: tor (c.r T ir,ht Uater enctorc, Group 2, L
}
i, TV!i nEl'n".? "l?73 LPO'r " N.r.ny 1;':IT 2 7'?Ri:S OT:'ta!L:CC" (TAR-955) .
[ In accordr.nco vith yeer vor.uast of cy 21, 1974, the Contairrant e.p ten:
Lranch, Directorate of i.icensing has reviewed the nubject report. The
. repor t ha c enclicebility _to all I"7 c vith nrcsnure supntcssion. of the torun lir.htbulb type contal:rcuts. The c:uantitative fin <.'ints in the report are relovnat to the ';rorna Ferry plant.
i Th : report deceribec the results of a serico of instruncnted relief volve tests perfor: cd durix.c the startup of Brotms rcrry, Unit 1 in the period -
cf Ncn .1.or 8,1973 to January 11, 1974. Thic tect pror.rn. vns initinto1 aftrr ceae J,1-'c to tbn torus rine hende.r arrones eau had reruited f tue t.n a result of this d.= mane, and the l earlier.rclinf v 1vn e c ~t',
encs.asive vi!,raticca th:t wre observed c' urin ~ rclici valve netuationa, .
r trait, c'nr ' cr.d lino:n elo-4 ty _dira'lacanint trnundaccre (i 5"r?) Jr.- 1 strtrentetton t.20 in tal. led on the torus and 0"Jt rips header to nernure q
81ra m nr.C % flo.ctienn of r.w ntructure, t'efor.' the testn v: ro etnrt 0 vinor correctione to rN ctructpral nt:pport of the tnruc ?.c.d 1. con pa?:forned.
These correct.i :n vara u:.cated once *:. ore durin : the ter.tr.
11 e rcculta of th:>. te:.; .m:c,re:.: ara ca:.~ia.cd to the ctructurn:. rcen ar. ':
of tho torus and rir..', l' -Mer. 7' e : annie:it reayane of UC'T's nte v. c-n
- in Ur for1 Oi retcat.cJ LP a I.racat, and t.nc MC .-'.v.c. etre c!.c r, d*
- (ucc.' f rm i
the r.t rain Tn..murrnenta ore lir.ted in t.'bles. A tetal of 19 TN17'r: '
$7 c' vnein of strM 1 Mntr'r e:nta tJ cn t.c ra inu ta tinJ., in vil, f,fEtect r.ina vere perfor ed f er ec'.lch deta 1 vrerented con ~intiq~ or xinale r.'a i
t driaJ e ('.n t o -tr vapen c.baltce .;y) vn]vn test.s. *dl 11 n.,rer /
relief valven 4.:+:re actunt. d in the cc.orse oC the orn::ren 1 er any".mr hecucea 1 nr.J 24 oner.ir~ ter vr.1>c. with a tota.1 ef 93 v;;1ve newir.r.s, necutule.ted over the tect nra".rrui.
The revic's hv LS". in directed
- - at t'ne cen=ce:uence of tbo rcliof volve reti.in ac. i t ?cterd nas pr.wr.' n: ' re-wraturn con <litict- t o dri c't the cc: .i. >
systen in expo-:ed. I;n revie
- of the ?,tretturni ren mune in ; <;ini, per c , ..
1:V .F 3.-., .
7;.e fir 'In '" o E t!- b revir cre cou:ctned "ith t .e e_ n mnc., e; t _
test pro;.ran in detcrra.inin;; tha loNiven in.nc ed on tha to*ue <na to re m f valve actu atirm. The sum nct : n e rer e," the rrw vt 4 W /.5 -
vr- en .. '- ,ra,P in n':ing thin deterninetton. Ir. :Odit i.m * , ecver:>l s e u mtien the r .-
'anda in the strer..= prerrs.n (Part II. of the rcrnrt'/ Mvc Lee.r.vi: ed.
,( ,
I . s,/ .~~ .-
B'705050037 870428
THOMAS 87-40 PDR /. /, , , f" < -
4 ( ~. . )i Cr.s
- s e- '
/s.
A b I'" & V . 7. ...
1/oss /.. Coore ~2-The findine,<: of thi . revf m are that the rerort ir deficient in a nn: bor of nrom niace itc en tent f r. c:.cIncively devoted to r.cacarortente of strece:en r.n.1 t'cfineu cmc. .Geveral 1::nortcut tc<:t pars:.terers are n,nt fn-
'.r. efuded 11 the tent results. The deficient crer.9 nre sirr.r.rized in the follet- ~
in:; five parn3rnphc: .
