f:
A.
'Af WU$1t a ey 880. 2 Unit Project Organtration 2NRC-6-053 hep P.O. Boa 32l (412) 643 5200 Telecopy (414) 643 5200 Shippingport, PA 15077 Ext. 160 M y 23, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Equipment Qualification Report - Environmental Qualification of Class 1E Electrical Equipment i
Gentlemen:
Enclosed are six (6) copies of the Equipment Qualification Report which describes the Beaver Valley Power Station - Unit 2 (BVPS-2) environmental qualification program for electrical equipment important to safety.
The Equipment Qualification Report was initially submitted to the NRC on June 22, 1984 as a separate submittal from the FSAR and in response to FSAR Questions 270.2 and 270.3. The Equipment Qualification Report -is comprised of two parts:
- 1) environmental qualification of electrical equipment important to safety (Enclosed) and 2) environmental qualification of safety related mechanical equipment (to be resubmitted at time of audit). entitled " List of Specifications for Enviromiental Qualification Review" contains the status of EQ packages for NRC audit.
Of the total 126 EQ packages, 88 of these packages contain equipment located in harsh area environments. identifies 76 of tituse harsh area packages as finalized and approved by DLC for NRC au.iit.
The ranaining packages are in various states of completion, but are not yet considered totally acceptable by DLC.
Volumes 1A, 18 and 1C of this Report contain the System Component Evaluation Worksheets (SCEWs) and associated notes for all equipment associated with the 76 packages statused as audit ready.
Twelve of these packages have not yet been clerically finalized and therefore the SCEWs hav e been st amped preliminary.
The SCEWs to these 12 packages will be resubmitted to the NRC prior to the audit. The SCEWs serve only as a summary of the EQ documentation and, in some cases, the entire documentation is needed to fully understand the contents of a SCEWs.
Pam mmm v
Pg
\\
UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Harold R. Denton, Director Equipment Qualification Report Page 2 Appendix A to this report is the Stone and Webster Engineering Corporation (SWEC) Project Manual 2BVM-119; Environmental Conditions for Class 1E Equipment Qualification Requirements, Revision 8 (current revision).
The majority of. SCEWs provided in this report have been finalized to 2BVM-119 Revision 7.
The differences between Revision 7 and Revision 8 are minor and h ave not compromised the demonstration of adequate qualification.
Addi tionally, Figure I.a, Containment Temperature Envelope for Equipment Qualification MSLB & LOCA (Attachment 2) is provided to demonstrate the actual peak temperature requirement reflected in the attached SCEWs.
2BVM-119 will be updated by audit to include the revised Figure I.a.
In support of the NRC Audit, a representative saple of the equipment will be installed and available for NRC inspection.
BVPS-2 is presently 95%
complete and is scheduled for receipt of a low power operating license by April 30, 1987. A verification progra is underway to assure the installed condition agrees with the qualified condition. This effort is being performed concurrent with the system turnover schedule.
DLC will have available, as a minimum, a representative sample of all equipment associated with the 76 packages approved for audit.
A listing of installed equipment will be provided prior to the audit for the NRC to make their selections for audit.
DLC is prepared and ready to support an NRC Audit of the BVPS-2 Environmental Qualification Program for electrical equipment important to safety as early as June 30, 1986.
With the submittal of this Report, DLC requests a pre-meeting with the NRC the week of June 9,1986, to discuss any initial comments the NRC might have concerning the attached submittal and a schedule for conducting the NRC Audit.
If there are any questions regarding this matter, please contact Mr. E. T. Eilmann at (412) 643-5200, extension 219.
DUQUESNE LIGHT COMPANY By J. J. CW ey Vice President ETE/ijr At tachments NRC/NRC/EQR AR/NAR cc: Mr. P. Tam, Project Manager (w/o)
Mr. L. Prividy NRC Resident Inspector (w/a)
INP0 Records Center (w/o)
NRC Document Control Desk (w/o)
United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Equipment Qualification Report - Environmental Qualification of Class 1E Electrical Equipment Page 3 C0tN0NWEALTH OF PENNSYLVANIA )
)
ss-COUNTY OF
[
)
On this JM' day of
, / 9 b
, before me, a Notary Public. in and for said. Common' wealth and County, personally appeared J.
J.
Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statenents set forth in the Submittal are true and correct to the best of his knowledge, f
... W Notary Public
/
ELVA G. LESCNDAK, NOTARY FUCUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXNRES OCTOBER 20,198
United States Nuclear Regulatory Comission Mr. Harold R. Denton, Director Equipment Qualification Report Page 4 bcc:
J. A. Kline
- w/o/ attachments T. D. Jones
- w/o/ attachments R. J. Swiderski
- w/o/ attachments C. E. Ewing
- w/o/ attachments H. M. Siegel
- w/o/ attachments J. A. Hultz
- w/o/ attachments A. A. Dasenbrock
- w/o/ attachments
- R. S. Christner
- w/o/ attachments G. L. Beatty
- w/o/ attachments K. M. Holcomb
- w/o/ attachments J. Lee, Esq.
- w/o/ attachments S. L. Pernick, Jr.
- w/o/ attachments C. L. Hill
- w/o/ attachments D. G. Szucs
- w/o/ attachments W. Laughlin
- w/o/ attachments D. Scapini
- w/o/ attachments D. E. Burke (CEI)
- w/o/ attachments R. G. Schuerger (CEI)
- w/o/ attachments B. M. Miller (2) (0EC)
- w/o/ attachments C. Earle (S&W)
- w/o/ attachments R. Hyslop (S&W)
- w/o/ attachments A. Raychaudhuri (S&W)
- w/o/ attachments C. Richardson (S&W) (3)
- w/o/ attachments J. Sutton (S&W)
- w/o/ attachments J. J. Carey
- w/ attachments J. D. Sieber
- w/ attachments R. E. Martin
- w/ attachments N. R. Tonet
- w/ attachments T. P. Noonan
- w/ attachments J. P. Thomas
- w/ attachments T. J. Zoglmann
- w/ attachments K. E. Woessner
- w/ attachments W. R. Rutherford
- w/ attachments F. A. Oberlitner
- w/ attachments E. T. Eilmann
- w/ attachments E. Lauck
- w/ attachments J. Silberg
- w/ attachments J. Kasunick
- w/ attachments
.D. Miller (W)
- w/ attachments J. Steinmetz (W)
- w/ attachments BV-2-NCD-SEG/PIiase II PUC Audit Distribution PDR-378 (4)
- w/o/ attachments NCD File
- w/ attachments
?
BVPS-2 EEQ List of Specifications for Environmental Qualification Review with Status Specification ED Package Supp l ie r/
Quallrication' Number ID Number Eauloment Descriptiun Ma nufac tu re r Status 2BVS-001 Nuclear Steam Supply System AE-01 Medium Pump-Motors (Outside Containment)
Westinghouse Audit AE-05 La rge Pump Motors (Outs!de Containment)
Westinghouse Audit
^
ESE-01A Press Trans Qual Group A Westinghouse Audit ESE-01B Varitrak Press Trans Group A Westinghouse Audit ESE-02 Press Trans Qual Group B Westinghouse
-Audit ESE-02C Tobar Press Trans Westinghouse Audit ESE-03A Dirr Press Trans Group A Westinghouse Audit (Inside Containment)
ESE-04 Diff Press Trans Group B Westinghouse Audit (Outside Containment)
ESE-05 RTDs - RCS Bypass Manifold Westinghouse Audit ESE-06 RTDs - RCS Well Mounted Westinghouse Audit ESE-08B Two Section PWR Range Westinghouse Audit Neutron Detectors ESE-10 Nuclear Instr Sys (NIS) Console Westinghouse Post Audit ESE-12A Operator Interrace Modules Westinghouse Post Audit ESE-13 Process Protection System Westinghouse Post Audit ESE-14 I nd ica to r, Post-Accident Monitoring Westinghouse Post Audit ESE-16 Solid State Protecting System and Westinghouse Post Audit Sa fegua rd Cab.
