Forwards Seismic & Dynamic Qualification Program for Safety-Related Equipment, Per SER Issues 12 & 13.Meeting Requested During Wk of 860707 to Discuss Initial NRC Comments & Finalize Plans for NRC Audit
ML20198N206
Person / Time
Site: Beaver Valley
Issue date: 06/04/1986
From: Woolever E
DUQUESNE LIGHT CO.
To: Tam P
Office of Nuclear Reactor Regulation
Shared Package
ML20198N209 List:
References
2NRC-6-057, 2NRC-6-57, TAC-62895, TAC-62896, NUDOCS 8606060012
Download: ML20198N206 (3)


Text

3%

'Af DKluesne Udit Beaver Valley No. 2 Unit Project Organization 2NRC-6-057 SEG Butiding (412) 643-5200 90 po . PA 15077 g June 4, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washingtcn, DC 20555 ATTENTION: Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Seismic And Dynamic Qualification Program For Safety-Related Equipment Gentlemen:

Enclosed are six (6) copies of the Seismic and Dynamic Qualification Program for Safety-Related Equipment for Beaver Valley Power Station Unit 2 (BVPS-2). The Seismic and Dynamic Qualification Progran consists of a Road Map which defines the qualification process for Seismic Category I (safety-related) equipment for BVPS-2. The procedures referenced in the Road Map are the latest approved procedures used to accomplish the qualification process.

The seismic design of BVPS-2 equipment is discussed in detail in BVPS-2 Final Safety Analysis Report (FSAR) Sections 3.7, 3.8, 3.9, and 3.10 originally docketed on May 18, 1983. Responses to NRC questions 230.1 - 230.5 and 231.1 - 231.5 relating to seismic qualification were submitted in FSAR amendments between December 1983 and May 1985. The information enclosed is in response to SER Confirmatory Issues 12 and 13.

The construction of BVPS-2 is presently 95% complete with receipt of a low power operating license scheduled for April 30, 1987. As required for audit, a minimum of 85% of the Seismic Category I equipment has been installed.

DLC has instituted a verification program to assure the installed condition agrees with the qualified condition. This effort is being performed concurrent with the system turnover schedule. To date, 31% or 1100 items out of a total I of 3535 equipment items have been verified. By July 30, 1986 a minimum of 85%

of the equipment items (3005/3535) will be verified in preparation for the NRC Audit. The status of this program is contained on the enclosed Seismic Quali-fication Tracking System's Equipment Summary List (SQi-1). This list will be ,

updated to indicate the latest equipment status and periodically submitted to I the NRC, to aid in making equipment selections for the audit. l c..p[L*3 '

EW C L. TD '- pg(L. \ll 8606060012 860604 PDR ADOCK 05000412 e enR 4.PoA w f y i 4:u w.

tA. g3ricw OT R.

United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Seismic And Dynamic Qualification Program For Safety-Related Equipment Page 2 Duquesne Light Company is prepared and ready to support an NRC Audit of the BVPS-2 Seismic and Dynamic Qualification Program as early as July 30, 1986. With the submittal of the enclosed Road Map, DLC requests a premeeting with the NRC the week of July 7,1986, to discuss any initial comments the NRC might have concerning the attached submittal and to finalize plans for the NRC Audit. If there are any questions regarding this matter, please contact Mr.

E. T. Eilmann at (412) 643-5200, extension 219.

DUQUESNE LIGHT COMPANY By _.

T. .~Woolever Vi President TJZ/slp NR/TJZ/SQR Attachment cc: Mr. P. Tam, Project Manager (w/o/a)

Mr. L. Prividy NRC Resident Inspector (w/a)

INP0 Records Center (w/o/a)

NRC Document Control Desk (w/o/a)

United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Seismic And Dynamic Qualification Program For Safety-Related Equipment Page 4 COMMONWEALTH OF PENNSYLVANIA )

) SS:

COUNTY OF BEAVER )

On this Mk day of //AL/ , /[ , before me, a l Notary Public in and for said Conhnonwealth and County, personally appeared E. J. Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.

ALld' b Notary Public W4/

SHULA E. F#TTDRE. ECTARY PUBUC SHIPPilNiPORT BORD, BEAVER COUNTY NY C089ttlS580N EXPlRES OCT. 23.1989.