- l. Conficnrotional informntion of the vent tubn from the valve to the-cxit in the torus r.hould be included f roa viiich the r.nior nar:r etern .
. af fcetiu the ttmmient liuted in : 72-W i4 can he dt.turnined. In addition, the loceMon, sine rM od bntr ent of the vr.cunn breche_rr, of cac't vent as : 01 oc the positioninc of the vent e dtn in the torus should be clearly indicated.
- 2. The ncntrer of the tent results cculd be nttv.thutable to vnrintion of certofu tent pare stern. *i: ;refcre, the styrtin cc.nfiqon fo:
caci tnnt. In ternn eT vnivo n on b tic e, mtor 1m'el end tcre. ~ r. ;nte i in tha vent -
and vent --
r'h s mro Pcc t,hould be proviled.
- 3. For the rm1ti4 vs1va e n its the open tn- Hr en of cach valve on en absolutn c-ic rolet!ve to ene another, in cddit.icn to tLe infor. cion ist 2, chould he providcJ.
. 4. The ir.f crnation on n_i- t or ni v-'ve actttutica cycinn over thn _Itv of th> pl.sut cc, contni::ed in '":.,1c 1 it, nur lict.ir.
'.r a' a c n c ' L.
reactor ogratinr, noi'es +are relief vnive(n) nre actunte:', r.r ' tf..
anticipe.tcl nir.her of c:xre.>.Jin. occurrt.nece ci occh t cJ.- over Ll-setrice 11:% of t.he @ nt haule ha inclu k/.. This bre thdo. a c.-c".'i I incluJu the tent rainirs . m ?. . cor tali.nont innMtion ith !..o. st: .
nr p]ar.t r.hutdorn, turbine trip. and reacter prensure tre enient:: .
- 5. 'Inlief valvan are rel f od ca frr cortrni of t' a nacll bro. ': lon :-+
coolt.nt eccidnu t f u the m . ii-rut.o. :r t ie islo. ....,-, . .od e . h thin <.r -
the biohcot strmner, to tie i torun etructure could rer. ult iro : t;--
i cur.cronaitf ne of coc.t: 6mnt prene.ure, cud .' cts.:n.tton ni n r:1-:d vsive st: at.iil ci:.r.ific :at prix.ry nyctna prosaurt:n. Therofare, ie dote:nindt.? tan ni~.or rcreur.19 in r!. c tort -.. t:ro .,cprroritiot M .
cad 1_treak LOCA aj valve a:cratica should bc cousinered.
The RM1ticeal inf or ">. tion, 5-4 recon-ideration of antu yttenn rMur" te.J in the para:.rnp.ut above la recJed to alle. to to Gro:"ine v: -:ther rc,rt + - t 7.'
ccadition: in t he torus for relic' ve3ve .:ccion b .vc been u ed in fot".r ':d r tito Ldet 43cv o#
Cl a torna r,tittture. Au over-i 'n> concein iith the e t_
rercita 19 that fro *r - ",t in t"nt ro M 5 c.ver tFn court > ei t' a tc t nvc ~
coul d c.3a.alb b r'un to :,l '"it v.' Ivc le .er enceuntered with r elte.- cent ra ,
vit!ch in Enwa rn rei.uca thn reverity ei vent cleario" inrin? -c} icf vii. .- i i
' s f f 6, e w ---- w-.--m- -m-- # - - * ---e -+---a -e+e- --n-e p.-<----m-+-.s +-yiq--- ,e-- % ---
'w--g-y -- w--- ---wy r 7- -'
1 1
I j
- e Venn A. 1:r ore ?, 6 L7' !
J...,.
o.
! netuntion. The. inforn.1 tion a Lc:' for in thin vrvict tdll enable a deter-4 ninntior, o f the v_ nyc.m :cr .*c ".:.inncc 1:. r*se "cr.t cinerira pM neren.9 nud cc.tr.!.lich t! e validity of presentl/ u- canerted en,cim-M en that n . cU c."
