MONTHYEARML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl Project stage: Meeting ML20205Q1051986-05-23023 May 1986 Forwards Vols 1-1C to Equipment Qualification Rept - Environ Qualification of Class 1E Electrical Equipment. Representative Sample of Equipment Will Be Installed & Available for Insp in Support of NRC Audit Project stage: Other ML20198N2061986-06-0404 June 1986 Forwards Seismic & Dynamic Qualification Program for Safety-Related Equipment, Per SER Issues 12 & 13.Meeting Requested During Wk of 860707 to Discuss Initial NRC Comments & Finalize Plans for NRC Audit Project stage: Meeting ML20206F2601986-06-16016 June 1986 Notification of 860723 Meeting W/Util in Bethesda,Md to Discuss Technical Issues Re Seismic & Dynamic Qualification Program for safety-related Equipment,Per Confirmatory Issues 12 & 13 in Oct 1985 SER Project stage: Meeting ML20206E6191986-06-16016 June 1986 Notification of 860701 Meeting W/Util in Bethesda,Md to Discuss Technical Issues Re Util 860523 Equipment Qualification Rept,Identified as SER Confirmatory Issue 14, in Preparation for NRC Audit Project stage: Meeting ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 Project stage: Meeting ML20205C3281986-08-0404 August 1986 Forwards Addendum 1 to 2BVM-166, Sqrt & Pump & Valve Operability Review Team (Pvort) Audit Program & Updated Master Equipment List,Per Sqrt/Pvort 860723 Premeeting.List Submitted to Support NRC 860930 Audit Project stage: Meeting ML20212J9281986-08-0404 August 1986 Discusses 860723 Meeting W/Util Held in Response to ,To Discuss Preparation for Sqrt & Pump & Valve Operability Review Team Onsite Review.Onsite Review to Take Place During 860930-1003.Personnel to Attend Listed Project stage: Meeting ML20205D2381986-08-0505 August 1986 Summary of 860723 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Sqrt & Pvort Review Project stage: Meeting ML20210F6021986-09-20020 September 1986 Forwards Rev 1 to Vols 1,1A,1B & 1C to Equipment Qualification Rept - Environ Qualification of Class 1E Electrical Equipment. Review & Schedule of NRC Audit Requested.List of Specs & Status of Util Response Also Encl Project stage: Other IR 05000412/19860241986-09-23023 September 1986 Insp Rept 50-412/86-24 on 860902-04.No Violation Noted.Major Areas Inspected:Licensee Activities in Areas of Operations, Maint & QA in Preparation for OL Project stage: Request ML20206T9021986-09-23023 September 1986 Forwards Responses to Sqrt/Pump & Valve Operability Review Team (Pvort) 860723 Meeting Re Pvort Audit & FSAR Project stage: Meeting ML20215N2011986-10-23023 October 1986 Discusses Results of 860701 Meeting W/Util & Contractor in Preparation for Equipment Qualification Onsite Review.Onsite Review Scheduled for 861117-21.Access for Review Team Members Requested Project stage: Meeting ML20215N2421986-10-27027 October 1986 Forwards Responses to Sqrt & Pump & Valve Operability Review Team 860930-1003 Audit Issues Project stage: Other ML20214E5881986-11-19019 November 1986 Notification of 861120 Meeting W/Util in Shippingport,Pa to Discuss Applicant Personnel Findings Made During Equipment Qualification Site Audit Project stage: Meeting ML20214V9041986-12-0303 December 1986 Forwards Updated Environ Qualification Program for Safety- Related Mechanical Equipment in Response to FSAR Questions 270.2 & 270.3 Identified in FSAR Amend 4.Qualification Methodology & Results Discussed Project stage: Other ML20207D4731986-12-19019 December 1986 Forwards Supplemental Info Re Evaluation of Superheated Steam Blowdown on Environ Qualification of Facility Equipment,Per 861125 Telcon.Response Provides Addl Info on Computer Codes Utilized in Superheat Evaluation Project stage: Supplement ML20212J5431987-03-0404 March 1987 Forwards Response to Specific & Generic Comments from Nrc/ NRR Environ Qualification Audit on 861118-20.Info Indicates That Action to Address Specific Comments Completed & Action to Address Generic Comments