ESE-20 Reactor Trip Switchgear Westinghouse Audit ESE-23A Loop Stop Valve Cabinct Westinghouse Post Audit ESE-40A Flow Indicatnr Switches Westinghouse Audit m e, 1 of 7 "E
mn ta :r
- Audit
- Scheduled to be rinaIizod for audit S$
Post Audit - Not scheduled for finalization until af ter audit
$pn
f BVPS-2 EEQ List of Specifications for Environ _ mental Qualiri. cation Review with Status Specification ED Package Ma nu factu re r Status Supp l ie r/
Qualification
- Number ID Number '
Equipment Descrio115Lq
'ESE-42A R1Ds - Surface Mounted Westinghouse Audit ESE-43A incore Thermocouple Westinghouse Audit ESE-43C Thermocouple Adaptor / Splice Westinghouse Post Audit ESE-43E Mini Thermocouplo Connector and Westinghouse Audit Potting Adaptor / Cable Splice Assembly ESE-44A Incore Thersecouple Junction Westinghouse Audit Box ESE-47B Low Noise Source Range Preamplifier Westinghouse Audit ESE-47C Nuclear instrumentation System (NIS)
Westinghouse post Audit Cabinet, Sources ac InterrHndiate Range ESE-47D Bottom inserted Westinghouse Audit Source / Intermediate Range Excore Houtron Detector ESE-53 Mic rop rocesso rs Westinghouse Post Audit ESE-55 Auxilia ry Safeguard Cabinet Westinghouse Post Audit ESE-62A Shunt Trip Attachment / Auto PNL Westinghouse Post Audit ESE-638 Plasma Display Westinghouse Post Audit HE-01 Safety-ReIated Limitorque Westinghouse Audit Motor Oper. Group A lie-02/5 Sarety-Related Solenoid Valves Westinghouse
- Audit, HE-03/6 Safety-Related Externally Mounted Westinghouse Audit Limit Switch lie-04 Limitorque Motor Operators Westinghouse Audit (Outside Containment)
HE-07 RV Position Indicating Device Westinghouse Audit HE-08 Conax and Litton Eicctric Seal Westinghouse Audit 2 of 7
- Audit
- Scheduled to be finalized for audit Post Audit - Not scheduled for finalization until af ter audit W
RVPS-2 EEQ List of Specifications for Environmental Qualification Review with Status
-)
Specification ED Package Supp l ie r/
Qualification
- j Number ID Number
[auipment DescriDtion Manu fac tu re r Status i
Ast,embiles HE-09 Garret (PORV) Solenoid Oper.
Westinghouse Audit Pilot Valve & Indict.
HE-10A Head Vent System - Target Rock Westinghouse Audit (SOV) isolation Valve HE-108 Head Vent System - Ta rget Rock Westinghouse Post Audit (Electronic Control Module)
HE-10C liead Vent System - Target Rock Westinghouse Audit (Modulating Valve) 2BVS-10 2BV-10 Prima ry Component Cooling Water Ingersoll Rand Audit Pumps
=
2BVS-11 2BV-11 fuel Pool Cooling Pumps Coulds Pumps Audit 2BVS-15 2BV-15 Reci rculation Spray Pumps Bingham-Willamette Audit 2BVS-24 2BV-24 Quench Spray Pumps Bingham-Willamette Audit l
2BVS-67 2BV-67 Ball Valves Manual &
Cont roma t ic s Audit Moto r-Ope ra ted 2BVS-76 2BV-76 Motor-Operated Butterfly Valves Henry Pratt Audit 2BVS-76A 2BV-76A Motor-Operated Butterfly Valves Posi-Seal Audit 2BVS-77 2BV-77 Motor-Operated Carbon Steel Walworth Audit Valves 2BVS-82A 2BV-82A Motor-Uperated Stainless Steel Ancho r/Da rl ing Audit Valvos 2BVS-91 2BV-91 Motor-Operated Plug Va lves Turline Audit 2BVS-92 2BV-92 feedwater isolation Valves Bo rg-Wa rne r Audit 2BVS-94 2BV-94 fi re-Water Booster Pump Coulds Pumps Post Audit 2BVS-98A 2BV-98A Self C!oaning Strainers Zurn Industries Post Audit 3 of 7
- Audit
- Scheduled to be finalized for audit Post Audit - Not scheduled for finalization until after suait
CVPS-2 EEQ List of So cifications for Environmental Qualification Review with Status Specification ED Package Supp l ie r/
Qualification
- Number ID Number Lqi!1pment Description Ma nu fac tu re r Status l
2BvS-116 2BV-116 Ex-Core Neutron flux Moni toring Camma Metric Post Audit System 2BVS-134 2BV-134 Hydrogen Recombiner Rcckwell Post Audit 2BVS-135 2BV-135 Chemical injection Pus.p C ra ne-Dem i ng Audit Pumps 2BVS-150 2BV-150 Axial Flow Fans Joy Mrgr.
Audit l
2BVS-157 20V-157 Vent Filter Assemblies American Ai r Post Audit filter 2BVS-160 2BV-160 Refrigerant Condensing Units Ca rrie r Post Audit 2BVS-162 2BV-162 Centrifugal fens Buffa lo Forge Audit 2BVS-179 2BV-179 Air Conditioning Units Ca rrie r Audit 2BVS-185 2BV-185 Air & Motor-Operated Dampers American Warming Audit 2BVS-186 2BV-186 Air flow It:dicators and Controls Ai r Moni tor Corp.