l ., . In prefere.ble to a rcachem vert cnit, nrd that rie rteni "- th vent 1 y
- 2 ft, or re!nen 1** of,the vent from ocction 'ioundarios to nid!nv in ti.e
, torun rection constitutet an i::grovenent, i
To the ente:t th::t the reclucr.tci' infornntion cannot he < inter::hed frce
, , c:tintin ; t.accurc :ents of Pr.it I tratc, the confira,tter r tc- pronr:u planneci for Unit 2 should he in9trimnted auch as to 71lt; eM , % -tc n. It in furt1Er~recen.: ended that pre :nuro f untrnrc " c*'c" m'lo"ts to th0 t e n t i ".~
l ' de.ierib d in _ VM-lOf..M Le iur.talic:1 for th!c tertin3. Pro trure oe ;. Illa-ro- clerrinc lc %3 i~no- d c:'
tionc t E to$ un ?:!sV t r nre nirect .r.>:stur.> of ti.c ver:tjn.iepenI'cr t of ntracturcl varintic,n ov ference of Re terve, fuch *::morcet vill fwccher cc: trihne to r resolutfon > the ncnerie ; ohLn of reitef valve rctuct!nn r. : a 1 M ir.
r: ode of pro :nure nurpresninn conteir.t ae.nts. i.t is rcco aender'. ti ot tvp2 ci:d IcVel of instri.',cnte.tica c picind, r. veil Fo a nuitchin tect rror.rt> fcr the 1: nit 2 tents be coordlanted trith thin bre.nch.
Cencric t.r.Jnroach b crphac1.v:d t.I.over further tm.f !w with cdditioned ir :tre entation,
- r.ce.f fien12y , re: cure la i_1. w - tr. or.F.r to rm dr. c .w a iis .prebl:en of enliaf 'vrive : ction. Tue c:.t nt to s.htc': the r-t0 t c of a cuitnL3 c tout ::rc r: for ;.re n:r icrry 2 cr.ul,; :.y.:1: 7 te r" ? ' r> 1 v.: tni r .- 17 a r.ceter unich renalu m ;+ rc~nived.
I t du.ien0- en ti. : cie'rne ni r_t ru c_tu. r..ed qbilt rity b-f.rnou to teriin *:rve-tme : cd n' t O n e. tr l r. t M " c h .:c.. -~t?
unclernte.ndin;. of the penble : vot'Id in.llente that nn int o ncti_e cx! r:tr * -
t:.can pre n'tro . vli t o'e:. a n o r- :. .' b y rc11 r1 v .O - n.ctic,a , m.. st r. c .c t_r.1 --
charnetorfetics of tin. torut:. For thin ren m th,.r.rne~eral ebere.ererf.<:tfeu cuch e.o ri d it . t.. ;t f r e ." . .:rst , typr: c' nap...rt e c., "na]n h. rn b.2 concidor.- d .doro t:. - .en. lical.11f c:. of Vroene corry tor.ts te all t oruc t
r.tri:cturen cra be accorteim".. Im en e.lt:rrneere, r. var-1 T' I cle.at.
c:;.ci repr.-< c "r civc c.J : crts . cry of cuc.4 ple.n t n , rou.'. i Y.vi: to La ch , . . J out for m m r,te en :t n n r r.
tlc !! ark II nnd III plante s.ith reinforced concretc totecils cicarly r .rn"cr t
- c. c. arate clar., of nierte .ha to the toreM - Ji m ~ nt c.trc;t r-1 c'.n - ~-
intic:. cd t'c wet.all.
. It i.. e:.ne c te.'. , w+ w r r , th c ri.m Ufc" tiv "
pra .un.. n; li tt s.n wid 17 ;. n ora te.1 in vQmr~j.ls f er the nn ' rM .
vc1 " c o N : urn e r.;- .'ac to the ;Jer.ter r!'!. ' Lv o! tbc ntructurn in t ___M.t, the pool in cent.ained. /.:.ter it in veter:;4 t".1 t ?ict .n ticJ anted prerrcr eq litu:5 cual:1 1.e critic:41 to ulcr.t cicM:-n it is racn <ndn.1 that a c ::rtite te *PN in confi..uration re , rec.mtntive of thr~.n cl :e.n_.: n ni sn):mt- h- - __.
M-}M r.h'd .
I
\ e e r e
e..a.'
. - _ , . . _ _ , ._ - . , . . _ , . _ . ~ - . . . ..m. y ._
M 8
usao A. ,,. . core -4 ..,*,
945"I ji..
, I i C c lu.c.i..r r on..c.u.b h e.t. .C. op.o..r..t.
-.o.n.- - . --
In itt: prin t-.t forri th tcport des not aden i ttel" f untify the conc. l._ur.f onc --- -
!l theit trer. e c.d.? in strivira et toi-' . r*cdific.Sttno. The 7031dity of t!.e methest etc.sloyci in dstot :Inin;; the ndennec r of the torun f,tructi!re prencnt I or 1 odifiel, over the life of tha plat is not -luntified.
