MONTHYEARML20128H1261985-06-0606 June 1985 Summary of 831219 Meeting W/Util & S&W in Bethesda,Md Re Util Equipment Qualification Program.Meeting Agenda & Supporting Documentation Encl Project stage: Meeting ML20205Q1051986-05-23023 May 1986 Forwards Vols 1-1C to Equipment Qualification Rept - Environ Qualification of Class 1E Electrical Equipment. Representative Sample of Equipment Will Be Installed & Available for Insp in Support of NRC Audit Project stage: Other ML20206E6191986-06-16016 June 1986 Notification of 860701 Meeting W/Util in Bethesda,Md to Discuss Technical Issues Re Util 860523 Equipment Qualification Rept,Identified as SER Confirmatory Issue 14, in Preparation for NRC Audit Project stage: Meeting ML20203G4881986-07-28028 July 1986 Summary of 860701 Meeting W/Util,Westinghouse & S&W in Bethesda,Md Re Preparation for Onsite Equipment Qualification Audit.Agenda & Attendee List Encl.Audit Expected to Take Place in Aug 1986 Project stage: Meeting ML20205C3281986-08-0404 August 1986 Forwards Addendum 1 to 2BVM-166, Sqrt & Pump & Valve Operability Review Team (Pvort) Audit Program & Updated Master Equipment List,Per Sqrt/Pvort 860723 Premeeting.List Submitted to Support NRC 860930 Audit Project stage: Meeting ML20210F6021986-09-20020 September 1986 Forwards Rev 1 to Vols 1,1A,1B & 1C to Equipment Qualification Rept - Environ Qualification of Class 1E Electrical Equipment. Review & Schedule of NRC Audit Requested.List of Specs & Status of Util Response Also Encl Project stage: Other ML20215N2011986-10-23023 October 1986 Discusses Results of 860701 Meeting W/Util & Contractor in Preparation for Equipment Qualification Onsite Review.Onsite Review Scheduled for 861117-21.Access for Review Team Members Requested Project stage: Meeting ML20214E5881986-11-19019 November 1986 Notification of 861120 Meeting W/Util in Shippingport,Pa to Discuss Applicant Personnel Findings Made During Equipment Qualification Site Audit Project stage: Meeting ML20214V9041986-12-0303 December 1986 Forwards Updated Environ Qualification Program for Safety- Related Mechanical Equipment in Response to FSAR Questions 270.2 & 270.3 Identified in FSAR Amend 4.Qualification Methodology & Results Discussed Project stage: Other ML20207D4731986-12-19019 December 1986 Forwards Supplemental Info Re Evaluation of Superheated Steam Blowdown on Environ Qualification of Facility Equipment,Per 861125 Telcon.Response Provides Addl Info on Computer Codes Utilized in Superheat Evaluation Project stage: Supplement ML20212J5431987-03-0404 March 1987 Forwards Response to Specific & Generic Comments from Nrc/ NRR Environ Qualification Audit on 861118-20.Info Indicates That Action to Address Specific Comments Completed & Action to Address Generic Comments Prior to Fuel Load Underway Project stage: Other ML20207R0571987-03-0505 March 1987 Forwards Comments for Resolution Re SER Confirmatory Issue 14 Identified During Equipment Qaulification Review Team 861118-20 Audit.Response Requested within 45 Days of Ltr Receipt Project stage: Other ML20205G3791987-03-24024 March 1987 Forwards Responses to NRC Requests for Info Re Environ Qualification Program,Including High Energy Line Break W/ Superheat & Qualification Methodology for Submergence Project stage: Other ML20205F9351987-03-26026 March 1987 Forwards Environ Qualification of Safety-Related Mechanical Equipment, Including Rev 1 to Books 1-3 Re Masonelian air-operated Valves,Rev 4 Re Xomox Plug Valves & Rev 5 Re Pacific Charging Pumps,Per P Tam 870317 Telecopy Project stage: Other ML20214J6701987-05-18018 May 1987 Notifies of Completion of Environ Qualification (EQ) Effort for Facility EQ Packages in Compliance w/10CFR50.49. Potential 10CFR50.55(e) Items Re Improper Sealing of EQ Program Equipment Will Be Submitted within 30 Days Project stage: Other ML20214J4911987-05-25025 May 1987 Interim Significant Deficiency Repts 87-16 & 87-17 Re Conduit Sealing of 50 Class 1E Items.All Physical Work Re Re Environ Qualification Program Complete W/Exception of Four Bisco Seals Project stage: Other 1986-07-28
[Table View] |
Text
s
~
w g
2NRC-6-121 (412) 643-5200 Beaver Valley No. 2 Unit Project Organization Telecopy (412) 643-5200 Ext.160 QG Dec. 3, 1986 u
o Shippingport, PA 15077 Mr. Harold R. Denton Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Environmental Qualification of Safety Related Mechanical Equipment Gentlemen:
Submitted for your review at this time are six (6) copies of the updated Environmental Qualification Progran for Safety Related Mechanical Equipment.
This progran has been performed by Duquesne Light Company (DLC) in response to FSAR Questions 270.2 and 270.3 identified in FSAR Amendment 4 (2NRC-3-096, dated December 2,1983).
The progran as revised contains the following information:
- 1) Qualification methodology utilized 2)
Detailed master listing of equipment included
- 3) Qualification results It is understood that thre e - items will be chosen by the NRC for detailed revi ew.
Extensive back-up documentation and additional information is avail-able in conjunction with the progran and will be transmitted to you for those items selected.
The evaluation's results are now complete and DLC has initiated steps to qualify that equipment which has been identified as not having the ability to withstand the postulated environments (Approximately 5% of equipm.
included in the prooran).
Equipment items with the EQ status' code of "I" oenoted on this master list are included in this category.
This generally indicates that a particular type and/or model number is not well suited for a specific area (i.e.,
containment) as opposed to the item lacking any subs t ant i al qualification levels.
A K
00 2
o PDR s6
United States Nuclear Regulatory Commission Mr. Harold R. Denton Environmental Qualification of Safety Related Mechanical Equipment Page 2 1
All requests for additional information should be coordinated through Mr.
C. L. Hill who can be contacted at (412) 393-7840.
DUQUESNE LIGHT COMPANY By
/
g Q. J.~Woolever Vice President Special Nuclear Projects CLH/ijr NR/EQ/ MECH /EQP At nts AR cc: Mr. P. Tam, Project Manger J. Beall, Senior Resident Inspector L. Prividy, Resident Inspector H. Walker, NRC NRC Document Control Desk
j United States Nuclear Regulatory Commission Mr. Harold R. Denton Environmental Qualification of Safety Realted Mechanical Equipment Page 3 COMMONWEALTH OF PENNSYLVANIA )
l SS:
COUNTY OF BEAVER
// bay of
[4fX[
/[
, before me, a On this Notary Public in and for said Commonwealth and County, personally appeared E. J. Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal cn behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, h Afd) k
- W Notary Public SHERA E. FATTORE NOTART PUBUC SillPPIR0 PORT B0BO, BEAVER C00MY NT COMMIS$100 HPIRES OCT. 23.1989 hhr. Petvwtmia A:seeistfoe of Notniss
-r-
-