Refers to Insp Completed on 970314 & Predecisional Enforcement Conference on 970418 Re Violations of Operation of Prf.Forwards Nov,List of Conference Attendees,Nrc Slides, & Licensee Presentation Matls
ML20196G415
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/06/1997
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20196G420 List:
References
50-348-97-04, 50-348-97-4, 50-364-97-04, 50-364-97-4, EA-97-130, NUDOCS 9705200224
Download: ML20196G415 (4)


Text

,-

< )

1 May 6, 1997 EA 97-130 Southern Nuclear Operating Company, Inc.

ATTN: Mr. D. N. Morey

-Vice President Farley Project ,

P. O. Box 1295  !

Birmingham, AL 35201-1295

SUBJECT:

NOTICI 0F VIOLATION (NRC INSPECTION REPORT 50-348/97-04 AND 50-364/97-04)

Dear Mr. Morey:

This refers to the ins)ection completed on March 14, 1997, at Southern Nuclear Operating Company's (sic) Farley nuclear facility. The purpose of the inspection was to review operation of the penetration room filtration (PRF) system. The results of the inspection were formally transmitted to you by letter dated A)ril 2,1997. An open, predecisional enforcement conference was conducted in t1e Region II office on April 18, 1997, with you and members of your staff to discuss the apparent violations. the root causes, and corrective actions to preclude recurrence. A list of conference attendees and copies of NRC slides and SNC's presentation materials are enclosed.

Based on the information developed during the insaection and the information that was provided during the conference, the NRC 1as determined that violations of NRC requirements occurred. The violations are cited in the enclosed Notice of Violation (Notice), and the circumstances surrounding them are described in detail in the subject inspection report. Violation A involved the failure to prescribe documente ' instructions or procedures to govern activities affecting quality with rt ard to operation of the PRF system, as required by 10 CFR 50, Appendix B, Criterion V. The violation resulted in inadequate operating, surveillance, and emergency procedures and a failure to meet Technical Specification (TS) surveillance requirement 4.7.8.b.3. Violation B involved a failure to comply with specific sections of ANSI N510-1980, prescribed as TS surveillance requirements for the PRF system, control room emergency filtration system, and containment purge exhaust filtration. Violation C involved a failure to identify a significant condition adverse to quality, i.e., excessive inleakage into the penetration room boundary. The root cause of Violations A, B and C was the failure to incorporate design and operational characteristics of the PRF system as )

described in the Final Safety Analysis Report into plant procedures. /

Violations A, 3 and C have each been categorized at Severity Level IV. /

It is noted that during the predecisional enforcement conference, SNC stated that the procedural issues described in Violation A were considered by SNC to be enhancement issues and not violations of NRC requirements. SNC also maintained, with regard to Violation B, that at the time the ANSI N510-1980 recuirements were implemented they were considered to be technical guidance anc not verbatim requirements. SNC maintained that failure to strictly comply

~

9 7 0 5ADOCK gDR 2 0 0 2 05W 2 4 9 7 ".8 H,E,E,H,,H,il,lH,

~

.___........................... Ed(

1 s .>

SNC. Inc. 2 l

with the ANSI requirements did not affect the ability of the PRF system to perform its intended safety function. SNC further stated that although they

, agreed that the PRF boundary was degraded, boundary integrity was adequate and l the PRF system could still have performed its intended safety function. The t

NRC is very concerned that degradation of the PRF boundary has occurred over several years with no actions taken by the licensee to identify the fact that degradation existed. The licensee a) pears to have no method to assure that degradation does not reach a level tlat would prevent the system from aerforming.its safety function. Although Violations A. B. and C have each i

)een categorized at Severity Level IV. you should be aware that considerable i consideration was given to c:.tegorizing the violations at Severity Level III and proceeding with escalated enforcement action on this issue.

Violation D described in the enclosed Notice involved fuel movement activities under conditions archibited by TS 3.9.13. Specifically, your staff performed fuel movement witlin the Unit 2 spent fuel pit with the A train PRF system inoperable and the B train PRF system not aligned to the spent fuel pool room.

The violation has been categorized as a Severity level IV violation. The basis for this violation is further discussed in a March 6.1997 letter to you from the NRC. In addition, an apparent violation was identified in NRC Inspection Report No. 50-348, 3o4/97-04 for the failure to report this iondition. At the predecisional enforcement conference, you indicated that, on November 27, 1996. you requested an NRC interpretation of the TS governing this issue. You based your reporting date on the date of the NRC response, i .e. . March 6,1997, and you submitted Licensee Event Report No.97-002. which described the event, on April 2.1997, which is within 30 days of March 6, 1997. The NRC agrees that you reported the situation appropriately, and therefore, this apparent violation is withdrawn.

NRC Inspection Report No. 50-348.364/97-04 also identified an apparent violation for failure to meet the surveillance requirements of TS 4.7.8.b.3.

On January 28. 1997. you determined that, due to transposition errors in the test data, the PRF system flow rate had been 5615 cubic feet per minute (cfm) during the December 1, 1992 PRF surveillance test. which was outside the TS SR 4.7.8.b.3 acceptance criteria of 5000 cfm 10 percent. This issue was not the subject of a previous NRC violation or previous licensee finding.

Moreover, you have completed corrective action to ensure that the violation will not recur. Therefore, this violation has been categorized as a non-cited violation and is considered closed.

At the predecisional enforcement conference, you also stated that SNC did not agree with the NRC staff conclusion in Section 02.1 of NRC Ins)ection Report No. 50 348.364/97-04 regarding the need for operation of the PRF during small break loss of coolant accidents. You stated that after a review of the Farley licensing basis. SNC concluded that the PRF system was only required in the event containment pressure caused a containment Phase B isolation signal.

l This matter is under review by the NRC Office of Nuclear Reactor Regulation, j and you will be advised of our determinations in this regard by separate l correspondence.

l ,

l I

,' SNC, Inc. 3  :

You are required to respond to this letter and should follow the instructions i specified in the enclosed Notice when preparing your response. The NRC will i use your response, in part, to determine whether further enforcement action is l i necessary to ensure compliance with regulatory requirements.

i In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a co)y of i this letter, its enclosures, and your response will be placed in the NRC i Public Document Room.

j Should you have any questions concerning this letter, please contact us.

Sincerely.

Original Signed by Luis A. Reyes Luis A. Reyes Regional Administrator Docket Nos.: 50-348 and 50-364 License Nos.- NPF-2 and NPF-8

Enclosures:

1. Notice of Violation
2. List of Conference Attendees
3. NRC Presentation Materials
4. Licensee Presentation Materials cc w/encls:

M. J. Ajluni Licensing Manager Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, AL 35201-1295 R. D. Hill, Jr.

General Manager Farley Plant Southern Nuclear Operating i Company, Inc. ,

P.t 0. Box 470 Ashford, AL 36312 R. Badham, Supervisor Safety Audit and Engineering Review Farley Nuclear Plant P. O. Box 470 Ashford, AL 36312 cc w/encis: (See page 3) l l

, a SNC. Inc.

Qistribution w/encls-PUBLIC LJCallan. EDO HThompson. DEDR EJordan DEDO GTracy, OEDO LReyes. RII LChandler, OGC JGoldberg, OGC RZimmerman, NRR EJulian. SECY BKeeling. CA Enforcement Coordinators RI, RIII. RIV JLieberman, OE OE:EA File (BSummers) (2 letterhead)

MSatorius OE DNelson, OE EHayden. OPA GCaputo. OI Dross, AE0D HBell, OIG CEvans RII ..

Buryc, RII JJohnson, RII JJaudon, RII PSkinner, RII (IFS Action Required)

HBerkow, NRR JZimmerman, NRR KClark, RII RTrojanowski,RII NRC Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia. AL 36319 srnn To p@t F Nv1prNT DTM VTs [

OrriCF Ril fWP R11 OPS Ril RC Ril ffC$ DPA i~m is Vsk .omo en a qi /

umr x d 'MAUDN CEVANSW h0RYC JLIEBERMAN o,1< es , 4 , ,, m ,,,  % 2. ,e, es , n. , ,, os ,or, ,,

-m, A r vr- - sr- A #1s e, vr- u, OrritIAL RECORD COPYUDOCUMENT NAME: H\1970 PEN. ENF\97130 F AR .DIR\M RV1