4 I! - 0.-ifr.nl einted by:
4 l4
- r.chrt I. Tedesco if I'ohert L. Tedesco, /nnistent Director
,I for Contain~.ent ScTety
!.~ 111 rectorate of Liccani.nt; t
- i
U. '.!c:cv Y.
J. .'emirj c
[. .
.; . 9. Imntnter J. 01vn.1 l n.
- i -
.O C C 51T Y Il a L. C h.so
- a. . . e. . ....
J. ...J.' C*.J rn t.
. 1.3 e c.; :
.6 D. I:1..<:rhv t e S. '/cx: c 1 Cartc.r G. i.cin.w 1.. Gle:,ei n F. 1.'.t.llica i
, L - Reading
', CS - Reading CSB - Reading i Subject File a
i, t
J, .
I l cr. .- ' ... ... r' 1 C S . .. . . . . ' . . L C S B.. ... . ..La .CS. . . ...... .. . . . . . . . . . . . . .
i su . .
, LSic.;m,:.1t.. . ..CCLcidas
!!l'I -
RI.Todacco.... . ...................... . . . . . . . . .
e w
... 6 ( 2 6[]A . 4fL((,jg_4.. .. ::bl=.174- - - - - - - - - - - . . . .. - . -
. . , . . ;.o w.a
,.,, o ,,,,,,,,
,.,,,,,,,,,,,,,,,,..,333 L
y,,-. , - , _ - ~.yy.,,,_,,,,., -
,--,.--r-- - ~ . - . _ . -
f I h'.W UNITED STATES
N i ) ,
. ATOMIC ENERGY COMMISSION WASHINGTON, D.C. 20545
% /
FEB 3 6 574 D. J. Skovholt, Assistant Director for Operating Reactors Directorate of Licensing EVALUATION OF TECHNICAL REPORT " STEAM VENT CLEARING PHENOMENA AND STRUCTURAL RESPONSE OF THE BWR TORUS (MARK 1 CONTAINMENT)" (TAR-461)
Title:
Steam Vent Clearing Phenomena and Structural Response of The BWR Torus (Mark 1 Containment)
Originating Organization: General Electric Report No. and Date: NE00-10859, April 1973 Review Status: Complete In accordance with your request, the Structural Engineering Branch, Directorate of Licensing has reviewed the portion of the subject report and " Answers to AEC Questions, NED010859, Part 1" which concerns struc-tural response and stress analysis of the torus-ring header system. Our evaluation and findings are summarized as follows:
The analytical model of the entire torus-ring header system that uses bar members to represent torus segments is inadequate for dynamic analysis of the structure. Stresses due to dynamic effects in the vicinity of pipe penetrations could not be calculated since the model was not set up to yield detailed results in all torus bays. Measured strain data are not reliable due to faulty instrumentation. We conclude that the portion of the report concerning structural response and stress analysis is unacceptable and should not be referenced.
Experimental stress analysis should be emphasized for the investigation of stress and strain conditions in the critical area. Previous tests have been conducted primarily for obtaining the forcing function and .
distribution of discharge pressure on torus shell, strain and deflection measurements had not provided reliable data for analysis because of instrumental malfunction. It is suggested, therefore, that a test pro-gram should be set up for experimental stress analysis and more attention should be paid in instrumentation and measurements of strain and deflections T2CA5d .
D. J. Skovholt '5 f
at pertinent and critical areas. In addition, effects of cumulative damage and usage factor.due to previous tests should also be con-sidered to avoid possible fatigue failure in future.
""9 R. R. Maccary, Assistant Director for Engineering l
Directorate of Licensing cc w/o ent.1:
A. Giambasso, L W. G. Mcdonald, L cc w/ encl:
S. H. Hanauer, DRTA J. M. Hendrie, L D. L. Ziemann, L L. C. Shao, L S. Varga, L J. I. Riesland, L S. P. Chan, L
!? , A-iG
. xh. b d 'h +.4'-
HQ4 40 2
3 3 TECHNICAL ASSISTANCE REQUEST /
TOPICAL REPORT REVIEW ASSIGNMENT I
From Project Manager / Date of Request:
Principal Reviewer:
Date Received:
To:
Ticket Prepared by: EEW Date: 2/5/74 f TAR No.: 46l Type of Req.: TA TRR SGR SR Other Orig. Ass.: New info.: Completion I Description /
Title:
Assigned to:
Branches:
P Req. Target:
Est. Comp.:
- Status
- - - from L L '===v ta D. J. # _^_1t dated 2/ M /74 l
l l Copies to. Deputy Director, TR TR Ticket File Requestor OPS Assigned A/D i
W
_