Audit 2BVS-192 2BV-192 ( PNL)
Self-Contained Air Conditioning Ellis & Watts Post Audit 2BV-192 (MTR)
Units Post Audit 2BVS-208 2BV-208 Steam Cene#rators Auxiliary ' feed Ellis & Watts Audit Pumps and Drivers 2BVS-20?A 2BV-209A E/H Actuated Valve Copes-Vulcan Post Audit 2BV-209A ( PNL)
Post Audit 2BVS-211/211A 2BV-211/211A Main Steam Trip Valve ( Actuator)
G&W fluid Post Audit System Div.
2BVS-224 2BV-224 Service Water Pumps Byron Jackson Post Audit 2BVS-225 2BV-225 (LVDT) Main Steam Safety Valves Crosby Va lves Audit 2BV-225 (PNL)
Post Audit 2BVS-230 2BV-230 Emergency Diesel Cenerators Colt industries Post Audit 4 of 7
- Audit
- Scheduled to be finalized for audit Post Audit - Not scheduled for finalizatior, until after audit
)
CVPS-2 EEQ List of Sorcifiyations for Environmental Qualification Review with Status Spccification ED Package Supp l ie r/
Qualification
- Plumbe r ID Number Equipment D_esgriftJgg Ma nu f ac tu re r Status 2BVS-245 2BV-245 Diesel Caucrator fuel Oil Coulds Pumps Post Audit Transfer Pumps 2BVS-304 2BV-304 4160 V Switchgear Could-Brown Post Audit Boveri inc.
2BVS-307 2BV-307 480 V Unit Substations Could-Brown Post Audit Boveri, Inc.
2BVS-309 2BV-309 5000 V Power Cable Kerite Co.
Audit (931A) 2BVS-310 2BV-310 (Fuse) 480 V MCC's
- Could-Brown Audit 2BV-310 (MCC)
Boveri, Inc.
Audit J
2BVS-311 2BV-311 Ma i n Cont ro l Boa rd York Elector Post Audit 2BVS-312 2BV-312 600 V Power Cable Okonite Audit (9318) 2BV-312 (Cable)
Audit 2BVS-317 2BV-317 E1ectricai Pet etra t Icas Westinghouse Audit 2BVS-324 2BV-324 300 V instrument control Cable Cleveland Audit SwI tchboa rd 2BVS-326 2BV-326 liigh Temperature Cable Rockbestos Audit 2BVS-328 2BV-328 ASEA Relays ASEA Post Audit 2BVS-337 2BV-337 isolating Regulating Power Audit T ransfo rme rs Conversion 2BVS-342 2BV-342 130 Vdc Battery Chargers Power Post Audit Conversion 2BVS-350 2BV-350 125 Vdc Switchboards Reliance Elec.
Post Audit 2BVS-358 2BV-358 125 Vdc Battery Breaker Could inc.
Post Audit SwI tchgea r 2BVS-361A 2BV-361A Vital Bus inverter Rectifiers E lga r Co rp.
Post Audit 5 of 7
- Audit
,- Scheduled to be finalized for audit Post Audit - Not scheduled for finalization until after audit
.-. 7 BVPS-2 EEQ List of Specifications for Environmental Qualification Review with Status Specification ED Package Supp l i e r/
Qualification
- Number ID Number Eculoment Descriotion Ma nufactu re r Status 2BVS-363 2BV-363 (RECPT) AC/DC Distribution Panels Systems Control Post Audit 2BV-363 ( PNL)
Audit-2BVS-389 2BV-389 600 V Control Cable Rockbestos Audit 2BVS-509A 2BV-509A Radiation Monitoring GA Post Audit Technologies 2BVS-555 2BV-555 Heat T rac i ng Thermon Audit 2BVS-611 2BV-611 Resistance Temperature Conax Audit Detectors 2BVS-635A 2BV-635A Sump Laval Transmitters and fluid Audit Switches Components 2BVS-636 2BV-636 Resistance Temperature Detectors PYCD Audit 2BVS-648A 2BV-648A Electrical D. P. T rapsmi tte rs Rosemount Audit 2BVS-651 2BV-651 Ai r-Operated Valves Masonellan Audit 2BVS-666A 2BV-666A Below Sealed Control Valves ITT Hammel Audit Dahl 2BVS-672A 2BV-672A Chlorine Detectors Anacon Post Audit 2BVS-676 2BV-676 ( PNL) flydrogen Analyzer EC&G Post Audit 2BV-676 Post Audit 2BVS-689 2BV-689 Temperature Switches Fluid Audit Component 2BVS-693 2BV-693 Flow & D.P.
