Discusses Results of 860701 Meeting W/Util & Contractor in Preparation for Equipment Qualification Onsite Review.Onsite Review Scheduled for 861117-21.Access for Review Team Members Requested
ML20215N201
Person / Time
Site: Beaver Valley
Issue date: 10/23/1986
From: Tam P
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-62897, NUDOCS 8611040430
Download: ML20215N201 (2)


Text

~ .; ,,

October 23, 1986 Docket No.: 50-412 DISTRIBUTION DocketJ11e, N. Thompson, DHFT NRC PDR P. Tam Local PDR D. Miller Mr. J. J. Carey, Senior Vice President PAD #2 Rdg ACRS(10)

Duquesne Light Company T. Novak Tech Branch Nuclear Group OGC Gary Files

~ Post Office Box 4 E. Jordan Shippingport, PA 15077 B. Grimes J. Partlow

Dear Mr. Carey:

SUBJECT:

BEAVER VALLEY' UNIT 2 - ONSITE REVIEW BY THE EQUIPMENT QUALIFICATION (EQ) REVIEW TEAM In response to your letter dated May 23, 1986, we held a meeting with:your staff and contractor personnel on July 1,1986 in preparation for the EQ onsite review. Subsequent to the meeting, your staff agreed that the onsite.

- review will take. place from during November 17 to 21, 1986. Also, subsequent to the July meeting, a revised EQ report was submitted-by you on September 20, 1986.

The EQ review will be conducted by the following personnel: Harold Walker.of NRC, and H. L. Magleby and M. Trojovsky of EG&G Idaho, Incorporated. Please ensure that these personnel are granted the necessary security-passes for easy access.

We will be in touch with your staff (E.T. Eiimann and R. Martin) to work out additional details of this onsite review. Thank you for your. cooperation.

Sincerely, pgmalSigaca by Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A cc: See next page D t)(2:TA DPLA:PD# PM D l#2:D D er:pab PTam p LRubenstein 10 86 ~ 10/43/89 10/y86 8611040430 861023 PDR ADOCK 05000412 A PDR

m . o 1 0

Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station cc:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 2300 N Street, N.W. Beaver Valley Two Project Washington, DC 20037 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077

. Director, Pennsylvania Emergency .

Management Agency Room B.151 Transportation & Safety Building

.Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 -Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. J. Beall U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh,-Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229 l

,