Prior to Fuel Load Underway Project stage: Other ML20207R0571987-03-0505 March 1987 Forwards Comments for Resolution Re SER Confirmatory Issue 14 Identified During Equipment Qaulification Review Team 861118-20 Audit.Response Requested within 45 Days of Ltr Receipt Project stage: Other ML20204H6291987-03-18018 March 1987 Notification of 870325 Meeting W/Util in Bethesda,Md to Discuss Personnel Issues Uncovered by Sqrt & Pvort,Tracked by SER Confirmatory Issues 12 & 13.Interim Safety Evaluation Encl Project stage: Approval ML19306D7901987-03-18018 March 1987 Notification That 870325 Meeting W/Util in Bethesda,Md to Discuss Personnel Issues Uncovered by Seismic Qualification & Pump & Valve Operability Review Teams Rescheduled for 870401 Project stage: Meeting ML20205G3791987-03-24024 March 1987 Forwards Responses to NRC Requests for Info Re Environ Qualification Program,Including High Energy Line Break W/ Superheat & Qualification Methodology for Submergence Project stage: Other ML20205F9351987-03-26026 March 1987 Forwards Environ Qualification of Safety-Related Mechanical Equipment, Including Rev 1 to Books 1-3 Re Masonelian air-operated Valves,Rev 4 Re Xomox Plug Valves & Rev 5 Re Pacific Charging Pumps,Per P Tam 870317 Telecopy Project stage: Other ML20206G3641987-04-0808 April 1987 Summary of 870401 Meeting W/Util Re Personnel Issues to Be Resolved as Result of Sqrt & Pvort Audits.List of Meeting Attendees Encl Project stage: Meeting ML20215H6161987-04-16016 April 1987 Forwards Responses to Seismic Qualifications Review Team & Pvort Audit Issues Re Seismic & Dynamic Qualification of safety-related Mechanical & Electrical Equipment.One Oversize Drawing Encl Project stage: Other ML20213G4471987-04-29029 April 1987 Forwards Supplemental Info in Response to Pvort SER Specific Issue 3.10.2.3(1) Request by a Masciantonio & C Kiddo During 870427 Telcon W/Et Eilmann,C Hill & B Gooden Project stage: Supplement ML20213G7641987-05-11011 May 1987 Forwards Revised Responses to Sqrt & Pvort Audit Issues, Reflecting Info Requested by NRC at 870430 Meeting & 870501 & 05 Telcons.Info Sufficient to Resolve Remaining Concerns in Confirmatory Issues 12 & 13 Project stage: Meeting ML20214E1711987-05-15015 May 1987 Notifies That Seismic & Dynamic Qualification of safety- Related Equipment Completed,W/Exception of Final Equipment Sys Tests on Three MSIVs Project stage: Other ML20214J6701987-05-18018 May 1987 Notifies of Completion of Environ Qualification (EQ) Effort for Facility EQ Packages in Compliance w/10CFR50.49. Potential 10CFR50.55(e) Items Re Improper Sealing of EQ Program Equipment Will Be Submitted within 30 Days Project stage: Other ML20214J4911987-05-25025 May 1987 Interim Significant Deficiency Repts 87-16 & 87-17 Re Conduit Sealing of 50 Class 1E Items.All Physical Work Re Re Environ Qualification Program Complete W/Exception of Four Bisco Seals Project stage: Other ML20214S8511987-06-0505 June 1987 Forwards Revised Responses to Sqrt Audit Issues,Per 870522 & 27 Requests.Util Considers Supplemental Info Sufficient to Resolve All Remaining Concerns Re Audit Issues Project stage: Supplement 1986-09-23
[Table View] |
Text
p 7
D
$YL
'A@
2NRC-6-076 Bemr Vall
- o. 2 Unit Project Organization Telecopy 2 64 Ext.160 P.O. Box 328 August 4, 1986 Shippingport, PA 15077 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Seismic And Dynamic Qualification Program For Safety Related Equipment Gentlemen:
At the Seismic Qualification Review Team / Pump and Valve Operability Review Team (SQRT/PVORT) premeeting on July 23, 1986, a schedule was establish-ed for the preparation and conduct of the BVPS-Unit 2 NRC SQRT/PV0RT Audit.
In order to support a September 30, 1986 NRC Audit, an updated Master ;cuipment List statusing qualification and installation was required by August {, 1986.
This list would allow the NRC to make their audit equipment selections by August 18,1986, six (6) weeks prior to audit.
