Forwards Application for Amend to License DPR-59,changing Tech Specs to Add Requirement to Test Main Control Room Emergency Ventilation Air Supply Every 18 Months.Fee Paid
ML20203D138
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/15/1986
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Muller D
Office of Nuclear Reactor Regulation
Shared Package
ML20203D143 List:
References
JPN-86-18, NUDOCS 8604220041
Download: ML20203D138 (2)


Text

_ _ _ _ _ _ _

'a 123 Main Street 1

Whte Ptains, New%rk 10601 914 681 6240 I

  1. > NewWrkPbwer c",t"";"

m,

& Authority

~- >< o- -

April 15, 1986 JMJ-86-18 Director of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. Daniel R. Muller, Director BWR Project Directorate No. 2 Division of BWR Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Regarding Main Control Room Emergency Ventilation Air Supply System Capacity Test (JPTS-82-01)

Reference:

1.

PASNY letter, J.

P.

Bayne to T.

A.

Ippolito, dated August 13, 1981 (JPN-81-60), " Control Room Habitability Requirements".

Dear Sir:

The Authority is requesting an amendment to the James A.

FitzPatrick Technical Specifications to add a requirement to test the Main Control Room Emergency Ventilation Air Supply System.

This amendment would require a test of the system capacity overy 18 months to assure that it is +10 percent of the design value of 1000 cfm.

In addition a new paragraph is added to the Bases section to describe the purpose of the test.

The emergency ventilation system supplies air to the Main Control Room thereby maintaining a slight positive pressure and minimizing in-leakage.

This change is submitted in accordance with an Authority commitment made in Reference 1.

f The proposed change pages are Attachment I of this Application j

for Amendment, and the associated Safety Evaluation is Attachment II.

Enclosed for filing are three (3) signed originals and nineteen (19) copies of a document titled " Application for Amendment to Operating License", together with forty (40) copies of Attachments I and II thereto, comprising a statement of the proposed change to Appendix A of the Technical Specifications and associated Safety Evaluation.

f In accordance with the requirements of 10 CFR 50.91, a copy of this application, with attachments, is being provided to the db designated New York State official.

/80 8604220041 860415 f

DR ADOCK 05000333 PDR

f i

i I~*

As per 10 CFR 170.12, enclosed is a check in the amount of

$150.00 as the amendment fee for this application.

Should you or your staff have any questions regarding the proposed change, please contact Mr.

J. A.

Gray, Jr. of my staff.

l Very truly yours, Brons John C.

Senior Vice President

(

Nuclear Generation l

Encs.

cc:

Office of the Resident Inspector U.S.

Nuclear Regulatory Commission Post Office Box 136 Lycoming, New York 13093 Mr.'J.

D.

Dunkleberger Division of Policy Analysis and Planning New York State Energy Office Agency Building 2, Empire State Plaza Albany, New York 12223 i