ML20198Q385

From kanterella
Jump to navigation Jump to search

Ack Receipt of 10CFR50.54(a) Submittal,Dtd 971118,which Proposed Changes to QA Program Description.Based on Current Review Schedule It Will Require More than 60 Days to Complete Evaluation
ML20198Q385
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/16/1998
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
References
TAC-MA0188, TAC-MA0189, TAC-MA188, TAC-MA189, NUDOCS 9801230010
Download: ML20198Q385 (3)


Text

_ __

January 16, 1998 Mr. D.' N. Morey -

Vice President - Farley Project -

Southem Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

QUALITY ASSURANCE PRC' GRAM DESCRIPTION CHANGE -

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. MA0188 AND MA0189)

Dear Mr. Morey:

This letter is to acknowledge the receipt of your 10 CFR 50.54(a) submittal dated November 18, 1997, which proposed changes to your Quality Assurance Program description. Based cn our current review schedule, we anticipate that it will require morn than 60 days to complete our evaluation. The staff feels that more detailed information is needed in the Final Safety Analysis Report Quality Assurance Program description for the " Instrument Calibration Labelirsg" change. Subsequent to the completion of our review, you will be notified of the results.

If you require any clari5 cation regarding this letter, please call me at (301) 415-2426.

Sincerely,

[acobimrnNanhroject Manager Project Directorate ll-2 Division of Reactor Projects - 1/11

,j Office of Nuclear Reactor Regu!ation

)

Docket Nos. 50-348 and 50-364 cc: See next page DISTRIBUTION:

4 R RIIN W M e a WHaass PUBLIC RSmith PD 11-2 Rdg.

OGC hhh (g}[

HB kow-Jo son, Ril LBerry PSkinner, Rl!

JZimmerman

' DOCUMENT NAME: G:\\FARLEY\\QA60 DAY.FA1 To receive a copy of this document, indicate in the box: "C" = Copy without

attachmentleaclott by "E" = Copy with attar.hment/ enclosure "Pf' = No copy OFFICE PM:Pf@-7 l

LA:PDil-2n J Q HQMB lD:P N fyl-

NAME J2ffWlif(MAN
en LBEF3RY %D SBLACICDV HBll$0iN lDATE

/ /JfT98

} /@/98 -

/ //T/98 l /15/98

\\

DFFICIAL RECORD COPY

~ 9901236010 9901'16 Y

ll% ll llll llll ll a

p aat:0 p

UNITED STATEP g

[

NUCLEAR REGULATORY COMMISSION.

%,*****/g WASHINGTON. D.C. 308e6-0001 p

January 16, 1998 Mr. D. N. Morey Vice President-Farley Project Southem Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

QUALITY ASSURANCE PROGRAM DESCRIPTION CHANGE JOSEPH M. FARLEY NiiCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. MA0188 AND MA0189)

Dear Mr. Morey:

This letter is to acknowledge the receipt of your 10 CFR 50.54(a) submittal dated November 18, 1997, wHeh preposed changes to your Quality Assurance Program description. Based on ou' current review schedule, we anticipate that it will r6 quire more than 60 days to complete our evaluation. The staff feels that more detailed laformation is necded in the Final Safety Analysis Report Quality Assurance Program description for the " Instrument Calibration Labeling" change. Subsequent tc the completion of our review, you will be notified of the results.

If you require any clarification regarding this letter, please call me at (301) 415-2426.

Sincerely, AL/<

cob 1. Zi rman, Project Manager y roject Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Cocket Nos. 50-348 and 50-364 cc: See next page I

.. e _,,.;

.. Jonph M. Faley Nucie:r Plant '

s d

I oc::

' Mr. R. D. Hill, Jr, General Manager -'

Southem Nuclear Operating Company :

Post Office Box 470 Ashford, Alabama 36312' Mr. Mark Niuni, Licensing Manager Southem Nuclear Operating Company Post Omco Box 1295 -

l Birmirigham, Alabama 35201-1295

' Mr. M. Stanford Blanton.

Balch and Bingham Law Firm e

Post Omce Box 306 -

- i 1710 dixth Avenue h3rth 4

- Birmmgham, Alabama 35201 Mr. J. D. Woodard Executive Vice President -

l.

Southem Nuclear Operating Company

. Post OfRce Box 1295-Birmingham, Alabama 35201 State Health Omcer Alabama Department of Public Health ri 434 Monroe Streat l-Montgomery, Alabama.36130-1701 Chairman Houston County CommMion Post OfRce Box 6406:

Dothan, Alabama '36302 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S.W.i Suite 23T85 -

' Atlanta, Georgia 30303 Resident inspector U,S. Nuclear F<egulatory Commission.

. 7388 N. State Highway 95

. Columbia, Alabama 36319 1

4 g.

Y

_ j i*

Y b

4.

m.

e e

a NW

  • hew."

Y m

v*v-1--9wW 9

i T '-'e eIn at P