Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
- u Q .
hiuclear Opera ng .ompany W g -g swManwuawemeow cvy eaan:n nwas ramu m
. October 15,1998 NOC-AE-000329 File No. G02 STI30733511 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk
~ Washington, DC 20555 South Texas Project
' Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for September 1998 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for September 1998.
i
. If you should have any questions on this matter, please contact R. L. Hill at (512) 972-7667.
Sincerely, F. H. Mallen Manager, Planning & Controls I RLH/sl Attachments: 1) STPEGS Unit 1 Monthly Operating Report - September 1998
- 2) STPEGS Unit 2 Monthly Operating Report - September 1998
'/
~
Q Y^
9810220047 980930 E PDR ADOCK 05000498
NOC-AE-000329 File No.: G02 Page 2 c: Jon C. Wood Ellis W. Merschoff Matthews & Branscomb Regional Administrator, Region IV One Alamo Center U. S. Nuclear Regulatory Commission 106 S. St. Mary's Street, Suite 700 611 Ryan Plaza Drive, Suite 400 San Antonio,TX 78205-3692 Arlington, TX 76011-8064 Institute of Nuclear Power
. Thomas W. Alexion Operations - Records Center Project Manager, Mail Code 13H3 - 700 Galleria Parkway U. S. Nuclear Regulatory Commission Atlanta, GA 30339-5957 Washington, DC 20555-0001 Richard A. Ratliff Cornelius F. O'Keefe Bureau of Radiation Control Sr. Resident Inspector Texas Department of Health c/o U. S. Nuclear Regulatory Commission 1100 West 49th Street P. O. Box 910 Austin, TX 78756-3189 Bay City, TX 77404-0910 D. G. Tees /R. L. Balcom J. R. Newman; Esquire : Houston Lighting & Power Co. ,
Morgan, Lewis & Bockius P. O. Box 1700 j 1800 M. Street, N.W. Houston,TX 77251 :
Washington, DC 20036-5869 l Central Power and Light Company M. T. Hardt/W. C. Gunst ATTN: G. E. Vaughn/C. A. Johnson !
City Public Service P. O. Box 289, Mail Code: N5012 l P. O. Box 1771 Wadsworth,TX 77483 San Antonio,TX 78296 U. S. Nuclear Regulatory Commission A. Ramirez/C. M. Canady Attention: Document Control Desk
. City of Austin' Washington, D.C. 20555-0001 Electric Utility Department 721 Barton S 7 ngs i Road Austin,TX 78704
. . g-
, l
!- l 9 -
l I- -
]
.i
- + c f
!' )
l- i i
SOUTH TEXAS PROJECT l ELECTRIC GENERATING STATION 4 L
uc,:_
l- }- .
u MONTHLY OPERATING REPORT SEPTEMBER 1998 -
.i l
STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 l
LICENSE NO. NPF ;
1 j- _
l Reviewed By: d[M /s//. fdps -
D.L. COBB Date Approved By: / /o////F' G.L. PARKEY f Datl '1 I
I I
1:
l l,
?,>
?
y' .
MONTHLY
SUMMARY
South T6xas Project Unit 1 began the reporting period operating at full power.
On September 12, at 0501 the main turbine was removed from service to disconnect the auxiliary transformer to allow repairs. The unit was returned to service at 1523 and achieved full power on September 13, at 1504.
On September 19,'at 0500 the main turbir.e was removed from service to reconnect the auxiliary transformer following repairs. The unit was returned to service at 1457 and achieved full power on September 20, at 1201.
-The unit operated for the remainder of the reporting period with no unit shutdowns or significant power reductions.
, . _ _ _ _ .__-..-_-._._.___...._._-m..._ ..
-4 .
6 l e, OPERATING DATA REPORT .
f DOCKET NO. 50-498
...~ 1 UNIT ~Oct.12,1998 DATE COMPLETED BY R.L. Hill TELEPHONE ' 512 972-7667 OPERATING STATUS
.li . REPORTING PERIOD: 9/1/98-9/30/98 GROSS HOURS IN REPORTING PERIOD: 72'O '
~ 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net):-1250.6
- DESIGN ELECTRICAL RATING (MWe-Net):' 1250.6
. 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None .
i4' .
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE - CUMULATIVE -
' 5. NUMBER OF HOURS REACTOR CRITICAL. 720.0 6,551.0 64,587.1
- 6. REACTOR RESERVE SHUTDOWN HOURS - 0 0 .0
' 7. HOURS GENERATOR ON LINE 699.7 6,530.7 63,105.6 !
- 8. UNIT RESERVE SHUTDOWN HOURS ~ 0' 0 0 l
9.. . GROSS THERMAL ENERGY GENERATED (MWH) 2,565,574 24,736,175 234,053,767
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 868,197.' 8,456,955 79,816,519.
I1. NET ELECTRICAL ENERGY GENERATED (MWH) 826,937 8,099,312 76,012,058 12.~ REACTOR SERVICE FACTOR 100.0 % 100.0 % ' 72.9%
- 13. REACTOR AVAILABILITY FACTOR 100.0 % 100.0 % 72.9 %
.14. . UNIT SERVICE FACTOR 97.2 % 99.7 % 71.3%
- 15. ' UNIT AVAILABILITY FACTOR - 97.2% _ 99.7 % 71.3%
- 16. UNIT CAPACITY FACTOR (Using MDC) - 91.8 % 98.9 % 68.7 %
^ 17.~ UNIT CAPACITY FACTOR (Using Design MWe) 91.8 % 98.9 % 68.7 %
! 18.' UNIT FORCED OUTAGE RATE 0.0% 0.0% 18.7%
- 19) ' SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
J Scheduled 40-day outage to allow refueling and 10-year in service inspection to begin on March 27,1999.
