U.S. NUCLEAR REGULATORY COMMISSION Office of Inspector and Auditor o.. o. i,.n,c,,,,,.. September 1. 1983 Report of Interview Lindsey Harris, Inspector, Duke Power Company (DPC), was interviewed at the office of the NRC Senior Resident Inspector (SRI) at the Catawba Nuclear Power Station (CNPS). Mr. Harris, who since he commenced his employment with DPC on July 19, 1976, provided the following information:
He was unaware of any incidents of harassrent or intimidation of DPC. employees as a result of having contacted NRC and was unaware of any other incidents where any form of Recrimination was directed by DPC management toward any employee for voicing possibly unpopular or problemmatic opinions. The onl incident he wished to relate to the Office of Inspector and Auditor (0IA) y occurred at Reactor No. 2 (location 0 degrees, 572 elevation, G Frame) since from an inspection standpoint he was concerned about rupture strengths of welds. He described that the particular weld about which he was concerned and cited had some gouges which did not meet the appropriate standards of the American National Standards Institute.
Accordingly, he notified his immediate supervisor, Charles Ross, who in turn notified his supervisor Charles Baldwin.
Baldwin then advised him that he would have the design engineers check the particular gouge / weld and then directed him to sign off on the weld.
He did, in fact, sign off on the weld prior to viewing the design engineers results ar.d did so on the assurance of Baldwin that this would be properly done.
He concluded the interview by advising he had no additional information to provide OIA.
8511140447 e51017 PDR FDIA GILINSM85-437 PDR August 24, 1983 Rock Hill, S.C.