Indicating Switches ITT Barton Post. Audit 2BVS-719 2BV-719 In-Line SOV's Target Rock Audit 2BV-719 (MILD)
Post Audit 2BVS-723 2BV-723 Analog Instruments and Racks Westinghouse Post Audit 2BVS-731 2BV-731 Control & Rolay Panels Systems Control Post Audit 2BVS-739 2BV-739 Isolation Devices Struthers Dunn Audit 6 of 7
- Audit
- Scheduled to be finalized for audit Post Audit - Not scheduled for finalization until af tor. audit
.1 EVPS-2 EEQ-
~}
.1 List er Specifications for Envir"nmental Qualification Review with Status
'(
I Specification ED Package Supp l ie r/
Qualification
- l Number ID Number
[guioment Description Ma nufac tu re r Status t*
2BVS-816 2BV-816 600 V Control Cablo Okonite Audit I
I 2BVS-816A 2BV-816A 600 V Shielded Control Cable Rockbestos Audit j
l 2BVS-821 2BV-821 1500/1600/142 NUC Series
. Ma ra thon Post Audit Te rmina l Blocks 2BVS-827 2BV-827 300 V Control Cable Brand Rex Audit 2BVS-828 2BV-828 600 V Power Cable Okonite Audit 2BVS-835 2BV-835 Esergency Distributien Squa re D Audit i
T ra ns fo rme rs 2BVS-841 2BV-841 Control Storage Batteries Exide Post Audit i
2BVS-847 2BV-847 Air Pax Circuit Bredkers Airpax Post Audit
[
2BVS-931 Electrical installation b
2BV-309(931A) a.
Kecite Spiice Kits Ke ri te' Co.
Audit i
2BV-312(9318)
- b. Okonite Splice Kits for Okonite Audit
{
600 V Power Cable l
- c. Raychem Splice Kits Raychem Audit 2BV-931( D)
- d. Rockbestos SIS Wire Rockbestos Audit i
I 2BV-931( E )
- e. Ma ra thon 1500 DJ Te rmina i Ma ra than Post, Audit Blocks 2BV-931(F)
- f. Westinghouse OT-2 Switches, Westinghouse Post Audit Mina li tes, Croup W Swi tches, etc.
)
- h. Amp Te rmina l Lugs AMP Audit i
k 7 of 7 l
t
- Audit
- Scheduled to be finalized for audit Post Audit - Not scheduled for finalization until after audit i
i i
400-333 3 F @
333.3*F @ 80 SEC fp 310*F e 150 SEC
$g 275*F e 160 SEC 275*F e 300 SEC g
g 267'F e 780 SEC o
300-
_,r I
I 255*F G 1800 SEC F
l l
[.
l E
I I
l 225'F @ 2000 SEC 33g.7 g l
i 10 SEC a
I l
II I
I I
h10 SEC15p*F e 13p*F e 3
200 -
ll 11 I
l I
i 10 SEC ll e
l l
11 l
l ll 1
l ll l
l ll l
l l I
W 130 l
l ll l
g
!iOL l
l ll l
l-l I
I 1
I ll l
l ll I
E I
I ll l
l ll I
I I
o l
I il I
i ll I
I I
ll I
I l
l l lllll 11 i
1 I
l l l ll1ll l
l l l l lllll l l l llllll l l l llllll l
l l l lllll l l l llllll l :
l 10' 10 10' 10 10 10 10 10' TIME AFTER BRE AK - (SEC)
NOTE: 1. TEMPERATURE INCRE ASES LINE ARLY FROM IOS*F TO 130*F IN 0.1 SEC.
FMRE I a
- 2. BEYONO THIS POINT, TEMPERATURE WILL BE CONT AINMENT TEMPERATURE CONST ANT AT 130 F FOR AS LONG AS THE ENVELOPE FOR EQUIPMENT COMPONENT MUST OPER ATE.
QU ALIFIC ATION
- 3. TEMPER ATURE / TIME R AMPS ARE LINE AR.
MSLB de LOCA BE AVER VALLEY - UNIT 2 g BV2CHRTO1
=<
- -.