During this premeeting, several questions relating to the BVPS-Unit 2 Equipment Master List were discussed.
In response to these questions (Master List Question No's 1 and 2 and FSAR Question No.1) please find enclosed three (3) copies of the updated Seismic Qualification Tracking System's Master Equipment List (SQT-1) and tables listing the active pumps and valves (including sizes, types, etc.).
The updated SQT-1 list indicates the qualfication status to be 93% and the validation on equipment installation to be 73% complete as of August 1,1986. As required for audit a minimum of 85%
of the equipment has been installed.
The validation program is t.
dynamic program which will continue up to audit on a one-to-one basis with the qualification status.
Ws
~
8120308 860804 ADOCK 05000412 A
PDR
r United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Seismic And Dynamic Qualification Program For Safety-Related Equipment Page 2 If there are any questions, please contact Mr. E. T. Eilmann at (412) 643-5200 extension 219.
DUQUESNE LIGHT COMPANY
\\
By J. 'J JJarey Vice President CLH/ksn Attachment NR/SEI/DYN/ QUAL ARh cc: Mr. P. Tam, Project Manager
- w/o/ attachment Mr. G. Bagchi, Engineering Branch - w/ attachment Mr. C. Kido, EG & G Idaho
- w/ attachment Mr. J. Singh, EG & G Idaho
- w/ attachment INP0 Records Center
- w/o/ attachment NRC Document Control Desk
- w/o/ attachment 1
L 4
?
I United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director i
Seismic And Dynamic Qualification Program For Safety-Related Equipment Page 3 COMMONWEALTH OF PENNSYLVANIA )
)
SS:
COUNTY OF BEAVER
)
((
day of
. f.A 4 A f d
/
h
, before me, a On this Notary Public in and for said Commonwe th and County, personally appeared J.
J. Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.
i
/fja a?/. % &r Notary Public SHEILA U. FATT0RE, ticiAn PUBUC SHIPPillGPORT BOR0, BEAVER COUNIY MY COMuts$10lt EIPIRES OCT. 23,1989 thmbx, Ponnsyhonb Asscebtica of f!a'nts 4
l LIST OF FIGURES Figura Title 1-1 Flow Chart of BVPS-2 Procedure for Design and Configuration Control j
1-2 Flow Chart of BVPS-2 Procedure for Qualification Report Review 3-1 Flow Chart of BVPS-2 Procedure for the NRC SQRT and PVORT Program 3-2 Fl'ow Chart of BVPS-2 Procedure for Equipment Summary List Generation i
7-1 BVPS-2 Terminology for Seismic Data Sheet 9-1 Flow Chart for Selecting the Method of Equipment Qualificaticn 11-2 SWEC-2 Form - Review o.! Supplier's Technical Document LIST OF AT'.'ACHMENTS Attachment Title I
- Master Specification Inset t for Dynamic Qualification of BVPS-2 Equipment 1
II 2BVM-166 BVPS-2 SQRT and PVORT Audit Program III - 2BVM-176 BVPS-2 Seismic Qualification Task Group Organization (SWEC) and Procedures IV - SQT-1 Current BVPS-2 Equipment Summary List Summary of Active Valves (BOP)
V 4
Rev. 1 Summary of Active Pumps (BOP)
VI i
l 11
4 SECTION 4 SEISMIC CATEGORY I EQUIPMENT
(N s,,)
Seismic Category I encompasses.those structures, systems, and are designed to remain components that are safety-related and t
functional in the event of a Design Basis Earthquake (DBE).
These are structures, systems and components necessary to ensure:
1.
The integrity of the reactor coolant pressure boundary.
2.
The capability to shut down the reactor and maintain it in a safe shutdown condition.
3.
The capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures comparable to the guideline exposures of 10CFR100.
Within the context of the SQRT/PVORT, the term ' equipment' refers to those elements of BVPS-2 that constitute a system, exclusive of piping, tanks,
- etc, and is taken to include mechanical components, electrical devices, and their supporting structures.
Besides the generic classifications, mechanical and electrical, equipment is also functionally classified as active or inactive.
As defined in RG 1.48, active components must perform a mechanical motion during the course of accomplishing a system safety function (a relay that changes state, or a valve that a safety-related event).
Active.
\\
opens / closes during or after valves and pumps are listed in Attachments V and VI.
Rev. 1
,4 1
i
)
s 1
4-1
. - -. - -