I 20.' IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A t
[.
r-
-m . _ . _ . . . _ _ . . _ - . . _ s. _ . _ , . - .. - . _ _ . , _ . .
,..c.- !
i
, ! 4 .' .
AVERAGE DAILY UNIT POWER LEVEL l 1
DOCKET NO. 50-498 j
DATE det.12,1998 COMPLETED BY R.L.11111 TELEPHONE 512 972-7667
'-M NTII- SEPTEMBER i
DAY, AVERAGE DAILY POWER DAY AVERAGE DAILY POWER
- LEVEL- LEVEL (MWe-Net) (MWe-Net) 1
.l' 1243 17. 1250 ;
' 2' 1244 18 1250 !
- 3. 1240 19 103-
'4 1242~ 20 1023 '!
[
'5 1242 21- 1242 )
6 .1242 22 1239 7' 1242' 23 1243
'8 -1240 24 1243 9 1245- 25 . 1241
' 10 . 1247 26 1242
- .11 '1249. 27 1241
'12
- 106_ . 28 .1242 13 '. .898' 29 1241 I I
14 1248- 30 123,7
~15 1248. .31 J N
16 - 1244 ;
L r i
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 -
UNIT 1, DATE Oct.12,1998
' COMPLETED BY R.L Hill TELEPHONE 512 972-7667 REPORTMONTH SEPTEMBER ,
1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor 98-03 980912 S 10.3 B 1 N/A EA XFMR Main turbine removed from service to disconnect the Auxiliary Transformer to allow repairs.
98-04 980919 S 10.0 B 1 N/A EA XFMR Main turbine removed from service to reconnect the Auxiliary Transformer following repai s.
I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
('
l .
PORVS AND SAFETY VALVE
SUMMARY
There were nc PORV or Safety Valves challenged during the reporting period.
1 P
e
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT SEPTEMBER 1998 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Reviewed By: M ////J/pg_
D.L. COBB Date '
Approved By: " /0 [f!fI R.E. MASSE Date'
l l
l MONTIILY
SUMMARY
l South Texas Project Unit 2 began the reporting period operating at full power.
)
l On September 22, at 0932 the unit experienced an automatic reactor trip due to low water level in the 2A l steam generator caused by an inadvertently closed feedwater regulating valve. The unit was returned to l service on September 23, at 0637 and achieved full power on September 26, at 0706.
On September 27, at 0827 the unit began a reactor power coastdov n due to fuel burnup. The process entails a power reduction rate of 1-percent every 36 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
The unit concluded the reporting period operating at 96-percent reactor power.
l l
l l
1 l l l
l l
l
u OPERATING DATA REPORT DOCENT. 50-499 UNIT 2 DATE Oct.12,1998 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 OPERATING STATUS
- 1. REPORTING PERIOD: 9/1/98-9/30/98 GROSS HOURS IN REPORTING PERIOD: 720
~
- 2. - CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 I MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 l
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net); None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE l
5, NUMBER OF HOURS REACTOR CRITICAL 706.5 6,515.0 61,306.4 i
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 p 0 l
- 7. HOURS GENERATOR ON LINE 698.9 6,450.7 59,739.0 i
- 8. UNIT RESERVE SHUTDOWN HOURS p p 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,580,964 24,483,520 221,827,030
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 874,448 8,351,818 75,516,797
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 833,625 7,997,943 72,078,120
- 12. REACTOR SERVICE FACTOR 98.1 % 99.5 % 75.3 %
- 13. REACTOR AVAILABILITY FACTOR 98.1 % 99.5% 75.3 %
- 14. UNIT SERVICE FACTOR 97.1 % 98.5 % 73.4 %
- 15. UNIT AVAILABILITY FACTOR 97.1 % 98.5 % 73.4 %
- 16. UNIT CAPACITY FACTOR (Using MDC) 92.6 % 97.6 % 70.8 %
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 92.6 % 97.6 % 70.8 %
- 18. UNIT FORCED OUTAGE RATE 2.9% l .0% 18.1 %
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 21-day refueling outage to begin on October 3,1998.
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
f AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Oct.12, 1998 COMPLETED BY R.L. Ilill TELEPHONE 512 972-7667 MONTil SEPTEMBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1240 17 1245 2 1241 18 1246 3 , 1240 19 1245 4 1237 20 1242 5 1238 21 1235 6 1239 22 460 7 1240 23 29 8 1242 24 8 9 1244 25 1208 1 1
10 1245 26 1232 11 1247 27 1218 12 1246 28 1212 l
13 1247 29 1202 14 1245 30 1186 15 1245 31 NA 16 1246
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKE1NO. 50-499' UNIT 2 DATE Oct.12,1998 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 REPORTMONTH SEPTEMBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor 98-02 980922 F 21.1 11 3 2-98-002 SJ FCV The unit experienced an automatic reactor trip due to decreased water level in the 2A steam generator. The level decrease followed the inadvertent closure of the 2A main feedwater regulating valve during corrective maintenance on the control circuitry of the 2A low power feedwater reguating valve. Work instructions governing the activity were technically incorrect.
Corrective actions include reviewing other similar work, discussing lessons learned and developing a case study.
98-03 980927 S 0.0 H 5 N/A N/A N/A 7he unit began a reactor power coastdown due to fuel burnup.
I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
PORVS AND SAFETY VALVE
SUMMARY
. There were no PORV or Safety Valves challenged during the reporting period.
d
. .- _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _